TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: locomotives (Page 2 of 2)

Siemens Mobility SignsMoU to Install Egypt’s First High-Speed Rail System

  • Agreement comprises a rail system with a network of around 1000km – first being a 460km project valued around 3bn$
  • Turnkey Engineering, Procurement and Construction project including 15 years of services 
  • Siemens Mobility to provide high-speed and regional trains, locomotives, rail infrastructure, system integration and other services

The National Authority for Tunnels, a governmental authority under the jurisdiction of the Ministry of Transport of Egypt, and Siemens Mobility have signed a Memorandum of Understanding (MoU) – together with the local companies Orascom Construction S.A.E. and The Arab Contractors (Osman Ahmed Osman & Co.) – to design, install and commission Egypt’s first ever high-speed rail transportation system. Additionally, Siemens Mobility will be providing maintenance services. The agreement comprises a rail system with a network of 1000km, with the first being a 460km high-speed line. The order value of this initial high-speed line is around 3bn$.

The MoU was signed by Essam Waly, Chairman of Egypt’s National Authority for Tunnels, and Michael Peter, CEO Siemens Mobility, in a meeting on January 14, 2021 in Cairo. This was witnessed by His excellency, Prime Minister Mostafa Madbouly, His excellency, Minister of Transport Egypt Kamel Al Wazir, as well as Siemens CEO Joe Kaeser and Siemens Deputy CEO Roland Busch.

The first 460 km long high-speed line will connect the vastly developing cities of El-Alamein on the Mediterranean Sea to Ain Sokhna on the Red Sea, while also passing through the New Administrative Capital. The line will also be operable for freight transport purposes which will further foster economic growth in the region.

Siemens Mobility is the global leader in high-speed rail operations and is one of the leading companies in the Egyptian mobility market since the 1960s. The company has also extensive experience in delivering high-speed rail projects in the Middle East and Africa region.

As a leading global rail turnkey project provider with a proven track record of delivering projects on time, Siemens Mobility integrates its portfolio elements and delivers complete rail systems reliably and from one single source. So far, the company has successfully completed around 50 turnkey projects all over the world – delivering many ahead of schedule. Latest projects include the Extension of the Blue Line metro in Bangkok finished last year and the Copenhagen Light Rail project.

For further information about Siemens Mobility, please see: www.siemens.com/mobility

COVID-19 Impacts KiwiRail’s Fiscal Year 2020 Result

The COVID-19 pandemic had a significant impact on KiwiRail’s bottom line for the past financial year, but rigorous operational changes and cost savings measures have helped stabilise the business, KiwiRail chairman Brian Corban says.

KiwiRail Holdings Limited, New Zealand’s national rail provider, which also operates the Interislander ferry service across Cook Strait, today reported an operating surplus of $40 million1in FY20 for the KiwiRail Group, down $15 million compared with FY192.

FY20 was also notable for the additional $1.2 billion of Crown funding allocated in Budget 2020, including $400 million to progress the iReX project to replace the three ageing Interislander ferries with two brand new ones. When they arrive, they will be the first new purpose-built ferries in Interislander’s fleet for 25 years. The Budget 2020 allocation also allows the purchase of new locomotives.

Mr Miller explains that COVID-19 interrupted progress on some significant projects including the rejuvenation of the North Auckland Line where $35.5 million of $164.5 million allocated by the Provincial Growth Fund was spent during the year. More than 400 staff, contractors and sub-contractors are at work building tracks, replacing bridges and making tunnels suitable for wagons carrying hi-cube containers in Northland.

Other highlights during the year included the full return to service of the Main North line through Kaikōura and, in Wellington, work advanced on upgrading the metro network including construction starting on a second 2.7km track between Trentham and Upper Hutt.

1 Operating surplus represents earnings before depreciation & amortisation, interest, impairment, capital grants and fair value changes.

2 FY19 Operating surplus of $55m excludes impact of non-recurring items ($29m Holidays Act remediation).

Alstom Begins Validation Tests on Azerbaijan Freight Locomotives

Alstom has launched the validation test campaign for the Prima T8 AZ8A freight locomotives in Azerbaijan on the main freight transit line, which has recently been converted from 3kV DC to 25kV AC.

In 2014, ADY awarded a contract to EKZ, Alstom’s joint venture with Transmashholding (TMH), for a total 50 electric locomotives, including 40 Prima T8 AZ8A heavy freight locomotives and 10 Prima M4 AZ4A passenger locomotives.

The Prima T8 AZ8A is based on the KZ8A locomotives currently in service in Kazakhstan and ADY’s specific technical requirements and is compliant with GOST[1] standards and specifications.

Alstom’s Prima T8 is one of the most powerful electric locomotives in the world. This model is a 25 tons per axle two-section freight locomotive capable of towing up to 9,000 tons and running at 120 km/h, with installed continuous power of 8.8 Megawatts. The AZ8A is designed to operate in temperatures ranging from -25°C to 50°C. It requires minimum maintenance and provides high reliability levels and low lifecycle costs thanks to its modular design.

Alstom’s Prima range is covering all market segments of locomotives from heavy-haul, freight and passenger operation and shunting or trackwork operation. Over the past 20 years, more than 3,200 Prima locomotives (more than 4,600 sections) have been sold worldwide.

Alstom is present in Western & Central Asia with more than 850 people, three country offices, four depots, repair center and two plants, EKZ in Nur-Sultan for electric locomotives manufacturing and maintenance and production of on-board transformers, and KEP in Almaty to produce point machines. Alstom is a major contributor to the revitalization of country’s mobility industry and the development of its economy.

EKZ, a joint venture between Alstom and TMH[2], employs 700 people and is working on supplying and maintaining the Prima electric locomotives ordered by KTZ, Kazakhstan’s national railway company and export markets, like Azerbaijan.

[1] GOST: Commonwealth of Independent States (CIS) technical certification organisation

[2] EKZ: Alstom 75%, TMH 25%

Kiwi Rail Plans $1.2 Billion Investment to Rebuild New Zealand

The Government’s $1.2 billion rail investment in Budget 2020 will help KiwiRail attract more customers and get more freight on rail, KiwiRail Group Chief Executive Greg Miller says. 

Building on the Government’s $1 billion investment in Budget 2019, this second round of funding includes $400 million towards replacing the aging Interislander ferries and $421 million to continue the replacement programme for some of KiwiRail’s oldest locomotives. 

The funding also includes $246 million, plus a $148 million top up of the National Land Transport Fund, towards ensuring New Zealand’s rail network, which includes more than 3000km of track, more than 1000 bridges and nearly 100 tunnels, is reliable and resilient.

“I welcome this substantial funding, which is another major boost for rail in New Zealand. For our customers this investment sends a clear signal that rail has a big future and gives them the confidence to get on board,” Mr Miller says. 

“Our customers want to make greater use of rail and we’re seeing more road operators reach out for our support as their networks contract. We’re here to help them.”

“The Government’s investment allows us to continue with our locomotive replacement programme and raise the standard of our rail lines, bridges and tunnels across the country. This will enable KiwiRail to offer better and more reliable train services for our customers, and move more of New Zealand’s growing freight task onto rail.

“This funding recognises that rail has a greater role to play in New Zealand’s transport sector, and that it can make a valuable contribution towards lowering our transport emissions, reducing road congestion and saving in road maintenance costs – which benefits our nation as a whole.

Fifteen new Gen 2.3 DL locomotives depart KiwiRail’s Mt Maunganui yard, shortly after arriving at the Port of Tauranga, in 2018.

“The range of track renewal and facility upgrades we are planning will also support our workforce of almost 4000, as well as numerous civil contractors and material supply businesses across the country.”

“I’m very grateful to the Government for this level of support and I know that KiwiRail’s customers will be pleased by this demonstration of our shareholder’s commitment to rail.”

Mr Miller says the $400 million contribution to replacing Interislander’s three aging ferries and necessary landside infrastructure highlights how important the ferry connection is to New Zealand.

“Our Cook Strait ferries are an extension of State Highway 1, moving 800,000 passengers and up to $14 billion worth of road and rail freight between the North and South Islands each year. 

“They are a must have for NZ Inc. The two new rail-enabled ferries will be more advanced, have significantly lower emissions and last for the next 30 years.

“This is a once-in-a generation investment and I am thankful for the Government’s support. It gives us the security to go out to international tender to build the ships, which we hope to see arriving on our shores in 2024 and 2025.”

Coastal Pacific crossing the Kahutara River.

Bombardier Joint Venture Wins Contract to Build 160 New Chinese Standard High-Speed Train Cars

  • With around 4,500 train cars already delivered, Bombardier’s Chinese joint venture is the only Sino-foreign entity to win a new Chinese standard high-speed train bid
  • New Chinese standard high-speed train cars to enhance passenger experience and contribute to the expansion of the world’s longest high-speed rail network

Global mobility solution provider Bombardier Transportation announced today that its Chinese joint venture, Bombardier Sifang (Qingdao) Transportation Ltd. (BST), has been awarded a contract from China State Railway Group Co., Ltd. (CHINA RAILWAY) to supply 160 CR400AF cars, a new Chinese standard high-speed train car for China’s evolving high-speed rail network. The 160 cars will be configured into ten 16-car trainsets with an operating speed of 350 km/h. The total contract is valued at approximately 2.97 billion CNY ($427 million US, 380 million euro). Bombardier Transportation owns 50 per cent of the shares in BST, which is consolidated by Bombardier Transportation’s partner CRRC Sifang Rolling Stock Co., Ltd.

Jianwei Zhang, President, Bombardier Transportation China, said, “We are very proud to have been chosen to supply the new generation of CR400AF cars, a high-speed railway car, through our BST joint venture. China’s high-speed rail industry has become one of the nation’s economic pillar industries and the high-speed network has brought greater mobility and prosperity to the public. Bombardier is proud of its contributions to China’s rail industry and looks forward to delivering more of the high-quality products that are helping China meet its ambitious long-term mobility goals.”

In 2018, BST won two contracts to build a total of 288 CR400AF cars and every car was delivered on-time and on quality. This latest contract is BST’s third and reflects the trust that CHINA RAILWAY has in BST’s efficiency, reliability and competitive edge. All 160 cars will be delivered by mid-2020.

Bombardier Transportation in China is the full solution provider across the entire value chain. From vehicles and propulsion to services and design, Bombardier Transportation in China has seven joint ventures, six wholly foreign-owned enterprises, and more than 8,000 employees. Together, the joint ventures have delivered 4,500 railway passenger cars, 580 electric locomotives and over 2,500 metro cars, Monorail, APM, and trams to China’s growing rail transit markets. It is a major signalling supplier to the Chinese high-speed network and through its joint ventures, propulsion equipment and signalling systems are utilized in a total of 30 Chinese cities.

Alstom Begins Delivery of Prima M4 Locomotives to ONCF

Alstom has delivered in Morocco the first Prima M4 locomotive in the frame of the contract signed in 2018 with ONCF to supply 30 electrical Prima locomotives. While the 30 locomotives will be manufactured in Alstom’s Belfort plant, the Alstom team in Morocco will ensure the testing, the warranty service and maintenance. 

The 30 Prima M4 locomotives have a nominal power of 5.5 MW, a maximum operating speed of 160 km/h and operate under 3 KV DC voltage. They are equipped with ETCS level 1, require minimum maintenance and provide a high reliability level with low lifecycle cost thanks to the modular design.

“Over the past 10 years, 20 Alstom electrical locomotives have been put into commercial service by ONCF. We are proud, today, to contribute to grow up the fleet and to support ONCF in this major project to develop the railway infrastructure solutions throughout the country,” said Nourddine Rhalmi, Managing Director of Alstom Morocco.

Alstom has been manufacturing locomotives for more than 100 years with the first electric locomotive produced in 1926. To date, the company has sold more than 3,000 locomotives from its Prima range. 

Six French sites are participating in the production of the locomotives: Belfort (assembling), Le Creusot (bogies), Ornans (motors), Petit-Quevilly (transformers), Tarbes (traction chain components) and Villeurbanne (on board electronics). The ETCS components are produced in Madrid. 

Present in Morocco with 580 employees, Alstom has contributed to several major railway projects, such as the delivery of first Citadis trams to the cities of Rabat and Casablanca, and 12 Euroduplex VSHT for the High Speed Line which is linking Tangier to Casablanca. In its plant in Fez, Alstom produces cable bundles for rail applications and electrical switchboxes that are supplied to its European plants and mounted on trains exported around the world.

New Amtrak Acela Trains Stimulate Nationwide Economy

  • With parts from nearly 250 suppliers, Alstom trainset production creates 1,300 new jobs

HARVEY, Ill. – The Amtrak partnership with Alstom to produce the next generation of Acela trains to move customers at higher speeds and more comfort between Boston and Washington is also boosting businesses nationwide. Today, Amtrak and Alstom thanked workers at LB Steel in Illinois for building wheel assemblies (known as “bogies” or “trucks”) and other components.

“While these new trains will provide world-class accommodations for customers traveling in the Northeast, this production will benefit communities across the country by creating jobs and stimulating local economies,” said Amtrak Executive Vice President Roger Harris, who led the visit to the factory south of Chicago. “The fastest trains in the hemisphere – at speeds up to 160 mph – will ride on the work done here in Harvey at LB Steel.”

Alstom is using parts manufactured by nearly 250 suppliers in 27 states, with 95 percent of the components produced domestically. More than 1,300 new jobs will be generated in nearly 90 communities across the United States to support production, including the creation of new, sustainable, high-tech, engineering and manufacturing jobs in New York.

“We are proud to have been selected by Amtrak, not only to design and build the new Avelia Liberty high speed trainsets, but also to provide long-term technical support, and supply spare components and parts for the maintenance of the new trains.,” said Michael MacDonald, Site Managing Director for Alstom in Hornell, N.Y., who also participated in the news event south of Chicago. “Alstom is partnering with suppliers across the country for this project, and the emergence of a high-speed rail manufacturing industry here in the U.S. is becoming a reality.”

The trains are being produced at Alstom’s Hornell facility, which is undergoing a massive investment and transformation to build the 28 high-speed trainsets for Amtrak. One of three new structures has been built to accommodate fleet manufacturing and testing and a new bridge has been built to extend the site’s current test track to accommodate higher speeds. 

The new trains are scheduled to enter service in the Northeast Corridor in 2021 and will accommodate nearly 25 percent more customers while continuing the spacious, high-end comfort of the current Acela service that customers enjoy today. Each train will feature modern amenities such as improved Wi-Fi access, personal outlets, USB ports and adjustable reading lights.

The new Acela trains are part of an Amtrak plan to modernize and upgrade our fleet. Last year, Amtrak refreshed the interiors of the current Acela trains and Amfleet I railcars and announced plans to acquire 75 new locomotives for Amtrak’s long distance and state-sponsored services. This year, Amtrak performed similar work on Amfleet II railcars and announced plans to start next year to refresh Superliner cars used on long distance services. Refreshing of Horizon railcars in the Amtrak MidwestSM network is also now underway with state partner support.

New high-speed Acela train sets for the Northeast Corridor when they enter service in 2021. Check out the first prototype (still under construction) being assembled at Alstom’s Hornell, New York facility.

Union Pacific Reports Positive Train Control Progress

Union Pacific 4014 “Big Boy” steam locomotive visits Tucson, Arizona on October 18,2019

Union Pacific implemented Positive Train Control (PTC) on 1,113 route miles in the third quarter of 2019, bringing required PTC-operated route miles to 15,791 or 93 percent, including all required passenger train routes. Nearly all Union Pacific trains operating on PTC-mandated rail lines are operating with PTC locomotives. The company expects to have implemented PTC on all required lines by end of 2019, a year before the Congressional deadline. Its interoperability efforts with other railroads will continue through 2020.

Union Pacific currently hosts 31 freight and passenger railroads, which must achieve PTC interoperability by December 2020. Eleven of these railroads are already compliant, encompassing 85% of Union Pacific’s interoperable PTC train miles. While Union Pacific’s infrastructure is PTC-ready, it is working to be PTC-interoperable with the remaining partner railroads. The company’s expectation is that they will take necessary steps to reach interoperability on our network by mid-2020.

One of the most challenging parts of PTC implementation is ensuring system interoperability among all U.S. rail lines and locomotives. Given the various readiness levels of North American freight and passenger railroads, including publicly funded commuter lines and short lines, it is important that all railroads continue working together to maintain the health, safety, resiliency, and fluidity of the rail network during PTC implementation.

Union Pacific completed PTC installation on required route miles and employee training. PTC education is ongoing as Union Pacific retrains employees and introduces the system to new employees. Training materials are tailored to a variety of employee roles, including engineer, conductor, dispatcher, maintenance of way/engineering, mechanical, signal, telecom and information technologies.

With the FRA’s conditional approval of Union Pacific’s PTC safety plan on April 26, 2017, Union Pacific is running PTC operations on more than 15,000 miles in Arizona, Arkansas, California, Colorado, Idaho, Illinois, Iowa, Kansas, Louisiana, Minnesota, Missouri, Nebraska, Nevada, New Mexico, Oklahoma, Oregon, Tennessee, Texas, Utah, Washington, Wisconsin and Wyoming. Union Pacific and freight and passenger railroads continue working together to safely implement PTC on the remaining 1,271 required route miles.

Newer posts »