TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: tests (Page 2 of 2)

Warsaw the 25th European City to Return to Emirates Network

Emirates will resume passenger flights to Warsaw from 4 September starting with twice-a-week services, and increasing to three-a-week from 7 October.

The resumption of flights to Warsaw will expand Emirates’ current network to 75 cities in September, offering travellers in the Middle East, Africa and Asia Pacific convenient connections via Dubai to the Polish capital.

The airline has been gradually restoring its network connectivity, working closely with international and local authorities to responsibly resume passenger operations to meet travel demand, while always prioritising the health and safety of its customers, crew and communities.

On the Dubai-Warsaw route, Emirates will deploy its spacious, wide-body Boeing 777-300ER aircraft offering seats in First, Business and Economy class. Flight EK179 to Warsaw will depart Dubai at 08:10hrs on Fridays and Sundays, and the return flight EK180 will depart Warsaw at 15:00hrs. An additional flight service on Wednesdays, will be added to the route from 7 October.

Customers can book flights on emirates.com or via travel agents.

Customers can stop over or travel to Dubai as the city has re-opened for international business and leisure visitors. Ensuring the safety of travellers, visitors, and the community, COVID-19 PCR tests are mandatory for all inbound and transit passengers arriving to Dubai (and the UAE), including UAE citizens, residents and tourists, irrespective of the country they are coming from.

Emirates to Resume A380 Service to Toronto, Ontario, Canada

  • Emirates has announced it will resume its A380 operations to Toronto starting 16 August, taking its A380 network to six cities.
  • The airline continues to gradually expand the deployment of its double-decker aircraft in line with market demand and operational approvals.

The iconic Emirates A380 will begin serving travellers on flights to Toronto starting 16 August. The airline has so far resumed A380 operations to Amsterdam, Cairo, Paris, London Heathrow and Guangzhou (8 August) – taking its A380 network to six cities. The Emirates A380 experience remains a favourite amongst travellers for its spacious and comfortable cabins and the airline will continue to gradually expand its deployment in line with market demand and operational approvals.

Customers can fly the Emirates A380 from Dubai to Toronto five times a week. Flights can be booked on emirates.com or via travel agents. Emirates flight EK 241 will depart Dubai at 9:10 and arrive in Toronto at 15:05 local time. The return flight, EK 242 will depart Toronto at 21:45 and arrive in Dubai at 18:30 local time, the following day.

With safety as a priority, Emirates is gradually expanding its passenger services to 70 cities in August, returning to over 50% of its pre-pandemic destination network. Passengers travelling between the Americas, Europe, Africa, Middle East, and Asia Pacific can enjoy safe and convenient connections via Dubai. Customers from Emirates’ network can stop over or travel to Dubai as the city has re-opened for international business and leisure visitors. 

COVID-19 PCR tests are mandatory for all inbound and transit passengers arriving to Dubai (and the UAE), including UAE citizens, residents and tourists, irrespective of the country they are coming from. 

Free, global cover for COVID-19 related costs: Customers can now travel with confidence, as Emirates has committed to cover COVID-19 related medical expenses, free of cost, should they be diagnosed with COVID-19 during their travel while they are away from home. This cover is immediately effective for customers flying on Emirates until 31 October 2020 (first flight to be completed on or before 31 October 2020), and is valid for 31 days from the moment they fly the first sector of their journey. This means Emirates customers can continue to benefit from the added assurance of this cover, even if they travel onwards to another city after arriving at their Emirates destination. For more details: http://www.emirates.com/COVID19assistance

Alstom Begins Validation Tests on Azerbaijan Freight Locomotives

Alstom has launched the validation test campaign for the Prima T8 AZ8A freight locomotives in Azerbaijan on the main freight transit line, which has recently been converted from 3kV DC to 25kV AC.

In 2014, ADY awarded a contract to EKZ, Alstom’s joint venture with Transmashholding (TMH), for a total 50 electric locomotives, including 40 Prima T8 AZ8A heavy freight locomotives and 10 Prima M4 AZ4A passenger locomotives.

The Prima T8 AZ8A is based on the KZ8A locomotives currently in service in Kazakhstan and ADY’s specific technical requirements and is compliant with GOST[1] standards and specifications.

Alstom’s Prima T8 is one of the most powerful electric locomotives in the world. This model is a 25 tons per axle two-section freight locomotive capable of towing up to 9,000 tons and running at 120 km/h, with installed continuous power of 8.8 Megawatts. The AZ8A is designed to operate in temperatures ranging from -25°C to 50°C. It requires minimum maintenance and provides high reliability levels and low lifecycle costs thanks to its modular design.

Alstom’s Prima range is covering all market segments of locomotives from heavy-haul, freight and passenger operation and shunting or trackwork operation. Over the past 20 years, more than 3,200 Prima locomotives (more than 4,600 sections) have been sold worldwide.

Alstom is present in Western & Central Asia with more than 850 people, three country offices, four depots, repair center and two plants, EKZ in Nur-Sultan for electric locomotives manufacturing and maintenance and production of on-board transformers, and KEP in Almaty to produce point machines. Alstom is a major contributor to the revitalization of country’s mobility industry and the development of its economy.

EKZ, a joint venture between Alstom and TMH[2], employs 700 people and is working on supplying and maintaining the Prima electric locomotives ordered by KTZ, Kazakhstan’s national railway company and export markets, like Azerbaijan.

[1] GOST: Commonwealth of Independent States (CIS) technical certification organisation

[2] EKZ: Alstom 75%, TMH 25%

Alstom Hydrogen Train Coradia iLint Completes Successful Tests in the Netherlands

The world’s first hydrogen fuel cell passenger train takes its first steps abroad after commercial success in Germany.

  • The Netherlands: second country in Europe to test the hydrogen train 
  • Tests carried out with green hydrogen
  • Performance equivalent to classic DMU regional trains
  • 41 hydrogen trains already on order in Germany

Alstom has performed ten days of tests of the Coradia iLint hydrogen fuel cell train on the 65 kilometres of line between Groningen and Leeuwarden in the north of the Netherlands. The tests follow 18 successful months of passenger service on the Buxtehude–Bremervörde–Bremerhaven–Cuxhaven line in Germany, where total of 41 Coradia iLint have already been ordered. The latest tests make the Netherlands the second country in Europe where the train has proven itself a unique emissions-free solution for non-electrified lines.

Last October, Alstom and the Province of Groningen, local operator Arriva, the Dutch railway infrastructure manager ProRail and the energy company Engie signed a pilot project agreement to test the Coradia iLint, the world’s first passenger train powered by hydrogen fuel cells, in the Netherlands. DEKRA, an independent testing inspection and certification company, has been appointed test leader. This series of tests is being performed at night at up to 140 km/h without passengers. For the purpose of the tests, a mobile filling station has been erected by Engie for refuelling the Coradia iLint with completely green – sustainably produced – hydrogen. 

The tests in the Netherlands demonstrate how our hydrogen train is mature in terms of availability and reliability, providing the same performance as traditional regional trains, but with the benefit of low noise and zero emissions. It is also easy to integrate in an existing fleet and is compliant with all safety regulations. The Coradia iLint hydrogen train is a reliable emission-free train ready to help transport us to a carbon-neutral Europe,” said Bernard Belvaux, Managing Director, Alstom Benelux.  

The Coradia iLint is the world’s first regional passenger train to enter service equipped with fuel cells to convert hydrogen and oxygen into electricity, thus eliminating pollutant emissions related to propulsion. The completely train is quiet, and its only emission is water. Purpose-built for use on non-electrified lines, it provides clean, sustainable traction with no sacrifice in performance. It has a range of approximately 1000 kilometres – the same as equivalent-size diesel multiple units. The train is developed and produced by the Alstom teams in Salzgitter, Germany and Tarbes, France.

The Dutch railway network has approximatively 1,000 kilometres of non-electrified line on which around 100 diesel trains currently operate daily. 

On Saturday 7th of March, the station of Groningen will welcome the press and public to discover the Coradia iLint at the platform between 12:00 to 16:00.

Boeing-Built Satellite to Offer Greater Asia-Pacific Coverage

A Boeing [NYSE: BA]-built satellite called JCSAT-18/Kacific1 will provide affordable internet access and other communications services to underserved parts of Asia and the Pacific islands.

The satellite launched today from Cape Canaveral, Florida at about 7:10 p.m. It will enter service several weeks after on-orbit tests and moving to its final geostationary orbit position over the Asia-Pacific region.

Built on Boeing’s 702 satellite platform, JCSAT-18/Kacific1 has two separate payloads for two customers, SKY Perfect JSAT of Tokyo and Kacific Broadband Satellites Group of Singapore. The satellite will deliver internet services to a potential market comprising hundreds of millions of people in more than 25 countries, including remote islands in the Pacific and the far eastern part of Russia.

“JCSAT-18/Kacific1 is going to make a difference in the lives of millions of people throughout the Asia Pacific region,” said Chris Johnson, president, Boeing Satellite Systems International. “We are proud to support SKY Perfect JSAT and Kacific as they seek to bring positive change through connectivity in regions that have been traditionally underserved.”

JCSAT-18/Kacific1 is the 13th satellite Boeing has built for SKY Perfect JSAT and the first satellite built for Kacific.

Tesla Move will Draw Further Companies into Germany

FRANKFURT (Reuters) – Tesla’s announcement earlier this month that it will build its first European factory near Berlin will draw further companies from the electric mobility and energy storage sectors into Germany, a state premier told newspaper Die Welt.

“They are already on their way. I’m hearing there are further inquiries with the communities and the regional business development programme. Tesla will cause other companies to follow,” said Dietmar Woidke, premier of the eastern German state of Brandenburg that surrounds Berlin.

He said Brandenburg was already in talks with other companies, declining to identify them due to confidentiality agreements. “I expect that we can announce it before Christmas,” Woidke said.

Tesla’s move is a big boost for Germany as a centre for manufacturing after BMW and Daimler in recent years chose to build new factories in Hungary, and after its auto industry was hit hard by Volkswagen’s admission in 2015 that it cheated U.S. diesel emissions tests.

(Reporting by Christoph Steitz; Editing by Mark Heinrich)

Brandenburg’s PM Woidke speaks speaks to the media on Tesla European factory in Potsdam

FAA to Invite Global Boeing 737 MAX Pilots for Simulator Tests

CHICAGO/WASHINGTON, Aug 22 (Reuters) – The U.S. Federal Aviation Administration said on Thursday it would invite Boeing 737 MAX pilots from across the world to participate in simulator tests as part of the process to recertify the aircraft for flight following two fatal crashes.

Earlier, Reuters reported that the agency had asked the three U.S. airlines that operate the MAX to provide the names of some pilots who had only flown the 737 for around a year, including at least one MAX flight.

In a statement, the FAA said it had not specified the number of required hours of flight experience, but said the candidates would be a cross-section of line pilots and must have experience at the controls of the MAX.

Boeing Co’s latest 737 narrow-body model, the MAX, was grounded worldwide in March after two crashes within five months in Indonesia and Ethiopia that killed 346 people.

Boeing has been reprogramming software for a stall-prevention system at the center of both crashes, which the FAA must approve before the plane flies again commercially.

The FAA said it had not yet specified a firm schedule for the tests.

Boeing has said it is working toward getting the 737 MAX flying again commercially in the early fourth quarter. Reuters reported on Thursday that it had told suppliers it planned to ramp 737 production back up in February, sending its shares 4% higher.

The world’s largest planemaker slowed its 737 production rate in April because deliveries of the MAX, which makes up the bulk of its single-aisle production, were frozen under the grounding, hitting its supply chain and airline customers.

In the United States, MAX operators Southwest Airlines Co , American Airlines and United Airlines have had to cancel hundreds of daily flights as they wrestle with slimmer fleets at a time of strong domestic air travel demand.

The MAX is Boeing’s fastest-selling aircraft, with about 5,000 pending orders.

As part of its own testing process, Boeing has invited senior airline pilots to experiment with the software fix and use simulators to run scenarios similar to the ones that led to the two crashes.

But sources told Reuters that the FAA also wanted to observe newer 737 pilots. One source said the simulator tests were supposed to be conducted during the first week of September but had been pushed back to the middle of the month.

The FAA, which is working alongside global regulators, has said repeatedly it does not have a fixed time line to approve the grounded jets to fly commercially again.

(Reporting by Tracy Rucinski in Chicago and David Shepardson in Washington; Additional reporting by Eric M. Johnson in Seattle; Editing by Matthew Lewis and Peter Cooney)

Newer posts »