TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: amtrak (Page 2 of 4)

Amtrak Seeking Contractors for New Carrollton Station Project

WASHINGTON – Amtrak is transforming Northeast Corridor train travel by enhancing the customer experience, both in stations and on board trains. As part of this effort, Amtrak is currently accepting Letters of Interest from interested contractors until Feb. 15, 2021, for construction associated work at New Carrollton Station in Maryland. The project involves work within the existing station and the construction of a side platform, and will be closely coordinated with Amtrak for minimal impacts to service.

This infrastructure work is underway in preparation for the introduction of the new Acela fleet scheduled to begin entering service in 2021. The project is necessary to support higher frequency Acela service by expanding the routing options available for high-speed trains in the busy triple-track territory between Washington, D.C. and Baltimore, which is also heavily utilized by commuter trains.

Constructed in 1983 as an intermodal facility, the New Carrollton station serves Amtrak and Maryland Area Regional Commuter (MARC) trains, Washington Metrorail, Metro buses, MTA buses and county transit, as well as many commuting drivers who connect to transit and Amtrak. The New Carrollton Station is served daily by Amtrak’s AcelaNortheast RegionalPalmetto and Vermonter trains. New Carrollton Staton is located on the Northeast Corridor (NEC), one of the busiest, most complex, and economically vital transportation systems in the world connecting eight states and the District of Columbia.

In an effort to make Amtrak the smarter way to travel, we are also upgrading our infrastructure and modernization efforts and improving track capacity and ride quality all along the Northeast Corridor. The New Carrollton Station project also complements other significant station expansion investments at New York Penn Station; the opening of the new Moynihan Train Hall in New York; and further development of stations in Washington, D.C., Baltimore and Philadelphia.

Visit Amtrak.com to learn more about the Future of Rail and infrastructure improvements.

Amtrak Celebrates 20 Years of Acela Travel with $20 Fares

To commemorate 20 years of Acela service throughout the Northeast Corridor (NEC),Amtrak is Acela-celebrating by offering customers the opportunity to travel on its premium product one way in Business class for only $20 from anywhere between Boston and Washington, D.C. The sale is available for purchase from Tuesday, Nov. 10, to Thursday, Nov. 12 and is valid for travel between Nov. 16 through Dec. 17 with blackout dates during Thanksgiving week (Nov. 24, 25, and 28 through 30) and on Fridays and Sundays. Other restrictions may apply and the fare may not be available on all departures.

As part of its partnership with experts from the George Washington University Milken Institute School of Public Health, Amtrak’s new, enhanced safety initiatives and amenities, including the recently introduced Reserved Seating offering, will continue to be in effect for customers and employees on our trains and at our stations.

“Celebrating 20 years of Acela service is an incredible milestone that we are proud to celebrate. We would like to thank our customers and give them a chance to see the changes we’ve made to the experience by offering an exceptionally low fare of only $20,” said Amtrak Executive Vice President and Chief Marketing and Revenue Officer Roger Harris. “For anyone who has been curious about the premium travel experience on our flagship product, this is your chance to ride Acela for a special, low fare that is only available for two days.”

Amtrak and California Recognize Lodi Cop Who Saved Man

The Amtrak Police Department (APD) presented a Lodi, California Police Officer with the prestigious “Life Saving Medal” for her swift and heroic actions that saved a man’s life within seconds of being hit by an oncoming freight train. The Officer, a 14-year veteran of the force, was honored at the Lodi Police Station during an award ceremony on Monday hosted by APD and California Operation Lifesaver, a non-profit railroad safety education organization.

On Aug.12, the Officer spotted a man in a wheelchair stuck on the railroad tracks near Lodi Avenue. As the crossing gates activated and were coming down, she got out of her patrol car and ran to assist. After unsuccessfully attempting to free the wheelchair, with only seconds to spare, she physically pulled the man out of the chair and the two fell backwards just a few feet away from the oncoming 250-ton freight train locomotive. The 66-year-old man is recovering from serious injuries to both of his legs as a result of the incident.   

“This incident had the makings of a double tragedy had it not been for the extraordinary courage and quick actions of the Officer,” said Amtrak Police Chief Sam Dotson. “The citizens of Lodi are very fortunate to have a public servant like this on duty in their community. The ‘Life Saving Medal’ recognizes her bravery in saving a fellow human being without hesitation for her own safety.”   

During the ceremony, Lodi Police Chief Sierra Brucia called his officer a true hero.

Presenting the “Life Saving Medal” was Captain Douglas Calcagno from the Amtrak Police Department’s Western Division. Awards were also presented to the Officer by Steve Walker a California Operation Lifesaver Board member, and Eric Walker and Joe Petito with the Federal Railroad Administration (FRA) in California.    

The ceremony closed out Rail Safety Week 2020, observed in the U.S., Canada and Mexico.

Amtrak-Led Coalition Wins Another Southwest Chief Grant

$11.5 million will stabilize and improve Colorado – New Mexico segment

WASHINGTON – Amtrak, committed to the national network of long-distance, interregional trains, is thanking the Federal Railroad Administration for a $5.6 million Consolidated Rail Infrastructure and Safety Improvements (CRISI) grant to stabilize and rehabilitate the route of the Amtrak Southwest Chief in Colorado and New MexicoCombined with $4.9 million in Amtrak federal funds set aside for this service and $1 million from the New Mexico Department of Transportation (NMDOT), a total of $11.5 million will be invested from Trinidad, Colo., to south of Lamy, N.M.

This is the fifth federal grant for the route segment in these two states and Kansas. There is still a significant need for component renewal and restoration of the line to bring it to a more robust condition. When these improvements and others are complete, it will remain a productive route for decades to come.

Between 2016 and 2020, Amtrak has committed $15.8 million in direct funding for the route of the Southwest Chief, and an additional $12.8 million in matching funds to previously awarded federal grants. Amtrak has also invested between $4 and $8 million annually in this segment, outside of any grant programs, including selective installation of ties, replacing bolted rail in curves, and bridge or culvert repair.

“Starting in 2014, a team of elected and private officials formed a coalition with Amtrak that has been successful as shown by matching funds from the states and Amtrak, the political backing for the train by the region’s Congressional delegation, and the continued support by the cities, counties, and communities alongside the railway,” said Bill Flynn, Amtrak President & Chief Executive Officer. “Our past and current investments, from Kansas through Colorado and New Mexico, demonstrate our commitment to the Chief route and also preserve this segment for eventual inclusion in a north-south connection along the Front Range between Denver and Albuquerque, via Colorado Springs and Pueblo.”

Most of the trackage is owned by Burlington Northern Santa Fe Railway, which has been moving its traffic to less mountainous routes. The arid weather conditions and low freight tonnage since 2008 have allowed the right-of-way to remain in stable condition despite its advancing age. Amtrak, NMDOT and BNSF have identified critical areas where investment in the route infrastructure will improve its condition and enhance safety such that more efficient and productive maintenance dollars can be applied to it annually. Additional federal grant applications are expected to be sought.

Project engineering and construction under this CRISI grant will be carried out by the BNSF Railway Engineering Department and the Rio Metro Regional Transportation District, the latter which manages the NMDOT infrastructure. Work is expected to begin in 2021 and carry into 2022.

New ties will be installed on a 31-mile section south of Raton Pass and another six-mile segment in New Mexico, more than 12 miles of bolted rail will be converted to welded rail between Lamy and where Rio Metro’s Rail Runner commuter traffic diverges to Santa Fe, and the decks of two bridges will be rebuilt, along with three grade crossings.

BNSF commissioned a geotechnical assessment to provide recommendations for the reduction of rockfall hazards at Raton Pass, Glorieta Pass and Shoemaker Canyon. The grant will fund additional stabilization and protection measures. BNSF’s 3.3 percent Raton Pass grade is only used by Amtrak trains and is the steepest rail route in regular U.S. use. It is has been a National Historic Landmark since 1960 and is at an elevation of 7,834 feet.

The Southwest Chief (Trains 3 & 4) operates 2,265 miles between Chicago and Los Angeles, via Kansas City and Albuquerque, and also provides access to the Philmont Scout Ranch (northeast New Mexico’s largest employer), the Grand Canyon and Las Vegas.

Amtrak Prepares for New Diesel Locomotive Fleet

Amtrak today released renderings and other information about the first of the diesel-electric locomotives that will replace the current fleet on the National Network, including all long distance and many state-sponsored routes.

Five of the first six locomotives will have this version of our current Phase VI paint scheme (a “livery” in trade terms) and one will be painted to recognize next year’s 50th anniversary of the inauguration of Amtrak service. A final livery will be unveiled later as part of a fleet-wide plan.

The ALC-42 series was developed by Amtrak with Siemens Mobility and is equipped with the latest safety systems, including Positive Train Control and Crash Energy Management. They have Alternating Current Propulsion for a maximum speed of 125 mph. The 16-cylinder Cummins QSK95 engine has Tier 4 Emissions Technology to reduce nitrogen oxide by more than 89 percent and particulate matter by 95 percent, while providing a savings in diesel fuel consumption and reaching Amtrak Sustainability goals.

The initial order of 75 new locomotives was first announced by Amtrak in December 2018, with deliveries expected through 2024. Amtrak also has a provision to order additional ALC-42 locomotives.

They are similar to the SC-44 locomotives purchased by some state agencies and operated by Amtrak, but have greater fuel capacity for longer routes and increased Head End Power generating capacity for bigger trains. A multitude of other upgrades will also lead to longer maintenance intervals. The front of the ALC-42 locomotive will serve as a “new face of Amtrak” in much of the U.S. and is designed to enhance safety, aesthetics and to simplify repairs.

The new locomotives are designated as ALC-42 for “Amtrak Long-distance Charger, 4,200-horsepower” and are in production in Sacramento, Calif. They will primarily replace Amtrak P40 and P42 diesel-electric locomotives. Although modern when bought in the 90s, the P-series locomotives have been intensively used for more than 25 years, lack up to date technology and do not achieve Tier 4 emissions standards.

Amtrak is purchasing the new locomotives through available funds and fulfills “Buy American” provisions. Siemens Mobility has suppliers across the United States to support locomotive production, including Cummins, which manufactures the diesel engines in Seymour, Indiana.

These new locomotives are part of Amtrak’s long-term planned series of improvements for fleet, infrastructure and stations, including new Acela trainsets now undergoing tests to begin service next year. Improvements are ongoing at New York Penn Station and Moynihan Train Hall, in addition to expanded development of the major stations at Washington, D.C., Baltimore, Philadelphia and Chicago.

Amtrak and Penndot to Restore Daily Keystone Service

  • New safety initiatives will continue to be in effect for customers and employees

In coordination with state partners at the Pennsylvania Department of Transportation, beginning Monday, July 6, Amtrak is partially restoring full-length Keystone Service (New York – Philadelphia – Harrisburg) with one roundtrip between Harrisburg and New York in response to anticipated increased demand. Keystone Service train 640 will operate through to New York and train 653 will originate in New York and operate through to Harrisburg.

Modified Keystone Service includes nine weekday roundtrips and six roundtrips on weekends. Aside from the one additional roundtrip being added to New York, other Keystone Service trains will continue to temporarily operate between Philadelphia and Harrisburg only. Pennsylvanian (Pittsburgh – Philadelphia – New York) service was previously fully restored in June and includes one daily roundtrip operating normally between New York, Philadelphia and Pittsburgh.

Amtrak continues to take extra steps to keep train travel safe, including limiting bookings to less than half of capacity to maintain ample space for physical distancing onboard trains. All trains will be reserved to allow for physical distancing. Ticketing is now available on Amtrak.com, on Amtrak mobile apps or by calling 800-USA-RAIL.

“We are dedicated to doing everything possible to return service safely. We want everyone to feel comfortable as they navigate this new normal,” said Amtrak President and CEO Bill Flynn.

In addition to aggressive steps to disinfect stations and trains, additional Amtrak measures deliver a New Standard of Travel by including the following:

  • Face coverings: As part of Amtrak’s ongoing commitment to protect customers and front-line employees in response to the coronavirus pandemic, Amtrak is requiring that all customers in stations, on trains and Thruway Buses wear face coverings. The Centers for Disease Control and Prevention recommends the use of simple cloth face coverings or masks to slow the spread of the virus and prevent transmission.
  • Limiting bookings: We are limiting bookings on most trains to allow for more physical distancing in seating areas. Individuals traveling alone may use the seat next to them for personal belongings, while friends and family members will easily find seats together.
  • Air quality: All Amtrak trains are equipped with onboard filtration systems with a fresh air exchange rate every 4-5 minutes.
  • Cashless service: As an added measure to ensure the health and safety of our customers and employees, we are temporarily accepting only cashless payments in stations and on trains.
  • Physical distancing: Signage has been displayed at our busiest stations to indicate safe distances in high customer traffic areas such as waiting rooms, ticket offices, base/top of escalators, lounge entrances, etc. In addition, clear protective barriers have been installed at stations where there were no barriers.

Amtrak Downeaster Resumes Limited Service June 15

PORTLAND, MAINE – The Northern New England Passenger Rail Authority (NNEPRA) announced yesterday that the Amtrak Downeaster will begin Phase 1 of Service Restoration beginning June 15, 2020.   Service will resume with one round trip on weekdays only between Brunswick, ME and Boston, MA:  southbound Train 680 and northbound Train 685.  Downeaster service has been suspended since April 13, 2020.

A number of protocols and procedures have been implemented to protect the health and safety of passengers and crews. 

Highlights of Phase 1 Service Restoration Plan:

  • Amtrak has implemented new cleaning and disinfecting protocols nationwide, and train equipment used in Downeaster service will undergo enhanced cleaning before and after each trip.
  • Crews and passengers will be required to wear face covering while boarding and moving about the train
  • The number of passengers per train will be limited to no more than 50% of available seating capacity so riders are able to adhere to physical distancing guidelines. 
  • Advance reservations are required and cash sales will not be accepted.
  • Station facilities will not be open; passengers should go directly to the outdoor platform to wait for their train.
  • Café service will not be available, however complimentary water will be available upon request. 
  • Stations are being updated with signage and other enhancements to promote public health and physical distancing.

While NNEPRA expects Downeaster increase service throughout the summer months, no date has been set for subsequent phases.  The NNEPRA Board of Directors plans to meet later this month to evaluate the potential for adding more daily trips.

Pan Am Railways has expedited a series of track improvement and maintenance projects along the Downeaster corridor to take place this spring to avoid construction-related service interruptions later in the year.  The schedule for Train 680 has been modified slightly to adjust for construction-related delays.  Passengers on travelling on Train 685 to stations north of Haverhill should expect delays of approximately 15 minutes.  

Complete information about the steps Amtrak is taking to protect the health and safety of their passengers and crews is available at Amtrak.com

For additional Amtrak Downeaster information visit: AmtrakDowneaster.com

Amtrak Downeaster, Boston, MA, BON, Amtrak Conductor The Downeaster is a 145-mile regional passenger train service, managed by the Northern New England Passenger Rail Authority, and operated by Amtrak.

Amtrak Receives $63 Million from FRA for Northeast Corridor Infrastructure Improvements

  • State of Good Repair grant financing will help fund projects in New Jersey and Maryland

The Federal Railroad Administration (FRA) has awarded two Northeast Corridor (NEC) grants to Amtrak as part of its $302.6 million in the State of Good Repair grants to help repair and rehabilitate railroad infrastructure and other assets across the country for 12 projects in nine states. Totaling more than $63 million, the two grants will help fund the Portal North Bridge Project and the Winans to Bridge Improvement project.

“Improving infrastructure in this country is vital to strengthening the economy and providing a safer, more reliable travel experience as we look towards recovery,” said Amtrak President and CEO Bill Flynn. “We thank the FRA, and  our state and NEC partners for their invaluable support in awarding us these grants.”

A total of $55.1 million of the State of Good Repair grant issued by the Federal Railroad Administration was awarded towards the Portal North Bridge Project to replace the century old two-track swing bridge in Kearny, New Jersey with a fixed span. Serving as a critical link for intercity and commuter customers traveling to or from New York City, the current bridge was used by 450 daily trains with passengers making more than 200,000 daily trips on Amtrak’s intercity and New Jersey Transit’s commuter rail services in 2019.

The new bridge is designed as a 2.44-mile modern fixed structure that will eliminate the failures associated with aging infrastructure that causes delays across the NEC. A higher clearance (more than 50 feet above the Hackensack River), will eliminate the need for the bridge to open, allowing for faster operating speeds (from 60 to 90 mph), improved performance and greater reliability for an upgraded customer experience. Early construction of the new bridge began in Fall 2017 and was completed on time and on budget. NJ TRANSIT is seeking a Core Capacity grant from the Federal Transit Administration that would allow major construction to begin as soon as next year.

The Portal North Bridge Project is a key component of the Gateway Program and is identified as a regional priority in the NEC Commission’s five‐year capital plan.

Additionally, as part of a separate project, Amtrak, in partnership with Maryland Department of Transportation, Maryland Transit Administration (MDOT MTA), is also slated to receive $8 million to rehabilitate and upgrade a five‐mile section of track that is part of the Amtrak‐owned NEC mainline near Baltimore.

The project will restore Track A to 90 mph speeds, up from 60 mph, to shorten trip times, improve ride quality, and provide operational flexibility. The work will include upgrades from Winans to Bridge interlockings, replacing timber ties with concrete, installing heavier rail and laying new ballast. Bridge interlocking is located at the north end of West Baltimore Station and Winans is at the south end of Halethorpe Station. These upgrades will enable high‐speed operations on all four tracks on this segment.

The project will also enable service to be maintained while tracks are taken out of service to allow support for construction elements of the B&P Tunnel Replacement project. This work is included in the Northeast Corridor Commission’s five‐year capital plan as a regional priority. To learn more about these and other critical infrastructure projects Amtrak is working on, visit nec.amtrak.com/readytobuild/.

Other grant awards include Amtrak shared joint applications with Connecticut DOT for the WALK Bridge Replacement in Norwalk, Connecticut and Substation 41 Reconstruction in Kearny, NJ as led by NJ TRANSIT as well as other NEC related projects in New York and Pennsylvania. In addition, grants were awarded to various projects in California, Illinois, Michigan and North Carolina that provide benefits to Amtrak and its Long Distance and/or State-Supported customers.

« Older posts Newer posts »