TOMORROWS TRANSPORTATION NEWS TODAY!

Category: Railroad (Page 9 of 16)

Alstom Leads Way for Automated Train Operation in Stuttgart Network

Alstom (OTC: ALSMY) has signed a contract with Germany’s Baden-Wuerttemberg State Institute for Rail Vehicles (SFBW) to retrofit 118 regional trains with the European Train Control System (ETCS) Automatic Train Operation (ATO) digital signalling technology. Part of the Stuttgart Digital Node lighthouse project, the contract is valued at approximately 130 million euro1 and includes an innovation cooperation agreement software maintenance contract and a contract for further maintenance.

In addition to the recently announced S-Bahn project, the new retrofit project covers 118 trains that SFBW operates on the high-traffic Stuttgart network. The trains come from several different suppliers and will be upgraded with the European Train Control System (ETCS) Level 2 and 3 as well as Automatic Train Operation (ATO) level 2 (GoA2) technology. The initial upgrade project will be completed by 2024 and the subsequent upgrade, according to the European Technical Specifications for Interoperability 2022, will be completed by 2027. 

While ATO technology has already been implemented in metros and urban rail lines in cities like Paris, the highly automated operation (GoA 2) is now being used for the first time in Germany on the basis of ETCS Level 2 in the Stuttgart Digital Node.  When completed in 2024, the new signalling technology will increase capacity and frequency on the Stuttgart network while also making the trains performance more sustainable.

As part of the agreed innovation cooperation, Alstom and SFBW will also define the requirements for Train Integrity Monitoring (TIM), Future Railway Mobile Communication System upgrade capability, Train Capability and for Open CCS On-board Reference Architecture (OCORA). The implementation of the developed requirements by Alstom is part of the contract, as is the software maintenance of the regional trains.

The project is being carried out by the Alstom signalling site in Berlin, Germany, in close cooperation with the ETCS competence center in Charleroi, Belgium. Other locations involved in the various project phases are Braunschweig, Salzgitter, Mannheim and Hennigsdorf in Germany as well as Bangalore, India, Bucharest, Romania and Lyon-Villeurbanne, France. The series installation will take place close to Stuttgart or in Hennigsdorf.

Alstom Successfully Commissioned First Seven Freight Locomotives in Azerbaijan

Alstom has successfully commissioned the first 7 Prima T8 AZ8A freight locomotives to Azerbaijan Railways (ADY). These locomotives will run on the main freight transit line, which has recently been converted from 3 kV DC to 25 kV AC.

The Prima T8 AZ8A locomotives will be running initially on the “Silk Road” East-West corridor of Azerbaijan linking the Caspian Sea main ports to the Georgian border and later all across the country.

In 2014, ADY signed a contract with Alstom for €288 million for supplying 50 electric locomotives, including 40 Prima T8 AZ8A heavy freight locomotives which are being produced at Alstom’s JV EKZ in Nur-Sultan, Kazakhstan and 10 Prima M4 AZ4A passenger locomotives which have been produced in Belfort, France and already delivered to Azerbaijan.

Alstom’s Prima T8 is one of the most powerful electric locomotives in the world. This model is a 25 tons per axle two-section freight locomotive capable of towing up to 9,000 tons and running at 120 km/h, with installed continuous power of 8.8 Megawatts. The Prima T8 AZ8A is designed to operate in temperatures ranging from -25°C to 50°C. It requires minimum maintenance and provides high reliability levels and low lifecycle costs thanks to its modular design.

Alstom’s Prima range is covering all market segments of locomotives from heavy-haul, freight and passenger operation and shunting or track work operation. Over the past 20 years, more than 3,200 Prima locomotives (more than 4,600 sections) have been sold worldwide.

Alstom is present in Western & Central Asia with more than 1,000 people, three country offices in Kazakhstan, Azerbaijan and Uzbekistan, five depots, repair center and two plants, EKZ in Nur-Sultan for electric locomotives manufacturing and maintenance and production of on-board transformers, and KEP in Almaty to produce point machines. Alstom is a major contributor to the revitalization of the region’s mobility industry and the development of its economy. 

EKZ, a joint venture of Alstom, employs around 850 people and is working on supplying and maintaining the Prima electric locomotives ordered by KTZ, Kazakhstan’s national railway company and export markets, like Azerbaijan.

Alstom Wins Largest Railway Contract in History of Denmark

First order from landmark framework agreement with DSB covers 100 Coradia Stream trains and 15 years of maintenance.

Alstom, a global leader in smart and sustainable mobility, has won the largest train tender in Danish rail history. Part of a landmark framework agreement with Danish State Railways (DSB) valued at a total of €2.6 billion, the first firm order of 100 Coradia Stream regional trains as well as a 15-year full-service maintenance agreement amounts to a value of €1.4 billion. The framework agreement includes an additional 15 years of maintenance services and the possibility to order additional trainsets.

Delivery of DSB’s new trains is scheduled to begin in the last quarter of 2024. Once in service, this new fleet will operate as a regional and fast rail service and connect Denmark’s northern region to the capital city of Copenhagen, before proceeding south to Lolland. 

The Coradia Stream for DSB has been specially adapted to meet the needs of the Danish rail network and its top speed of 200 km/h will help ensure swift mobility across the country. Each trainset will consist of five single- deck coaches with a total seating capacity for 300 passengers. The trains will be pre-fitted with Alstom’s Atlas onboard ETCS Baseline 3 system, as well as an STM interface enabling it to operate on Denmark’s legacy signalling system.

Adapted Alstom Euroduplex Trains for Spanish Network Brought into Service

Four Avelia Euroduplex trains from the SNCF fleet will enter commercial service on Monday 10 May 2021 on the Madrid-Barcelona route. They will be operated by OUIGO España, a local subsidiary of SNCF. The trains have been converted by Alstom and SNCF to run on the Spanish high-speed rail network.

Following on from these first four trains, 10 other trains are currently being converted by Alstom to serve several high-speed routes in Spain: initially, the Madrid-Valencia and Madrid-Alicante routes and subsequently, Andalusia (Madrid-Seville and Madrid-Malaga). OUIGO España will thus have a fleet of 14 trains for 5 destinations departing from Madrid: Barcelona, Valencia, Alicante, Seville, and Malaga.

During the conversion process of the trains, Alstom developed and deployed on-board signalling equipment architecture, necessary for rail traffic safety and performance, based on its digital ERTMS[1] solution Atlas. This solution ensures that Avelia Euroduplex trains are compliant and can be approved for Spanish infrastructures.

Stadler and Siemens Mobility Win Contract to Modernize and Upgrade Lisbon Metro

The consortium of Stadler and Siemens Mobility have won a €114.5 million contract to provide the Lisbon Metro with a state of the art signaling system and a new fleet of modern trains. Stadler will supply 14 three-car metro trains, while Siemens Mobility will install its Communications-Based Train Control (CBTC) system Trainguard MT on the Blue, Yellow and Green lines, and will upgrade the existing equipment. This will include installing its on-board CBTC technology across 70 trains of the existing fleet, as well as on the 14 new Stadler trains.

The contract includes technical training for operation and maintenance, as well as preventive and corrective maintenance of all equipment for the first three years, and the supply of spares and consumables for preventive maintenance for a further two years. The supply period agreed is 77 months, with provisional acceptance planned for 2027.

Stadler will design the vehicles using a modular methodology to better facilitate maintenance. Its stainless- steel car body ensures the vehicles are lightweight and strong. Three double doors per side and carriage will enable passengers to get on and off quickly and easily.

The 14 three-car trains will initially be fitted with CBTC GoA2 but will have the ability to be upgraded to GoA4, so the service can be fully automated in future. Trains will be powered by third rail at 750 V. The 49.6m long and 2.78m wide vehicles will have 90 seats arranged longitudinally, two places for wheelchair users, and

standing capacity for 450 people (6p/m2). The new rolling stock will increase comfort and accessibility for passengers, as well as provide enhanced communications, safety, and video surveillance systems.

Siemens Mobility CBTC signaling technology provides real-time data on vehicle position and speed conditions operating in moving block principle, allowing system operators to safely increase the number of vehicles on a rail line. This results in greater frequency of train arrivals and allows more passengers to be accommodated on the system. This is the most extensively deployed automatic train control system in the world and is currently being used in Singapore, Turkey, Brazil, Spain, and China.

Stadler Assessment of the First 100 Days of New Berlin and Brandenburg S-Bahn Trains

Berlin’s new S-Bahn trains are a hundred days old, yet already proving highly reliable. The new 483/484 series has passed its baptism of fire and also proved itself during the spell of cold winter weather in February: The trains successfully defied snow, ice, and wind.

The first train punctually entered service at 0.01 a.m. on New Year’s. Since then, the ten pre- series trains have been running on Line S47 (Spindlersfeld – Hermannstraße) and have replaced the old 485 series trains.

With the new trains, S-Bahn Berlin not only offers its passengers greater comfort, but also provides more capacity for our customers. When all the 21 two-car units and 85 four-car units ordered from Siemens Mobility and Stadler have been delivered by the end of 2023, a total of 106 new quarter trains will be in operation.

Beginning this summer, the first series trains will be delivered and join the 483/484 fleet once they have been accepted.

Amtrak Releasing Six 50th Anniversary Commemorative Painted Locomotives

Amtrak fans across the country may soon spot a few freshly painted locomotives featuring new anniversary logos rolling down the tracks as America’s Railroad® celebrates 50 years of service this year. The first of six different commemorative 50th anniversary locomotives has already entered service on the national network.

“We chose locomotives already budgeted for new paint as part of our life cycle preventative maintenance program and used the opportunity to celebrate this significant milestone on the most iconic component of our business,” said Amtrak President Stephen Gardner. “The locomotive designs uniquely honor our heritage and our vision of connecting communities, economies and families nationwide.”

The commemorative locomotive list includes:

  • P42 #46 in “Phase V 50th” – The standard Amtrak livery for the past two decades with our “Connecting America for 50 Years” slogan including a large golden yellow 50.
  • P42 in “Midnight Blue”: An all new one-of-a-kind paint scheme celebrating the dedication and commitment of our employees moving people around the clock and across the nation.
  • P42 in “Phase VI” – The first adaptation of the latest Amtrak livery phase on a P42.
  • P42 in “Phase I” – A rendition of Amtrak’s first livery phase dating back to 1972.
  • P42 in “Dash 8 Phase III” – The award-winning livery designed for the Dash 8 locomotive fleet in the early 90s, adapted for the first time to a P42 locomotive.
  • ALC-42 #301 in “Day 1” scheme – A historic throwback to the unique design created for the first day of operations on May 1, 1971, applied to Amtrak’s newest locomotive.

Each P42 locomotive is being painted and overhauled at the Amtrak Beech Grove shops in Beech Grove, Ind., rolling out over the coming months and entering service across the national network. Employees will also ensure that these locomotives are maintained to high performance and safety standards. ALC-42 #301 is currently being manufactured by Siemens in Sacramento, Calif. and is expected to be delivered in April to undergo testing in the Northeast Corridor before entering service on the national network.

In addition to the commemorative locomotives, 50th Anniversary collectible items are also now available for purchase at the Amtrak store, including t-shirts, glasses, a challenge coin, pins and other celebratory Amtrak gear.

Amtrak 50th – Paint Scheme and Livery History

Stadler Wins Tender to Deliver 59 Trains to Spanish State-Owned Rail Operator RENFE

The Spanish state-owned rail operator RENFE has awarded Stadler a contract to deliver 59 commuter trains, which also includes the spare parts and maintenance for 15 years. This award is one of the batches in the bidding for the high-capacity trains tendered by the Spanish operator. Stadler proposes to maximize the capacity by using double-deck coaches with a scalable length from 100 to 120 meters and from 160 to 240 meters. The Iberian-gauge trains will operate on 3 kV DC overhead lines reaching a maximum speed of 140 km/h. They will provide the commuter service in the largest Spanish cities.

This is the first time that RENFE will order trains from Stadler. The new trains shall be developed and produced in Stadler’s plant in Valencia. The contract envisages an option for 44 additional units as well as their maintenance.

Iñigo Parra, CEO Stadler Valencia, said: “We’re excited about the decision from RENFE and their trust in Stadler. We were chosen to provide trains in our factory in Spain for the Spanish commuter service – this makes us proud.”

Stadler Cal Train rendering of the double decker coaches

Amtrak Expands Carry-On Pet Program to Weekday Acela Trains

WASHINGTON – Amtrak announced today the expansion of its pet program allowing customers to travel with their dogs and cats up to 20 pounds onboard weekday Acela trains for only $26 or 800 Amtrak Guest Rewards points. Previously available for only weekend trips, there will be eight pet spaces for sale per departure (one per customer) and are booked on a first-come, first-served basis.

Pets will be allowed in all cars, except for First Class or Café cars. Pets must remain in a carrier at all times and carriers should remain under their seat. Amtrak continues to welcome service animals on board at no charge. To confirm pet eligibility, all customers must read and sign a Pet Release and Indemnification Agreement for each travel segment. 

This new amenity is part of several recent upgrades on the Acela, including the expansion of the Reserved Seating offering for Acela Business Class customerswhich allows travelers to view and select their seats before traveling, including those available in the Quiet Car, and provide a snapshot of the overall of the train’s capacity. In addition, Amtrak has continues its enhanced cleaning protocols at stations and on trains and new measures to deliver a New Standard of Travel, including:

  • Requiring face coverings: Per federal law and Amtrak policy, all customers and employees must wear a face mask or covering that fully covers the entire mouth and nose, fits snugly against the side of the face, and secures under the chin at all times while onboard and in stations.
  • Air Quality: All of our trains are equipped with onboard filtration systems with a fresh air exchange rate every 4-5 minutes.
  • Physical distancing: Signage has been displayed at our busiest stations to indicate safe distances in high traffic areas. In addition, protective plastic barriers have been installed at customer counters at our busiest stations.

More than 174,300 pets and their human companions have traveled around the country since the program launched on the Northeast Corridor in October 2015. The program has also generated more than $4.338 million in revenue since its inception. For more information visit Amtrak’s Pet policy

« Older posts Newer posts »