TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: 2023 (Page 19 of 19)

Siemens Mobility Receives First Battery Powered Train Order

  • 20 Mireo Plus B battery-powered trains for Baden-Württemberg
  • Maintenance contract for 29.5 years
  • Delivery of trains by June 2023

Landesanstalt Schienenfahrzeuge Baden-Württemberg (SFBW) has ordered 20 Mireo Plus B trains from Siemens Mobility. The two-car electric trainsets with 120 seats can operate on rail routes with or without overhead power lines thanks to their battery hybrid drive, and are scheduled to operate in Network 8 of the Ortenau regional system. The contract also includes maintenance of the trains by Siemens Mobility for a period of just under 30 years. State Minister for Transport Winfried Hermann said: “This marks the first time battery-powered trains will be used in the state. With this innovative technology, the electrification of rail routes without continuous overhead power lines will also be possible.”

Delivery of the trains is scheduled to be completed by December 2023. The trains will be built at the Siemens Mobility factory in Krefeld, Germany. The KfW IPEX Bank is financing the trains for Nahverkehrsgesellschaft Baden-Württemberg (NVBW). The financing of €77 million has a term of 28 years.

“With this order, the state of Baden-Württemberg is investing in the future of mobility. Our battery-powered train Mireo Plus B makes climate-friendly, locally emission-free passenger transport possible, thus offering a sustainable alternative to the use of diesel-powered trains on non-electrified rail routes. We will guarantee the availability of the fleet with our maintenance of the trains over their entire lifecycle,” said Sabrina Soussan, CEO of Siemens Mobility.

“In the interest of sustainability, we’ve deliberately opted for a “lifecycle model’,” said Winfried Hermann, Minister for Transport in Baden-Württemberg. “We’re breaking new ground in converting to climate-friendly propulsion systems in local transport by introducing this new technology and want to commit the company to this technology through contractual arrangements. Siemens is also responsible for energy consumption and energy costs over the entire contract period of 29.5 years. In this respect, we are entering new territory regarding public transport tenders in the state of Baden-Württemberg.”

The Mireo Plus B has a range of around 80 kilometers in battery operation under real conditions. The batteries can be charged via the overhead line while operating along electrified sections and by recuperating the train’s braking energy. The battery system is mounted underfloor and is installed in two battery containers. Lithium-ion batteries with a long service life are used in the system.

The Network 8 Ortenau comprises the routes:

  • Offenburg –Freudenstadt/Hornberg
  • Offenburg – Bad Griesbach
  • Offenburg – Achern
  • Achern – Ottenhöfen and
  • Biberach (Baden) – Oberharmersbach-Riersbach

Bombardier Announces Long-term Agreement with GTAA to Relocate its Global Aircraft Final Assembly

  • Ultra-modern and high-tech manufacturing facility will be located at Toronto Pearson International Airport
  • Slated for completion in 2023, the one-million square-foot facility will be home to the most advanced aircraft manufacturing processes in the world
  • Strengthened commitment to Ontario’s aerospace industry, securing job growth and supporting economic development in the region for years to come

TORONTO, Dec. 04, 2019 (GLOBE NEWSWIRE) — Bombardier is pleased to announce that it has signed a long-term lease agreement with the Greater Toronto Airports Authority (GTAA) to build its new state-of-the art Global Manufacturing Centre located at Toronto Pearson International Airport. With preliminary site work underway in Mississauga and first production activities set to begin in 2023, the cutting-edge facility will optimize final assembly operations for all Global business jets, including the industry flagship Global 7500 business jet.

The Global Manufacturing Centre at Toronto Pearson International Airport, approximately 20 km from the current Global aircraft final assembly site at Downsview, will reinforce Canada’s leading position in the business aviation market.

“Today, I’m very excited to announce the relocation of our Global aircraft family production activities to a new, cutting-edge manufacturing facility at Toronto Pearson. This is a strategic move for Bombardier and a strong commitment to Ontario’s aerospace industry. It will allow us to offer world-class career opportunities and continue fueling the economic development of the region for years to come,” said Alain Bellemare, President and Chief Executive Officer, Bombardier Inc.

The one-million square-foot facility will combine thousands of highly-skilled employees with 21st century production and tooling innovation. Bombardier employs the highest caliber technology throughout the manufacturing process of the Global 7500 business jets, including a state-of-the-art automated positioning system that uses laser-guided measuring to ensure major aircraft structures, such as the wing and fuselage, are joined consistently and perfectly each time. Combining human ingenuity with the most advanced machines, the Global 7500final assembly line in Toronto is a testament to the industry’s most advanced business jet. 

This strengthened commitment to the Greater Toronto Area will also leverage significant recent R&D investments and a continued collaboration with Ontario’s colleges and universities for world class training, research and development.

Bombardier also confirmed it will continue to support the aerospace heritage of the Downsview site with a multi-million-dollar contribution to the Downsview Aerospace Innovation and Research Consortium (DAIR) to develop a visionary aerospace hub for academic research and training activities. The contribution includes $2.5 million CAD in capital funding to refurbish the historic Moth Building, where wartime Mosquito fighter bombers and Tiger Moth trainers were produced.

Vietnam’s VietJet Orders 20 Airbus A321XLR Aircraft

Oct 31 (Reuters) – VietJet Aviation has ordered 20 Airbus long-range A321XLR aircraft that the budget carrier hopes will support its international expansion as Vietnam’s aviation market heats up.

VietJet expects the first aircraft to be delivered in 2023, it said in a statement on Thursday, adding that it will be the “first carrier in the world” to operate the new long-range version of the single-aisle A320neo family jets.

Industry sources said VietJet would be among the first to put the XLR into service.

Vietnam’s largest conglomerate in August applied to launch an airline next year, intensifying competition in one of the fastest-growing aviation markets.

The sector includes Vietnam Airlines, Jetstar Pacific Airlines and Vietnam Air Services Co.

The airline also signed a separate agreement in Toulouse, France, for two A320/A321 aircraft simulators.

VietJet’s order book for Airbus aircraft now totals 186, the airline said.

In September, Reuters reported that Airbus sold 15 A321XLR jets to VietJet.

Airbus on Thursday confirmed that VietJet had placed a new order for 15 XLR and said another 5 would be converted to the new jet from the A321neo model.

VietJet CEO Nguyen Thi Phuong Thao said Thursday’s order will “modernise VietJet’s fleet as we look to strongly grow our international flight network.”

The airline currently flies to destinations including Japan, Hong Kong, Singapore, China and India.

(Reporting by Nikhil Kurian Nainan in Bengaluru; Additional reporting by Tim Hepher; Editing by Jason Neely and Dan Grebler)

Newer posts »