TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: passenger (Page 15 of 26)

Emirates to Resume Flights to Stockholm on 1st of August

Stockholm, Sweden

Emirates will resume passenger services to Stockholm with weekly flights from 1 August, expanding its network in Europe to 22 cities, and connecting customers from Europe to the Middle East, Asia Pacific and Africa.

The restart of Stockholm flights means that all Emirates gateways in Scandinavia will have resumed services by August, with flights to Oslo resuming from 4 August and services to Copenhagen being in operation since June.

This will take the airline’s passenger network to 63 destinations in August, offering customers around the world more convenient connections to Dubai, and via Dubai.

Flights between Stockholm and Dubai will operate once a week on Saturdays. Emirates flight EK157 will depart Dubai at 08:40 and arrives in Stockholm at 13:10. The return flight EK 158 leaves Stockholm Arlanda Airport at 15:05 and arrives into Dubai International Airport at 23:20. All times are local.

The flights will be operated with the Emirates Boeing 777-300ER and can be booked on emirates.com or via travel agents.

Dubai is open: Customers from across Emirates’ network can now to travel to Dubai as the city has re-opened for business and leisure visitors with new air travel protocols that safeguard the health and safety of visitors and communities. For more information on entry requirements for international visitors to Dubai, visit: www.emirates.com/flytoDubai

Flexibility and assurance: With the gradual re-opening of borders over the summer, Emirates has revised its booking policies to offer customers more flexibility and confidence to plan their travel. Customers whose travel plans are disrupted by COVID-19 related flight or travel restrictions, can simply hold on to their ticket which will be valid for 24 months and rebook to fly at a later time; request travel vouchers to offset against future Emirates purchases, or request refunds via an online form on Emirates’ website or via their travel booking agent.

Health and safety first: Emirates has implemented a comprehensive set of measures at every step of the customer journey to ensure the safety of its customers and employees on the ground and in the air, including the distribution of complimentary hygiene kits containing masks, gloves, hand sanitiser and antibacterial wipes to all customers. For more information on these measures and the services available on each flight, visit: www.emirates.com/yoursafety

Travel restrictions: Customers are reminded that travel restrictions remain in place, and travellers will only be accepted on flights if they comply with the eligibility and entry criteria requirements of their destination countries. Visit: www.emirates.com/travelrestrictions 

Dubai residents can check the latest travel requirements at: www.emirates.com/returntoDubai

Alstom to Supply Taipei Integrated Metro Line 7 Extension

The Alstom-led consortium with Taiwanese engineering and contracting services company CTCI reached contractual close on 23 June 2020 for the Phase Two extension of Taipei Metro Line 7. The contract is valued at close to €424 million, with an Alstom share of approximately €248 million. 

Phase One, which was awarded by Systemwide E&M Project Office Department of Rapid Transit Systems of Taipei City Government (SEMPO) in 2018, has been extended to deliver a seamless customer experience on the new metro line, spanning an additional 13.3km with 13 stations as part of Phase Two. When fully completed around late 2028, the 22.8-kilometre medium-capacity metro line, also known as Wanda Zhonghe Shulin Line, will connect Taipei City to New Taipei City more seamlessly. In addition, passengers can look forward to more convenience travelling between the various districts within New Taipei City such as Chong-he, Shu-lin, Tu-chen, Xin-zhuang.  

Under the contract, Alstom will be responsible for the design, supply, manufacturing, testing and commissioning of 16 additional fully automated, four-car Metropolis trains, Urbalis 400 Communication Based Train Control (CBTC) signalling system, Supervisory Control and Data Acquisition (SCADA) system, as well as platform screen doors. The trains will be manufactured in Alstom’s Taubaté factory in Brazil, while the signalling system will be delivered by its Saint-Ouen site in France and Bangalore site in India. Alstom and CTCI will also jointly carry out project management and system integration. CTCI will provide the track work, power supply, depot equipment, Telecommunication and Ticketing systems.  

“Taipei Metro Line 7, which interchanges with five other lines, will be a game changer for the travelling public of Taipei, and Alstom is delighted to continue to be a part of this iconic project. The success of this project extension with SEMPO positions us as a reliable and trusted partner, established for the long term in Taiwan and well beyond our 40 years of active presence,” said Ling Fang, Senior Vice President of Alstom Asia-Pacific.

Alstom’s metros are world-leading, proven, safe and reliable trains that serve many of the world’s great cities, including Amsterdam, Barcelona, London, Paris and Singapore. Alstom has more than 65 years’ experience in the production of metros, having sold over 17,000 metro cars that operate in 55 cities around the world and carry 30 million passengers every day.

In Taiwan, Alstom provides signalling systems to all but one of Taipei’s metro lines and is currently supplying a driverless signalling system for Taichung Green metro line. In 2017, Alstom won its first tramway project in Taiwan, supplying its latest Citadis tram to Kaohsiung tramway line phase two.

Airbus Transforms A330’s into Multi Role Tanker Transports

Having earned its reputation as the new-generation aerial tanker of choice for military services worldwide, Airbus’ A330 Multi Role Tanker Transports (MRTT’s) are now being outfitted for their multi-mission duties in an optimised industrial process – enabling five aircraft to undergo the conversion every year.

The A330 MRTT is based on Airbus’ popular A330 widebody passenger airliner, with the aircraft produced on the company’s commercial airplane final assembly line in Toulouse, France. Once their initial built-up is complete, they are flown to Airbus’ military aircraft facility in Getafe, Spain to be transformed with hardware and systems for their dual roles as an air-to-air refuelling platform and an airlifter for troops and cargo.

Thousands of new parts integrated 

During the conversion, Airbus teams install some 16,000 types of new components and approximately 450 new electrical harnesses (for a total cabling length of more than 50 km.), as well as 6,000 brackets and 1,700 connectors.

With 42 A330 MRTTs delivered to date, Airbus’ has reduced the end-to-end transformation time by one month, introducing increased digitalization and applying the “takt” principle of lean production methodology – in which the aircraft moves through the conversion with zero hours pending and zero work orders open.

The digitalization includes the increasing use of Microsoft HoloLens mixed reality headsets instead of computer tablets. With 80 to 90 work orders now produced with HoloLens, the goal is to apply the system during 2020 for 50% of overall work orders, mainly for electrical and hydraulic installations.

A key element of the conversion is installing the A330 MRTT’s air-to-air refuelling hardware. All aircraft are equipped with hose and drogue units, and most customers have opted for Airbus’ highly capable fly-by-wire Aerial Refuelling Boom System (ARBS) – which provides enhanced controllability during in-flight fuel transfers to receiver airplanes.

The A330 MRTT transformation process includes locating the Airbus-developed Air Refuelling Console in the cockpit area behind the pilots. Containing seats for two crew members, this station enables the aerial refuelling to be remotely controlled, aided by an advanced high-resolution observation system with panoramic 3D-vision for operations day and night.

On the A330 MRTT’s main deck, the aircraft’s widebody cross-section can be configured a variety of roles, from the transportation of troops and personnel with capacities for 268 passengers in a two-class configuration, to aeromedical evacuation – accommodating two intensive care units, 16 stretchers, along with seating for medical staff and passengers.

Customers from around the world 

Airbus delivered its initial A330 MRTT in December 2009, with this no. 1 aircraft received by the Royal Australian Air Force. Today, A330 MRTTs are flown by Australia, France, Singapore, Saudi Arabia, South Korea, the United Emirates and United Kingdom – logging a combined total of more than 200,000 flight hours.

A total of 60 A330 MRTTs have been ordered for operations at the service of 13 nations.

US & China to Allow 4 Weekly Flights Each for Airlines

  • Delta to fly next week
FILE PHOTO: Delta Air Lines passenger planes parked in Birmingham

(Reuters) – The United States and China will each allow four weekly flights between the two countries, the U.S. Transportation Department said on Monday, easing a standoff on travel restrictions in the midst of the novel coronavirus pandemic.

The U.S. government still hopes China will agree to restore full U.S. flight rights under their bilateral aviation agreement, the Transportation Department said Monday in its revised order on China flights.

“As the Chinese government allows more flights by U.S. carriers, we will reciprocate,” it said.

The United States had threatened to bar Chinese passenger flights on June 16 due to Beijing’s curbs on U.S. airlines amid simmering tensions between the world’s two largest economies, and has raised concerns about the number of charter flights Chinese carriers want to fly.

Among U.S. airlines, Delta Air Lines and United Airlines had each sought to restart daily passenger flights to China in June but changed their plans in the absence of government approval.

Following China’s agreement to allow four U.S. flights total, Delta said it would operate two flights to Shanghai from Seattle next week and once weekly flights from Seattle and Detroit beginning in July, all via Seoul.

United said it was aiming to re-launch service to China in the weeks ahead.

Chinese authorities have already agreed to some changes on requirements for U.S. carriers, including allowing temperature checks to be done before flights take off for China, rather than mid-flight as previously discussed, a person briefed on the matter said.

(Reporting by David Shepardson and Tracy Rucinski; Editing by Grant McCool and Stephen Coates)

Amtrak Downeaster Resumes Limited Service June 15

PORTLAND, MAINE – The Northern New England Passenger Rail Authority (NNEPRA) announced yesterday that the Amtrak Downeaster will begin Phase 1 of Service Restoration beginning June 15, 2020.   Service will resume with one round trip on weekdays only between Brunswick, ME and Boston, MA:  southbound Train 680 and northbound Train 685.  Downeaster service has been suspended since April 13, 2020.

A number of protocols and procedures have been implemented to protect the health and safety of passengers and crews. 

Highlights of Phase 1 Service Restoration Plan:

  • Amtrak has implemented new cleaning and disinfecting protocols nationwide, and train equipment used in Downeaster service will undergo enhanced cleaning before and after each trip.
  • Crews and passengers will be required to wear face covering while boarding and moving about the train
  • The number of passengers per train will be limited to no more than 50% of available seating capacity so riders are able to adhere to physical distancing guidelines. 
  • Advance reservations are required and cash sales will not be accepted.
  • Station facilities will not be open; passengers should go directly to the outdoor platform to wait for their train.
  • Café service will not be available, however complimentary water will be available upon request. 
  • Stations are being updated with signage and other enhancements to promote public health and physical distancing.

While NNEPRA expects Downeaster increase service throughout the summer months, no date has been set for subsequent phases.  The NNEPRA Board of Directors plans to meet later this month to evaluate the potential for adding more daily trips.

Pan Am Railways has expedited a series of track improvement and maintenance projects along the Downeaster corridor to take place this spring to avoid construction-related service interruptions later in the year.  The schedule for Train 680 has been modified slightly to adjust for construction-related delays.  Passengers on travelling on Train 685 to stations north of Haverhill should expect delays of approximately 15 minutes.  

Complete information about the steps Amtrak is taking to protect the health and safety of their passengers and crews is available at Amtrak.com

For additional Amtrak Downeaster information visit: AmtrakDowneaster.com

Amtrak Downeaster, Boston, MA, BON, Amtrak Conductor The Downeaster is a 145-mile regional passenger train service, managed by the Northern New England Passenger Rail Authority, and operated by Amtrak.

Agreement Between Alstom & Snam for Development of Hydrogen Trains in Italy

Alstom, a global leader in integrated solutions for sustainable mobility, and Snam, one of the world’s leading energy infrastructure companies, have signed a five-year agreement to develop hydrogen trains in Italy.

The agreement, after the conclusion of the first phase dedicated to feasibility studies planned in Autumn, aims to develop, already at the beginning of 2021, railway mobility projects including both hydrogen-powered trains and the related technological infrastructure, as well as management and maintenance services.

As part of the agreement, Alstom will manufacture and maintain newly built or converted hydrogen trains, while Snam will develop the infrastructures for production, transport and refuelling.

This co-operation stems from the joint commitment of the two companies on hydrogen: Alstom has launched the Coradia iLint, the first fuel cell train in the world, which has successfully been in service for one year and half on a regional route in Germany, while Snam has been one of the first companies in the world to experiment a 10% hydrogen injection into the natural gas transportation network.

U.S. to Revise Chinese Passenger Airline Ban After Beijing Move

A China Eastern Airlines aircraft is seen at Hongqiao International Airport in Shanghai

WASHINGTON (Reuters) – The U.S. Transportation Department plans to issue a revised order in the coming days that is likely to allow some Chinese passenger airline flights to continue, government and airline officials said.

On Thursday, China said it would ease coronavirus restrictions to allow in more foreign carriers, shortly after Washington said it planned to bar Chinese passenger airlines from flying to the United States by June 16 due to Beijing’s curbs on U.S. carriers.

The change should allow U.S. carriers to resume once-a-week flights into a city of their choice starting on June 8, but that would be still significantly fewer than what the U.S. government says its aviation agreement with China allows.

The Transportation Department did not immediately comment.

The department said on Wednesday Chinese carriers could operate “the same number of scheduled passenger flights as the Chinese government allows ours.” It added the order was to “restore a competitive balance and fair and equal opportunity among U.S. and Chinese air carriers.”

The U.S. order would halt the four weekly U.S. roundtrip flights by Air China <0753.HK>, China Eastern Airlines Corp, China Southern Airlines Co <1055.HK> and Xiamen Airlines Co.

U.S. and airline officials have privately raised concerns about the revised Chinese rules and it is unclear if carriers would agree to fly just once a week to China when they have sought approval for two or three daily flights.

Delta Air Lines <DAL.N> and United Airlines <UAL> asked to resume flights to China this month. Both said they were reviewing the order from the Civil Aviation Administration of China.

American Airlines <AAL> is sticking with its previous plan to resume service to China at the end of October, spokesman Ross Feinstein said.

The CAAC said all airlines can increase the number of international flights involving China to two per week if none of their passengers test positive for COVID-19, the disease caused by the novel coronavirus, for three consecutive weeks.

If five or more passengers on one flight test positive upon arrival, the CAAC will bar the airline for a week. Airlines would be suspended for four weeks if 10 passengers or more test positive.

(Reporting by David Shepardson in Washington; additional reporting by Tracy Rucinski in Chicago; Editing by Chris Reese, Richard Chang and Bernadette Baum)

Amtrak Receives $63 Million from FRA for Northeast Corridor Infrastructure Improvements

  • State of Good Repair grant financing will help fund projects in New Jersey and Maryland

The Federal Railroad Administration (FRA) has awarded two Northeast Corridor (NEC) grants to Amtrak as part of its $302.6 million in the State of Good Repair grants to help repair and rehabilitate railroad infrastructure and other assets across the country for 12 projects in nine states. Totaling more than $63 million, the two grants will help fund the Portal North Bridge Project and the Winans to Bridge Improvement project.

“Improving infrastructure in this country is vital to strengthening the economy and providing a safer, more reliable travel experience as we look towards recovery,” said Amtrak President and CEO Bill Flynn. “We thank the FRA, and  our state and NEC partners for their invaluable support in awarding us these grants.”

A total of $55.1 million of the State of Good Repair grant issued by the Federal Railroad Administration was awarded towards the Portal North Bridge Project to replace the century old two-track swing bridge in Kearny, New Jersey with a fixed span. Serving as a critical link for intercity and commuter customers traveling to or from New York City, the current bridge was used by 450 daily trains with passengers making more than 200,000 daily trips on Amtrak’s intercity and New Jersey Transit’s commuter rail services in 2019.

The new bridge is designed as a 2.44-mile modern fixed structure that will eliminate the failures associated with aging infrastructure that causes delays across the NEC. A higher clearance (more than 50 feet above the Hackensack River), will eliminate the need for the bridge to open, allowing for faster operating speeds (from 60 to 90 mph), improved performance and greater reliability for an upgraded customer experience. Early construction of the new bridge began in Fall 2017 and was completed on time and on budget. NJ TRANSIT is seeking a Core Capacity grant from the Federal Transit Administration that would allow major construction to begin as soon as next year.

The Portal North Bridge Project is a key component of the Gateway Program and is identified as a regional priority in the NEC Commission’s five‐year capital plan.

Additionally, as part of a separate project, Amtrak, in partnership with Maryland Department of Transportation, Maryland Transit Administration (MDOT MTA), is also slated to receive $8 million to rehabilitate and upgrade a five‐mile section of track that is part of the Amtrak‐owned NEC mainline near Baltimore.

The project will restore Track A to 90 mph speeds, up from 60 mph, to shorten trip times, improve ride quality, and provide operational flexibility. The work will include upgrades from Winans to Bridge interlockings, replacing timber ties with concrete, installing heavier rail and laying new ballast. Bridge interlocking is located at the north end of West Baltimore Station and Winans is at the south end of Halethorpe Station. These upgrades will enable high‐speed operations on all four tracks on this segment.

The project will also enable service to be maintained while tracks are taken out of service to allow support for construction elements of the B&P Tunnel Replacement project. This work is included in the Northeast Corridor Commission’s five‐year capital plan as a regional priority. To learn more about these and other critical infrastructure projects Amtrak is working on, visit nec.amtrak.com/readytobuild/.

Other grant awards include Amtrak shared joint applications with Connecticut DOT for the WALK Bridge Replacement in Norwalk, Connecticut and Substation 41 Reconstruction in Kearny, NJ as led by NJ TRANSIT as well as other NEC related projects in New York and Pennsylvania. In addition, grants were awarded to various projects in California, Illinois, Michigan and North Carolina that provide benefits to Amtrak and its Long Distance and/or State-Supported customers.

Alstom’s Prima Electric Locomotive Begins Indian Railways Operation

The first of the 12000-horsepower, Prima T8 electric locomotives has been put into commercial service by Indian Railways. Built by Alstom and certified by the Ministry of Railways and Commissioner of Railway Safety/RDSO, the electric locomotives – known locally by the designation WAG-12 – are the most powerful locomotives to run on Indian rails. The 2015 contract will see a total of 800 locomotives built for Indian Railways. 

Set to revolutionise freight logistics in the country, the e-locos will allow faster and safer movement of heavy freight trains, capable of hauling 6000 tonnes at a top speed of 120 km/h. Planned for deployment on Dedicated Freight Corridors (DFCs), they will increase the average speed of freight trains in India by approximately 25 km/h. Equipped with Insulated Gate Bipolar Transistors (IGBT) propulsion technology, the e-locos will also allow considerable savings in energy consumption thanks to the use of regenerative braking. 

“Alstom is very pleased to be delivering these electric locomotives to Indian Railways. The introduction of the Prima locomotives into the IR fleet demonstrates our commitment to the country. This revolutionary product which will be faster, safer and more environmentally friendly, and it will help write a new chapter for India’s sustainable mobility journey. We are immensely proud to be a partner in this,” said Ling Fang, Senior Vice President of Alstom Asia-Pacific.

In line with the Make-in-India mandate, all the 800 Prima locomotives are being manufactured locally. Designed at Alstom’s Engineering Centre in Bengaluru, the Prima T8 WAG-12 are being built in one of India’s largest integrated greenfield manufacturing facilities at Madhepura in Bihar. Spread across 250 acres, with a production capacity of 120 locomotives per year, the Madhepura site is built to international standards of safety and quality. Two ultra-modern maintenance depots in Saharanpur and Nagpur will ensure the high service availability of the locomotives. The Saharanpur depot is already operational and the one in Nagpur is under construction. Equipped with the latest features, these depots will play a critical role in maintaining India’s most advanced freight locomotives at significantly lower costs. 

As part of the largest Foreign Direct Investment (FDI) project of Indian Railways, in 2015 the Ministry of Railways and Alstom signed a contract worth €3.5 billion (INR 25,000 crore) and created a joint venture for the project. The contract allowed for the manufacture of 800 double-section, 12000-horsepower electric locomotives for freight service and associated maintenance for a period of 11 years. The scope also included the set-up of a manufacturing plant at Madhepura (Bihar) for building the e-locos and two maintenance depots at Saharanpur (Uttar Pradesh) and Nagpur (Maharashtra). A true embodiment of India’s vision, the project will create more than 10,000 direct and indirect jobs in the country (primarily in the states of Bihar, Uttar Pradesh and Maharashtra).

« Older posts Newer posts »