TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: defense (Page 10 of 22)

Boeing Reports Third-Quarter Results

– Financial results continue to be significantly impacted by COVID-19 and the 737 MAX grounding

– Proactively managing liquidity and transforming for the future

– Revenue of $14.1 billion, GAAP loss per share of ($0.79) and core (non-GAAP)* loss per share of ($1.39)

– Operating cash flow of ($4.8) billion; cash and marketable securities of $27.1 billion

– Total backlog of $393 billion, including more than 4,300 commercial airplanes

Table 1. Summary Financial ResultsThird QuarterNine Months
(Dollars in Millions, except per share data)20202019Change20202019Change
Revenues$14,139$19,980(29)%$42,854$58,648(27)%
GAAP
(Loss)/Earnings From Operations($401)$1,259NM($4,718)$229NM
Operating Margin(2.8)%6.3%NM(11.0)%0.4%NM
Net (Loss)/Earnings($466)$1,167NM($3,502)$374NM
(Loss)/Earnings Per Share($0.79)$2.05NM($6.10)$0.66NM
Operating Cash Flow($4,819)($2,424)NM($14,401)($226)NM
Non-GAAP*
Core Operating (Loss)/Earnings($754)$895NM($5,773)($864)NM
Core Operating Margin(5.3)%4.5%NM(13.5)%(1.5)%NM
Core (Loss)/Earnings Per Share($1.39)$1.45NM($7.88)($1.13)NM
*Non-GAAP measure; complete definitions of Boeing’s non-GAAP measures are on page 5, “Non-GAAP Measures Disclosures.”

The Boeing Company [NYSE: BA] reported third-quarter revenue of $14.1 billion, GAAP loss per share of ($0.79) and core loss per share (non-GAAP)* of ($1.39), reflecting lower commercial deliveries and services volume primarily due to COVID-19 (Table 1). Boeing recorded operating cash flow of ($4.8) billion.

“The global pandemic continued to add pressure to our business this quarter, and we’re aligning to this new reality by closely managing our liquidity and transforming our enterprise to be sharper, more resilient and more sustainable for the long term,” said Boeing President and Chief Executive Officer Dave Calhoun. “Our diverse portfolio, including our government services, defense and space programs, continues to provide some stability for us as we adapt and rebuild for the other side of the pandemic. We remain focused on the health and safety of our employees and their communities. I’m proud of the dedication and commitment our teams have demonstrated as they continued to deliver for our customers in this challenging environment. Despite the near-term headwinds, we remain confident in our long term future and are focused on sustaining critical investments in our business and the meaningful actions we are taking to strengthen our safety culture, improve transparency and rebuild trust.”

Following the lead of global regulators, Boeing made steady progress toward the safe return to service of the 737 MAX, including rigorous certification and validation flights conducted by the U.S. Federal Aviation Administration, Transport Canada and the European Union Aviation Safety Agency. The Joint Operational Evaluation Board, featuring civil aviation authorities from the United States, Canada, Brazil, and the European Union, also conducted its evaluations of updated crew training. The 737 MAX has now completed around 1,400 test and check flights and more than 3,000 flight hours as it progresses through the robust and comprehensive certification process.

To adapt to the market impacts of COVID-19 and position the company for the future, Boeing continued its business transformation across five key areas including its infrastructure footprint, overhead and organizational structure, portfolio and investment mix, supply chain health and operational excellence. As the company resizes its operations to align with market realities, Boeing expects to continue lowering overall staffing levels through natural attrition as well as voluntary and involuntary workforce reductions, and recorded additional severance costs in the third quarter.

Table 2. Cash FlowThird QuarterNine Months
(Millions)2020201920202019
Operating Cash Flow($4,819)($2,424)($14,401)($226)
Less Additions to Property, Plant & Equipment($262)($465)($1,038)($1,387)
Free Cash Flow*($5,081)($2,889)($15,439)($1,613)
*Non-GAAP measure; complete definitions of Boeing’s non-GAAP measures are on page 5, “Non-GAAP Measures Disclosures.”

Operating cash flow was ($4.8) billion in the quarter, reflecting lower commercial deliveries and services volume primarily due to COVID-19, as well as timing of receipts and expenditures (Table 2).

Table 3. Cash, Marketable Securities and Debt BalancesQuarter-End
(Billions)Q3 20Q2 20
Cash$10.6$20.0
Marketable Securities1$16.5$12.4
Total$27.1$32.4
Debt Balances:
The Boeing Company, net of intercompany loans to BCC$59.1$59.5
Boeing Capital, including intercompany loans$1.9$1.9
Total Consolidated Debt$61.0$61.4
1 Marketable securities consists primarily of time deposits due within one year classified as “short-term investments.”

Cash and investments in marketable securities decreased to $27.1 billion, compared to $32.4 billion at the beginning of the quarter, primarily driven by operating cash outflows (Table 3). Debt was $61.0 billion, down from $61.4 billion at the beginning of the quarter due to the repayment of maturing debt.

Total company backlog at quarter-end was $393 billion.

Segment Results

Commercial Airplanes

Table 4. Commercial AirplanesThird QuarterNine Months
(Dollars in Millions)20202019Change20202019Change
Commercial Airplanes Deliveries2862(55)%98301(67)%
Revenues$3,596$8,249(56)%$11,434$24,793(54)%
Loss from Operations($1,369)($40)NM($6,199)($3,813)NM
Operating Margin(38.1)%(0.5)%NM(54.2)%(15.4)%NM

Commercial Airplanes third-quarter revenue decreased to $3.6 billion, reflecting lower delivery volume primarily due to COVID-19 impacts as well as 787 quality issues and associated rework. Third-quarter operating margin decreased to (38.1) percent, primarily driven by lower delivery volume, as well as $590 million of abnormal production costs related to the 737 program.

Commercial Airplanes added the final 777X flight test airplane to the test program and the GE9X engine received FAA certification. In October, the company decided it will consolidate 787 production in South Carolina in mid-2021, which did not have a significant financial impact on the program in the third quarter. Commercial Airplanes delivered 28 airplanes during the quarter, and backlog included over 4,300 airplanes valued at $313 billion.

Defense, Space & Security

Table 5. Defense, Space & SecurityThird QuarterNine Months
(Dollars in Millions)20202019Change20202019Change
Revenues$6,848$7,002(2)%$19,478$20,168(3)%
Earnings from Operations$628$754(17)%$1,037$2,581(60)%
Operating Margin9.2%10.8%(1.6) Pts5.3%12.8%(7.5) Pts

Defense, Space & Security third-quarter revenue decreased to $6.8 billion, primarily due to derivative aircraft award timing, partially offset by higher fighter volume (Table 5). Third-quarter operating margin decreased to 9.2 percent reflecting less favorable performance, including a $67 million KC-46A Tanker charge.

During the quarter, Defense, Space & Security received an award for eight F-15EX advanced fighter aircraft for the U.S. Air Force and a contract extension for the International Space Station for NASA, as well as contracts for nine additional MH-47G Block II Chinook helicopters for the U.S. Army Special Operations and four additional 702X satellites. Also in the quarter, the U.S. Air Force and Boeing team was awarded the Collier Trophy for aerospace excellence for the X-37B autonomous spaceplane. Significant milestones included inducting the 20th U.S. Navy F/A-18 into the Service Life Modification program as well as delivering the firstBell Boeing V-22 Osprey to Japan and the first MH-47G Block II Chinook to the U.S. Army Special Operations.

Backlog at Defense, Space & Security was $62 billion, of which 30 percent represents orders from customers outside the U.S.

Global Services

Table 6. Global ServicesThird QuarterNine Months
(Dollars in Millions)20202019Change20202019Change
Revenues$3,694$4,658(21)%$11,810$13,820(15)%
Earnings from Operations$271$673(60)%$307$2,013(85%)
Operating Margin7.3%14.4%(7.1) Pts2.6%14.6%(12.0) Pts

Global Services third-quarter revenue decreased to $3.7 billion, driven by lower commercial services volume due to COVID-19, partially offset by higher government services volume (Table 6). Third-quarter operating margin decreased to 7.3 percent primarily due to lower commercial services volume and additional severance costs.

During the quarter, Global Services signed an agreement with GECAS for 11 737-800 Boeing Converted Freighters, secured a six-year P-8A support contract for the Royal Australian Air Force, and was awarded F-15EX training and services support contracts by the U.S. Air Force. Global Services also delivered the first P-8A Operational Flight Trainer for the United Kingdom Royal Air Force.

Additional Financial Information

Table 7. Additional Financial InformationThird QuarterNine Months
(Dollars in Millions)2020201920202019
Revenues
Boeing Capital$71$66$205$207
Unallocated items, eliminations and other($70)$5($73)($340)
Earnings from Operations
Boeing Capital$30$29$47$86
FAS/CAS service cost adjustment$353$364$1,055$1,093
Other unallocated items and eliminations($314)($521)($965)($1,731)
Other income, net$119$121$325$334
Interest and debt expense($643)($203)($1,458)($480)
Effective tax rate49.6%0.8%40.1%(350.6)%

At quarter-end, Boeing Capital’s net portfolio balance was $2.0 billion. The change in revenue and earnings from other unallocated items and eliminations was primarily due to the timing of cost allocations. Earnings from other unallocated items and eliminations was also impacted by lower enterprise research and development expense. Interest and debt expense increased due to higher debt balances. The third quarter effective tax rate reflects tax benefits related to the five year net operating loss carryback provision in the Coronavirus Aid, Relief, and Economic Security (CARES) Act as well as the impact of pre-tax losses.

Non-GAAP Measures Disclosures

We supplement the reporting of our financial information determined under Generally Accepted Accounting Principles in the United States of America (GAAP) with certain non-GAAP financial information. The non-GAAP financial information presented excludes certain significant items that may not be indicative of, or are unrelated to, results from our ongoing business operations. We believe that these non-GAAP measures provide investors with additional insight into the company’s ongoing business performance. These non-GAAP measures should not be considered in isolation or as a substitute for the related GAAP measures, and other companies may define such measures differently. We encourage investors to review our financial statements and publicly-filed reports in their entirety and not to rely on any single financial measure. The following definitions are provided:

Core Operating Earnings, Core Operating Margin and Core Earnings Per Share

Core operating earnings is defined as GAAP earnings from operations excluding the FAS/CAS service cost adjustment. The FAS/CAS service cost adjustment represents the difference between the FAS pension and postretirement service costs calculated under GAAP and costs allocated to the business segments. Core operating margin is defined as core operating earnings expressed as a percentage of revenue. Core earnings per share is defined as GAAP diluted earnings per share excluding the net earnings per share impact of the FAS/CAS service cost adjustment and Non-operating pension and postretirement expenses. Non-operating pension and postretirement expenses represent the components of net periodic benefit costs other than service cost. Pension costs, comprising service and prior service costs computed in accordance with GAAP are allocated to Commercial Airplanes and BGS businesses supporting commercial customers. Pension costs allocated to BDS and BGS businesses supporting government customers are computed in accordance with U.S. Government Cost Accounting Standards (CAS), which employ different actuarial assumptions and accounting conventions than GAAP. CAS costs are allocable to government contracts. Other postretirement benefit costs are allocated to all business segments based on CAS, which is generally based on benefits paid. Management uses core operating earnings, core operating margin and core earnings per share for purposes of evaluating and forecasting underlying business performance. Management believes these core earnings measures provide investors additional insights into operational performance as they exclude non-service pension and post-retirement costs, which primarily represent costs driven by market factors and costs not allocable to government contracts. A reconciliation between the GAAP and non-GAAP measures is provided on pages 12-13.

Free Cash Flow

Free cash flow is GAAP operating cash flow reduced by capital expenditures for property, plant and equipment. Management believes free cash flow provides investors with an important perspective on the cash available for shareholders, debt repayment, and acquisitions after making the capital investments required to support ongoing business operations and long term value creation. Free cash flow does not represent the residual cash flow available for discretionary expenditures as it excludes certain mandatory expenditures such as repayment of maturing debt. Management uses free cash flow as a measure to assess both business performance and overall liquidity. Table 2 provides a reconciliation of free cash flow to GAAP operating cash flow.

Caution Concerning Forward-Looking Statements

This press release contains “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Words such as “may,” “should,” “expects,” “intends,” “projects,” “plans,” “believes,” “estimates,” “targets,” “anticipates,” and similar expressions generally identify these forward-looking statements. Examples of forward-looking statements include statements relating to our future financial condition and operating results, as well as any other statement that does not directly relate to any historical or current fact. Forward-looking statements are based on expectations and assumptions that we believe to be reasonable when made, but that may not prove to be accurate. These statements are not guarantees and are subject to risks, uncertainties, and changes in circumstances that are difficult to predict. Many factors could cause actual results to differ materially and adversely from these forward-looking statements. Among these factors are risks related to: (1) the COVID-19 pandemic and related government actions, including with respect to our operations, our liquidity, the health of our customers and suppliers, and future demand for our products and services; (2) the 737 MAX, including the timing and conditions of 737 MAX regulatory approvals, lower than planned production rates and/or delivery rates, and increased considerations to customers and suppliers, (3) general conditions in the economy and our industry, including those due to regulatory changes; (4) our reliance on our commercial airline customers; (5) the overall health of our aircraft production system, planned commercial aircraft production rate changes, our commercial development and derivative aircraft programs, and our aircraft being subject to stringent performance and reliability standards; (6) changing budget and appropriation levels and acquisition priorities of the U.S. government; (7) our dependence on U.S. government contracts; (8) our reliance on fixed-price contracts; (9) our reliance on cost-type contracts; (10) uncertainties concerning contracts that include in-orbit incentive payments; (11) our dependence on our subcontractors and suppliers, as well as the availability of raw materials; (12) changes in accounting estimates; (13) changes in the competitive landscape in our markets; (14) our non-U.S. operations, including sales to non-U.S. customers; (15) threats to the security of our or our customers’ information; (16) potential adverse developments in new or pending litigation and/or government investigations; (17) customer and aircraft concentration in our customer financing portfolio; (18) changes in our ability to obtain debt financing on commercially reasonable terms and at competitive rates; (19) realizing the anticipated benefits of mergers, acquisitions, joint ventures/strategic alliances or divestitures; (20) the adequacy of our insurance coverage to cover significant risk exposures; (21) potential business disruptions, including those related to physical security threats, information technology or cyber-attacks, epidemics, sanctions or natural disasters; (22) work stoppages or other labor disruptions; (23) substantial pension and other postretirement benefit obligations; and (24) potential environmental liabilities.

Additional information concerning these and other factors can be found in our filings with the Securities and Exchange Commission, including our most recent Annual Report on Form 10-K, Quarterly Reports on Form 10-Q and Current Reports on Form 8-K. Any forward-looking statement speaks only as of the date on which it is made, and we assume no obligation to update or revise any forward-looking statement, whether as a result of new information, future events, or otherwise, except as required by law.

Boeing, U.S. Navy to Demo Future Ramjet Missile Technology

– The demonstrator will help the Navy determine technical requirements for future carrier-based weapons systems

Boeing [NYSE: BA] and the U.S. Navy will demonstrate advanced missile technologies that will make carrier air wing strike fighters more lethal against threats into the next decade.

Boeing has been awarded a $30 million contract from the Navy to co-develop the Supersonic Propulsion Enabled Advanced Ramjet (SPEAR) flight demonstrator with the Navy’s Air Warfare Center Weapons Division. The contract award comes after the Department of Defense requested information from the defense industry to help the Navy determine technical requirements of future carrier-based land and sea strike weapons systems.

“The SPEAR flight demonstrator will provide the F/A-18 Super Hornet and carrier strike group with significant improvements in range and survivability against advanced threat defensive systems,” said Steve Mercer, Boeing’s SPEAR program manager. “We have a talented team of engineers to meet the challenging technical demands and schedule timeline that the SPEAR program requires. We look forward to working with Navy experts to advance technologies for the Navy’s future capabilities.”

Boeing and the Navy Air Warfare Center Weapons Division plan to fly the SPEAR demonstrator in late 2022. Prior successes by Boeing in developing supersonic and hypersonic technologies include the X-51 Waverider test vehicle in 2010 and the Variable Flow Ducted Rocket propulsion system under the Triple Target Terminator program in 2014.

Boeing is the world’s largest aerospace company and leading provider of commercial airplanes, defense, space and security systems, and global services. As a top U.S. exporter, the company supports commercial and government customers in more than 150 countries. Building on a legacy of aerospace leadership, Boeing continues to lead in technology and innovation, deliver for its customers and invest in its people and future growth.

Embraer Delivers Six A-29 Super Tucano to Philippine Air Force

All six Super Tucano aircraft ordered by The Philippine Air Force (PAF) have been officially handed over to the Air Force today. The aircraft will be deployed for close air support, light attack, surveillance, air-to-air interception, counter-insurgency missions, advanced training and are part of PAF’s ongoing modernization plan.

“The Philippine Air Force takes pride in welcoming the six A-29B Super Tucano from Embraer Defense and Security into the blue fold of our skies as part of our fleet. The addition of these close air support aircraft is a great leap in our air power capability as we soar together in our flight to a more capable and credible Air Force for the nation and its people,” Lieutenant General Allen T. Paredes AFP, Commanding General of the Philippine Air Force.

“It is an honour to deliver these six A-29 Super Tucanos to The Philippine Air Force,” said Jackson Schneider, President and CEO of Embraer Defense & Security. “Delivering an aircraft amidst a global pandemic is challenging, but we were committed to go the extra mile every step of the way to have the aircraft in the hands of PAF to fulfil their security missions.”

These aircraft will be operated and maintained by the 15th Strike Wing, the PAF’s end-user. In November 2017, a firm order of six A-29 Super Tucano light attack and advanced training aircraft for the Philippine Air Force (PAF) was made after a comprehensive public bidding process.

The A-29 Super Tucano is a durable, versatile and powerful turboprop aircraft capable of carrying out a wide range of missions, even operating from unimproved runways. To date, the Super Tucano was selected by 15 air forces worldwide.

Collins Aerospace to Provide Army with Anti-Jam Technology

The highest anti-jamming and anti-spoofing PNT technology providing access and trusted data for success of critical missions

Collins Aerospace Systems, a unit of Raytheon Technologies Corp. (NYSE: RTX), has been selected to provide Mounted Assured Positioning, Navigation and Timing System (MAPS Gen II) for manned and unmanned ground vehicles to combat Positioning, Navigation and Timing (PNT) threats. 

MAPS II provides a high-assurance, accurate navigation solution across GPS threat environments with industry-leading NavFusion of multiple sensors and is interoperable with the Collins Aerospace PRC-162 manpack radio to ensure mission success in the Joint All Domain Command and Control (JADC2) battlespace.

Its advanced anti-spoofing and anti-jamming technology addresses evolving enemy threats and technologies. The warfighter can navigate through high threat environments with the confidence of knowing where they are, where they need to go, at the precise time with weapons on target. 

Leveraging Collins Aerospace’s NavHub™-100 navigation system and Multi-Sensor Antenna System (MSAS-100), this navigation capability distributes Assured Position, Navigation and Timing (APNT) information to all systems onboard the platform through one device. The MAPS Gen II system includes Military Code (M-Code) capability and improved levels of reliability through patented Modernized Signal Tracking (MST) that enhances GPS integrity. Additionally, the open architecture, modular, and scalable technology lets the Army add additional sensors and capability with a much lower life-cycle cost, such as alternative Radio Frequency (RF) and Line of Bearing (LOB).

“Building upon our expertise in open architecture and NavFusion, this modular, and scalable system helps the warfighter keep pace with evolving threats and technologies. They can confidently know their location and destination at the precise time with weapons on target,” said Ryan Bunge, vice president and general manager, Communication, Navigation and Guidance Solutions for Collins Aerospace.

Boeing Announces Third-Quarter Deliveries

The Boeing Company [NYSE: BA] announced today major program deliveries across its commercial and defense operations for the third quarter of 2020.

“We continue to work closely with our customers around the globe, understanding their near-term and longer term fleet needs, aligning supply and demand while navigating the significant impact this global pandemic continues to have on our industry,” said Greg Smith, Boeing executive vice president of Enterprise Operations and chief financial officer. “We’re taking actions to resize, reshape and transform our business to preserve liquidity, adapt to the new market reality and ensure that we deliver the highest standards of safety and quality as we position our company to be more resilient for the long term. Our diverse portfolio, including our government services, defense and space programs, continues to provide some stability as we adapt and rebuild stronger for the other side of the pandemic.”

Major program deliveries during the third quarter were as follows:

Lockheed Martin to Acquire i3 Hypersonics Portfolio

– Acquisition Reinforces Lockheed Martin’s Commitment to Delivering Exceptional Systems to the Warfighter

Lockheed Martin [NYSE: LMT] today announced the signing of a definitive agreement to acquire a portion of Integration Innovation Inc. (i3), a software and systems engineering company based in Huntsville, Alabama. The portfolio alignment between i3 and Lockheed Martin provides the opportunity to design and deliver hypersonic-specific technology solutions that benefit the warfighter.

“Our customers require the most forward-thinking, advanced technology that anticipates and addresses their national security requirements. This business combination not only reinforces our commitment to their missions, but also expands our portfolio in a strategic way,” said Eric Scherff, vice president of Hypersonic Strike Programs at Lockheed Martin. “Combining i3’s talent and domain expertise with our shared vision for hypersonic strike will expand how we think about and deliver this critical capability to the warfighter across domains.”

i3’s hypersonic strike and defense business set offers strategic solutions to U.S. Government and commercial customers. Adding i3’s talent and expertise to the Lockheed Martin portfolio will expand capabilities for customers across several mission areas and national security needs, while also allowing for more integrated solutions.

“We’re proud to be a part of the Lockheed Martin family, as they are a technology authority and employ some of the best and brightest in the industry,” said Mike Wicks, CEO at i3. “We have invested much time and energy into developing strategic solutions at i3. And, we’re finding the need to synergize these offerings with Lockheed Martin is more timely than ever and unlocks the value to our joint customers.”

Subject to the satisfaction of customary closing conditions, the transaction is expected to close in approximately 30 days. Upon closing, i3’s Hypersonics portfolio will be managed by the corporation’s Space business area.

Queensland to Assemble Boeing’s First Australian Designed & Developed Unmanned Aircraft

Queensland is poised to take another bold step in aerospace and advanced manufacturing with an historic opportunity to be the final production home for unmanned defence aircraft – the first military aircraft to be designed, engineered and manufactured in Australia in more than 50 years.

Premier Annastacia Palaszczuk said a visionary new partnership with Boeing Australia means more high-skilled jobs, local supply opportunities and defence industry stimulus as Queensland continues to recover and grow from the COVID downturn.

Our investment in this advanced manufacturing project will provide critical skills for suppliers, academia and Boeing, and culminate in Queensland becoming the primary final assembly facility for the Boeing Airpower Teaming System, conditional on orders.

The first aircraft prototype, called the Loyal Wingman, was unveiled with the Royal Australian Air Force in May this year.

Treasurer Cameron Dick said the Boeing partnership demonstrated the Palaszczuk government’s commitment to advanced manufacturing.

“Manufacturing is a vital part of the Queensland economy, which is why supporting manufacturing is one of the centrepieces of our Unite and Recover Economic Recovery Plan,” the treasurer said.

“Our government’s longstanding commitment to advanced manufacturing is one of the reasons Queensland is already home to Boeing’s largest workforce outside the United States.

“Boeing has 1,700 staff in Queensland and supports 400 Queensland-based suppliers.

Boeing Australia, New Zealand and South Pacific President Brendan Nelson said the partnership with the Queensland government to develop an advanced manufacturing capability was a significant milestone for the company.

“This includes introducing technologies such as advanced robotics; investment in universities, small-to-medium enterprises and start-up companies; as well as creating global export opportunities for Australia’s supply chain.

SpaceX Targets Thursday, October 1 for Falcon 9 Launch

SpaceX is targeting Thursday, October 1 at 9:17 a.m. EDT for a Falcon 9 launch of 60 Starlink satellites from Launch Complex 39A (LC-39A) at Kennedy Space Center in Florida.

Falcon 9’s first stage previously supported launch of Crew Dragon’s first flight to the International Space Station with NASA astronauts onboard and the ANASIS-II mission. Following stage separation, SpaceX will land Falcon 9’s first stage on the “Of Course I Still Love You” droneship, which will be stationed in the Atlantic Ocean. One of Falcon 9’s fairing halves supported two previous Starlink launches.

The Starlink satellites will deploy approximately 1 hour and 1 minute after liftoff.

The First Brazilian Gripen Flies in Brazil

The first Brazilian Gripen E, designated by Brazilian Air Force (FAB) as F-39 Gripen, concluded its first flight in Brazil. The aircraft flew from the airport in Navegantes to Embraer’s facility in Gavião Peixoto. The official presentation of the aircraft is scheduled to take place during the Aviator’s Day and the Brazilian Air Force Day ceremony in Brasilia, celebrated on the 23rd of October.

The President and CEO of Embraer Defense & Security, Jackson Schneider, highlighted the scope of this partnership: “Embraer will play a leading role in the execution of the Gripen programme in Brazil and will be responsible for systems development, integration, flight testing, final assembly, and delivery of the aircraft in support of Brazilian Air Force operations. In terms of technology transfer, the Gripen programme is a great opportunity to increase our knowledge in the development and manufacturing of advanced combat aircraft.”

The Brazilian Minister of Defence, Fernando Azevedo e Silva also highlighted the importance of sharing experiences arising from cooperation between Brazil and Sweden: “Gripen increases the operational capacity of the Brazilian Air Force and promotes a partnership that fosters research and industrial development in both countries,” the Minister of Defence declared.

For the Air Force Commander, Lt. Brig. Antonio Carlos Moretti Bermudez, the arrival of the first F-39 Gripen aircraft is a major milestone for the project: “It is an immense satisfaction for the Brazilian Air Force to see this aircraft flying on national territory. The F-39 Gripen, the new Brazilian Air Force multi-mission aircraft, will be the backbone of Fighter Aviation and it reaffirms the FAB’s commitment to maintaining the country’s sovereignty and to defend the twenty-two million square kilometres under its responsibility”, Lt. Brig. Antonio Carlos Moretti Bermudez points out.

The flight test programme will be expanded to include the Gripen Flight Test Center at Embraer in Gavião Peixoto, which will be fully integrated with the test programme already running at full phase at Saab in Linköping since 2017. Activities in Brazil will include testing of flight control system, environmental control system as well as tests in the aircraft in tropical climate conditions. In addition to the testing that is common for the Gripen E Programme, unique features of the Brazilian aircraft, such as weapons integration as well as the Link BR2 communication system – which provides encrypted data and voice communication between the aircraft – will be tested in Brazil.

The production aircraft will be delivered to the Brazilian Air Force, at Wing 2 in Anápolis (Goiás State), by the end of 2021.

« Older posts Newer posts »