TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: Review (Page 2 of 3)

Airbus Warns Staff on Jobs With its ‘Survival at Stake’

FILE PHOTO: Airbus CEO Guillaume Faury poses before Airbus’s annual press conference on full-year results

By Tim Hepher

PARIS (Reuters) – European planemaker Airbus issued a bleak assessment of the impact of the coronavirus crisis, telling the company’s 135,000 employees to brace for potentially deeper job cuts and warning its survival is at stake without immediate action.

In a letter to staff, Chief Executive Guillaume Faury said Airbus was “bleeding cash at an unprecedented speed” and that a recent drop of a third or more in production rates did not reflect the worst-case scenario and would be kept under review.

Airbus said it did not comment on internal communications.

The letter was sent to employees late on Friday, days before the company is due to give first-quarter results overshadowed by a pandemic that has left airlines struggling to survive and virtually halted jet deliveries since mid-March.

Airbus has begun implementing government-assisted furlough schemes starting with 3,000 workers in France, “but we may now need to plan for more far-reaching measures,” Faury said.

“The survival of Airbus is in question if we don’t act now,” he added.

Industry sources have said a new restructuring plan similar to its 2007 Power8 which saw 10,000 job cuts could be launched in the summer, but Faury indicated the company was already exploring “all options” while waiting for clarity on demand.

People familiar with the matter say Airbus is also in active discussions with European governments about tapping schemes to assist struggling industries, including state-guaranteed loans.

It has already expanded commercial credit lines with banks, buying what Faury described as “time to adapt and resize”.

Click the link below to read the full story!

https://finance.yahoo.com/news/airbus-warns-staff-jobs-survival-024101490.html

Air Niugini Delays Delivery of Four 737 MAX Jets Until at Least 2024

A Boeing 737 Max aircraft taxis the runway at the Renton Municipal Airport in Renton

SYDNEY (Reuters) – Papua New Guinea carrier Air Niugini has updated its contract with Boeing Co <BA> to delay the delivery of its four 737 MAX jets on order until at least 2024, the airline’s chief executive said on Tuesday.

The carrier had been due to receive its first 737 MAX this year.

Air Niugini Chief Executive Alan Milne told Reuters the delay would give the airline more time to complete a broader review of its fleet plans, including a replacement for its smaller Fokker jets.

“This will then determine if the MAX is still appropriate for Air Niugini, or whether another Boeing product would better suit as a replacement for the 737/767,” he said, in reference to older models in the airline’s fleet.

Milne said it was possible the 737 MAX orders could be switched to the smaller Embraer SA <ERJ> E2 family if Boeing’s deal to buy the bulk of the Brazilian planemaker’s commercial division closes.

“Air Niugini is a valued Boeing customer and we are working closely with the airline to meet its evolving fleet requirements,” a Boeing spokesman said. “Unfortunately, we do not disclose ongoing customer discussions and have no further comment.”

Some other Boeing customers, including Malaysia Airlines, Virgin Australia Holdings Ltd <VBHLF> and Norwegian Air Shuttle ASA’s <NWARF> leasing arm have also postponed the delivery of 737 MAX jets since the model was grounded globally last March after two fatal crashes.

Boeing confirmed on Monday that it has temporarily halted production of the 737 MAX in Washington State in recent days. The company had said in December it would halt production at some point this month.

(Reporting by Jamie Freed; Editing by Paul Simao and Sam Holmes)

Boeing Addresses New 737 MAX Software Issue

WASHINGTON (Reuters) – Boeing Co <BA> said on Friday it is addressing a new software issue discovered in Iowa last weekend during a technical review of the proposed update to the grounded Boeing 737 MAX, a development that could further delay the plane’s return to service.

“We are making necessary updates,” Boeing said in a statement. Officials at the planemaker said the issue relates to a software power-up monitoring function that verifies some system monitors are operating correctly.

One of the monitors was not being initiated correctly, officials said. The monitor check is prompted by a software command at airplane or system power up, and will set the appropriate indication if maintenance is required, company officials added.

The Federal Aviation Administration (FAA) did not immediately comment. ABC News reported the issue early Friday.

Boeing is halting production of the 737 MAX this month following the grounding in March of its best-selling plane after two fatal crashes in five months killed 346 people.

U.S. regulators are waiting for an update from Boeing on how they will resolve the issue. A U.S. official briefed on the matter said Friday the FAA is now unlikely to approve the plane’s return until March but it could take until April.

This week, American Airlines Group Inc <AAL> and Southwest Airlines Co <LUV> both said they would extend cancellations of MAX flights until early June.

Also this month, the FAA and Boeing said they were reviewing a wiring issue that could potentially cause a short circuit on the grounded 737 MAX. Officials said the review is looking at whether two bundles of wiring are too close together, which could lead to a short circuit and potentially result in a crash if pilots did not respond appropriately.

U.S. and European aviation safety regulators met with Boeing in an effort to complete a 737 MAX software documentation audit that was begun in November. Documentation requirements are central to certification for increasingly complex aircraft software, and can become a source of delays.

(Reporting by David Shepardson; Editing by Chris Reese and David Gregorio)

Former Boeing Employee Who Warned of 737 Problems to Testify

WASHINGTON, Dec 9 (Reuters) – A former Boeing Co employee who warned of problems with 737 production will testify on Wednesday at a U.S. House hearing on the Federal Aviation Administration review of the grounded 737 MAX.

The aircraft has been grounded since March after two fatal crashes in five months killed 346 people. Federal officials say the FAA is not expected to authorize the plane to fly until January at the earliest.

Former Boeing employee Edward Pierson, who had worked as a senior operations manager in the flight test and evaluation unit, will testify before the U.S. House Transportation and Infrastructure Committee, the panel said in a notice.

Pierson’s concerns were referenced at an Oct. 30 hearing — though he had not been named previously.

“All my internal warning bells are going off and for the first time in my life, I’m sorry to say that I’m hesitant about putting my family on a Boeing airplane,” Pierson wrote to Boeing management in mid-2018 before the first crash, according to an email obtained by the committee. He warned “the alternative of rushing to build is far riskier.”

Boeing spokesman Gordon Johndroe said Monday that “although Mr. Pierson did not provide specific information or detail about any particular defect or quality issue, Boeing took his concerns about 737 production disruption seriously.” He added that after Pierson retired and raised the issue again as recently as this year “those concerns received renewed scrutiny at the highest levels of the company.”

Johndroe added “the suggestion by Mr. Pierson of a link between his concerns and the recent MAX accidents is completely unfounded.”

Pierson could not immediately be reached on Monday.

Representative Albio Sires, a Democrat, on Oct. 30, questioned Boeing CEO Dennis Muilenburg about concerns raised by a Boeing employee about Boeing’s 737 production and his recommendation that production be halted. Sires said the employee wrote directly to Muilenburg in December 2018 after he had retired.

Johndroe confirmed Monday Pierson was the employee referenced by Sires.

“He raised some good concerns. We went back and took a look at his concerns and in some cases we identified areas where we thought his issues had already been addressed,” Muilenburg said at the hearing. Boeing did not slow production after Pierson’s concerns.

FAA Administrator Steve Dickson, FAA Aircraft Certification Service Executive Director Earl Lawrence and a member of the FAA’s Technical Advisory Board, Matt Kiefer, as well as former FAA employee G. Michael Collins will also testify.

(Reporting by David Shepardson; Editing by Dan Grebler and Lisa Shumaker)

U.S. Says May Raise Tariffs on EU Products in Aircraft Subsidy Row

WASHINGTON, Dec 2 (Reuters) – The U.S. government on Monday said it would review the possibility of raising tariffs on European Union products and applying tariffs to more products, given what it called lack of progress in resolving a dispute over aircraft subsidies.

The U.S. Trade Representative’s office said Monday’s decision by the World Trade Organization (WTO) affirmed the U.S. position that European Union launch aid to planemaker Airbus continued to harm the U.S. aerospace industry.

“In light of today’s report and the lack of progress in efforts to resolve this dispute, the United States is initiating a process to assess increasing the tariff rates and subjecting additional EU products to the tariffs,” USTR said in a statement. It said it would release more information about the process later this week.

(Reporting by Andrea Shalal; Editing by Lisa Shumaker)

EU hasn’t ended illegal subsidies to Airbus, WTO panel says

Jet Industry’s Grand Masters Fight to a Draw in Dubai

Boeing 787 Dreamliner performs air display during the second day of Dubai Air Show in Dubai

DUBAI (Reuters) – After insisting for 15 years that the superjumbo is the future, Emirates airline has been forced by the demise of the A380 to embrace smaller wide-body jets, resulting in a flurry of maneuvers between planemakers at this week’s Dubai Airshow.

The 555-seat A380 is near the end of production, setting off a series of interlocking deals as top buyer Emirates reviews its fleet against the backdrop of fragmenting travel demand. Delays in the 406-seat Boeing 777X also weighed in the shake-up.

“We have to face the reality of the cancellation of the (A380) program and the effect it has on our network, which is why we conducted a root and branch (review),” Emirates President Tim Clark told reporters at the airshow.

The double-decker A380 superjumbo and the big twin-engined Boeing 777, plus mid-sized 787s and A350s, were all spread out in front of VIP chalets – the queens, bishops and knights in a game of industry chess being played out across the globe.

Big jets tend to be profitable especially when full.

Periodically, the industry designs smaller planes that match both the range and efficiency of larger ones, allowing smaller pieces on the industry chess board to topple larger ones.

While reducing its remaining orders for A380s, Emirates placed an expanded order at the show for 50 Airbus A350s but shelved earlier plans to order the 330-seat A330neo, an upgrade of an earlier model.

It substituted part of an order for delayed 777X jets for 30 Boeing 787-9 Dreamliners – 10 fewer than originally planned in a tentative 2017 order – as part of a $25 billion order shake-up.

For passengers, the roughly 300-seat, lightweight mid-sized jets offer more choice and frequencies.

Many airlines say they can fly almost as profitably as the larger models but with less risk to the bottom line.

The downside? Planes fill more quickly and passengers can flee to other carriers. Airport congestion is also a concern.

Emirates insists the superhub model it pioneered – which takes advantage of Dubai’s location to capture global traffic using large aircraft – remains intact despite the new twist.

But the smaller planes allow some of its rivals to fly profitably with fewer commercial risks and this week’s deals imply Emirates no longer feels immune from such pressure.

“Given the changed environment, Emirates has been forced to adapt the tactics of some of the carriers they have been competing with,” said analyst Richard Aboulafia of Teal Group.

STALEMATE

The shift sparked frantic talks by planemakers to ensure their models were included in the new mix of Emirates’ mid-sized jets. Each suffered losses but the result was broadly a stalemate, analysts said.

Airbus suffered a setback with the loss of the A330neo at Emirates and may have to cut output, they said.

But it ensured its own A350 picked up the slack and won a ticket to any future contests to replace A380s still in service.

Boeing <BA.N> cemented a key win for the 787 after two years of uncertainty over the earlier provisional deal. But recent 777X delays opened the door to Emirates readjusting the blend in favor of the Airbus A350, at the expense of the 787.

Emirates’ decision to expand its A350 order coincided with cancellations for the same jet at Abu Dhabi’s struggling Etihad, prompting speculation of a politically balanced adjustment.

Airline officials strongly denied any link and Clark said planners had identified more room for future growth in revenues with the A350 than the A330neo, which would nonetheless remain “in the mix” for the future alongside more 777X purchases.

Analysts said the net result of reducing A380 and 777X orders and switching to smaller models was about 18,000 fewer seats on order than previously planned before the show,

which some analysts described as a response to overcapacity.

“Manufacturers have sold too many airplanes,” Adam Pilarski, senior vice-president at consultancy AVITAS, said.

While the spotlight fell on the Emirates wide-body order rejig, the Dubai show highlighted Boeing’s efforts to shore up confidence in its grounded 737 MAX with fresh sales and changes sweeping the narrow-body markets. Beefed-up single-aisle jets increasingly cover distances reserved for wide-bodies.

Sharjah’s Air Arabia <AIRA.DU> ordered 120 Airbus including 20 of the long-range 200-240-seat A321XLR. Sources say it may leapfrog northern Africa to fly non-stop as far as Casablanca, a mission currently served from neighboring Dubai by an Emirates A380.

“The single aisles are the pawns of the industry but very effective ones,” Rob Morris, head consultant at UK-based Ascend by Cirium, said.

(By Tim Hepher and Alexander Cornwell; Additional reporting by Ankit Ajmera; Editing by Susan Fenton)

Emiratis walk past an airbus A350 displayed at the Dubai Airshow on November 8, 2015. Dubai Airshow took off today to a slow start amid little expectations of major orders to match the multi-billion-dollar sales generated at the last edition of the biennial fair. AFP PHOTO/MARWAN NAAMANI (Photo by MARWAN NAAMANI / AFP)

Aircraft Lessor Aircastle to be Bought in $2.4 Billion Deal

Nov 6 (Reuters) – Aircastle Ltd said on Wednesday Japan’s Marubeni Corp and Mizuho Leasing Co Ltd had offered to buy the aircraft lessor in a deal valued at $2.4 billion, ending a nearly two-week long strategic review of its business.

Shares of the company rose 16% to trade in line with the offer price of $32 per share. Marubeni, the company’s largest shareholder, has a 29% stake in Aircastle as of Oct. 23 that is currently valued at about $600 million.

Aircastle, which owned and managed 277 aircraft in 48 countries as of Sept. 30, counts American Airlines, Southwest Airlines and United Airlines among its customers.

Airline bankruptcies have increased this year at the fastest ever rate, led by the collapse of India’s Jet Airways, British travel group Thomas Cook and Avianca of Brazil, adding pressure on aircraft leasing companies.

Fitch Ratings said in September that it expects the sector to worsen in the medium term with a potential rise in airline bankruptcies, further aircraft repossessions and increased financing costs. (http://bit.ly/2qrjaG5)

The deal, which is valued at $7.4 billion including debt, is expected to close in the first half of 2020, Aircastle said.

Citigroup Global Markets Inc will serve as financial adviser to Aircastle.

(Reporting by Sanjana Shivdas in Bengaluru; Editing by Shinjini Ganguli and Anil D’Silva)

‘System is not Broken’ After 737 MAX Crashes

FILE PHOTO: A Boeing 737 MAX aircraft is seen grounded at a storage area in an aerial photo at Boeing Field in Seattle

NEW YORK (Reuters) – The U.S. Federal Aviation Administration process for certifying new airplanes is not broken but needs to be improved, the chair of an international panel of air-safety regulators, tasked to review Boeing Co’s <BA> 737 Max, said on Friday.

Speaking on the sidelines of an event at a New York City college, Christopher Hart, chair of the multi-agency panel, said there was no need to question the agency’s overall way of certifying airplanes.

“The U.S. aviation system each day transports millions of people safely, so it’s not like we have to completely overhaul the entire system, it’s not broken. But these incidents have shown us that there are ways to improve the existing system,” Hart said, referring to fatal crashes of a Lion Air 737 MAX in Indonesia and an Ethiopian Airlines 737 MAX five months apart that killed a total of 346 people.

The MAX remains grounded and Boeing has not set when it will conduct a key certification test flight. Some in Congress and in aviation have criticized the FAA’s longstanding practice of delegating certification tasks to manufacturers.

Michael Perrone, who heads the Professional Aviation Safety Specialists union, said at a House hearing in July that external entities designated by the FAA “are now performing more than 90 percent of FAA’s certification activities despite serious concerns that oversight is lacking.”

Hart, former chairman of the National Transportation Safety Board (NTSB) and a licensed pilot, heads the Joint Authorities Technical Review, a panel including air-safety regulators from the United States, Canada, China, Indonesia, European Union and Brazil.

Reuters reported on Sept. 17 the review’s recommendations will include citing regulations that need to be harmonized internationally and where communications can be improved at the FAA and among international regulators, citing a person briefed on the matter.

Hart on Friday said the panel would release its recommendations to the FAA “shortly,” but declined to provide more details on the timeline. He said the panel’s goal was not for all of its members to agree, but to provide a wide range of opinions and recommendations to the FAA.

Hart spoke to students the Vaughn College of Aeronautics and Technology in Queens. Asked by a student whether passengers can be expected to fly again on a 737 MAX, Hart said he predicted people would “sooner or later forget” about the crashes and investigations.

“This will be the safest airplane out there by the time it has to go through all the hoops and hurdles,” he said.

He also was optimistic when asked whether the deadly crashes would spell the end for Boeing’s 737 MAX programme.

“It will be a cold day in hell before Southwest starts moving away from 737s because that’s all they got,” Hart said, referring to Southwest Airlines Co <LUV.N>, which has cancelled flights into January because of the MAX grounding.

A Southwest Airlines spokesman declined to comment directly on Hart’s comments but said the airline has “no plans to veer away from our all-737 fleet.”

(Reporting by Tina Bellon in New York; Additional reporting by David Shepardson; Editing by Daniel Wallis)

Textron Reviewing Strategic Alternatives for Kautex

PROVIDENCE, R.I.–(BUSINESS WIRE)– Textron Inc. (NYSE: TXT) today announced that it is reviewing strategic alternatives for its Kautex business unit, which produces fuel systems and other functional components. Textron plans to consider a range of options, including a sale, tax-free spin-off or other transaction. Kautex operates over 30 plants in 14 countries and generated over $2.3 billion in revenue in 2018.

Kautex, headquartered in Bonn, Germany, is a leading developer and manufacturer of blow-molded plastic fuel systems and advanced fuel systems for cars and light trucks, including pressurized fuel tanks for hybrid applications. The unit also develops and manufactures camera/sensor cleaning solutions for automobiles, selective catalytic reduction systems used to reduce emissions from diesel engines as well as produces cast iron engine camshafts, crankshafts and other engine components.

“Kautex is a leading Tier One supplier to global OEMs. It has a long history of product innovation, world-class operations and strong financial performance,” said Scott C. Donnelly, Textron Chairman and Chief Executive Officer. “We are exploring strategic alternatives to see how we can position Kautex to best serve its customers for ongoing success while simultaneously unlocking potential value for our shareholders.”

No decision has been made and there can be no assurance that the process will result in any transaction being announced or completed in the future. The Company has not set a definitive timetable for completion of its review of strategic alternatives and does not intend to make any further announcements related to its review unless and until its Board of Directors has approved a specific transaction or the Company otherwise determines that further disclosure is appropriate.

Textron has retained Goldman Sachs & Co. LLC as financial advisor to assist in its review.

About Textron Inc.

Textron Inc. is a multi-industry company that leverages its global network of aircraft, defense, industrial and finance businesses to provide customers with innovative solutions and services. Textron is known around the world for its powerful brands such as Bell, Cessna, Beechcraft, Hawker, Jacobsen, Kautex, Lycoming, E-Z-GO, Arctic Cat, Textron Systems, and TRU Simulation + Training. For more information visit: www.textron.com

Boring Gets $49M Las Vegas Convention Center Contract

LAS VEGAS (AP) — A company backed by tech billionaire Elon Musk has been awarded a nearly $49 million contract to build a transit system using self-driving vehicles underneath the Las Vegas Convention Center.

The board of directors of the Las Vegas Convention and Visitors Authority approved the contract Wednesday with The Boring Company, the Musk-backed enterprise based in Hawthorne, California.

People would be transported underground on self-driving electric vehicles from three types of Tesla Model X chassis. The system will be capable of transporting up to 16 people at time through parallel tunnels, each running in a single direction. The twin tunnel system will run less than a mile (1.6 kilometer) long.

The system also will include a pedestrian tunnel and three underground stations accessible from convention center’s halls.

The company plans to immediately pursue permits to start construction in September. It aims to debut the system by December 2020.

“The first thing that’s important is to get it right,” Authority President and CEO Steve Hill told the Las Vegas Review-Journal . “We want to do it as quickly as possible, but we want our customers to be comfortable with it.”

Las Vegas Mayor Carolyn Goodman cast the only vote against the project. At a meeting last week, she cited concerns about hiring a company that has yet to deliver a transit system.

The authority will reimburse the company as it completes certain stages of the project, like completing excavation for the first station and digging the first 100 feet (30.5 meters) of the first tunnel. Full payment is contingent on the company demonstrating that the system can support an average of 4,400 passengers per hour.

Construction will be able to proceed without disruption to traffic or other surface activity, Hill said. The system also could be expanded, which could be part of the solution to the city’s transportation problems, he said.

« Older posts Newer posts »