TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: contract (Page 4 of 20)

Textron Aviation receives order for five Beechcraft King Air turboprops in support of Kingdom of Saudi Arabia

Wichita, Kansas (July, 11, 2023) – Textron Aviation (NYSE: TXT) today announced it has been awarded a contract by AvMet International LLC (AvMet), based in Fargo, North Dakota, for one Beechcraft King Air 360CHW (cargo door, heavy weight) and four Beechcraft King Air 260 aircraft. The Beechcraft King Air fleet will support the Kingdom of Saudi Arabia’s National Center for Meteorology program for cloud seeding.

AvMet and its partners Weather Modification International (WMI) and Fargo Jet Center (FJC) will work collaboratively to equip the four King Air 260 aircraft with a Cloud Water Inertial Probe (CWIP), Data Logger with aircraft tracking, and cloud seeding equipment. The King Air 360CHW will be rigged with Cloud Seeding equipment, a research laboratory and an instrument package for studying cloud physics and aerosols.

The aircraft will be modified at WMI’s headquarters in Fargo with sister company Fargo Jet Center LLC (FJC).  FJC’s Part 145 Repair Station, which is an authorized service facility for the family of Beechcraft King Air aircraft, teamed with WMI to certify the Federal Aviation Administration approved Supplemental Type Certificate modifications for cloud seeding and atmospheric research equipment. Together, Textron Aviation, WMI and FJC will provide the Kingdom of Saudi Arabia’s National Center for Meteorology with the newest technologies in cloud seeding and atmospheric sciences instrumentation.

Endless Special Mission Possibilities

When government, military and commercial customers want airborne solutions for critical missions, they turn to Textron Aviation. The company’s aviation solutions provide the high performance and flight characteristics required to address the unique challenges of special mission operations. With unparalleled quality, versatility and low operating costs, Textron Aviation products are preferred for air ambulance, ISR, utility transport, aerial survey, flight inspection, training and a number of other special operations.

National Jet Express Takes Off From New Brisbane Base

National Jet Express (NJE), a Rex Group company, has today firmed up its bold ambition to expand its footprint in the Queensland charter and mining market. NJE today took passengers to the skies for the first time in Queensland, with flight NC344 departing Brisbane at 0700 local time for Moranbah. This comes after NJE was successful in winning a contract to provide air services for BHP Mitsubishi Alliance (BMA).

httpswww.rex_.com_.auViewerpage1

httpswww.rex_.com_.auViewerpage2

BAE Systems wins Multi-million pound contract to equip Royal Air Force Typhoons with latest advanced radar capabilities

The Ministry of Defence (MOD) has awarded BAE Systems (OTC: BAESY) a £870m contract to deliver a new radar to enhance the Royal Air Force’s (RAF) Typhoon fighter jet fleet and strengthen the aircraft’s control of the airspace whilst providing cutting-edge electronic warfare capabilities.

The contract, awarded by the Ministry of Defence to BAE Systems, will see further development of technology and integration work on the European Common Radar System (ECRS) Mk2 radar by BAE Systems and Leonardo UK. The work is expected to lead to initial flight testing in 2024.

BAE Systems leads the overall design, development, manufacture and upgrade of the Typhoon aircraft for the UK and Leonardo is the lead for the aircraft’s main sensing and survivability systems including its radar and defensive aids sub-system.

The contract is part of the UK Government announcement made in July 2022, to invest £2.35 billion in the continued technology advancements in Typhoon capabilities, as recognition of its long-term role supporting national security and defence priorities.

Typhoon is a highly capable and extremely agile multi-role combat aircraft. It is capable of being deployed for the full spectrum of air operations, including air policing, peace support and high-intensity conflict. The RAF Typhoons are deployed alongside F-35B Lightning II to provide frontline capability for the UK.

The Typhoon programme supports more than 20,000 jobs across all regions of the UK every year, contributing £1.4 billion to the economy annually. The ECRS Mk2 radar programme sustains more than 600 highly-skilled jobs across the country, including more than 300 at Leonardo’s site in Edinburgh, more than 100 electronic warfare specialists at the company’s site in Luton, and 120 advanced engineers at BAE Systems’ site in Lancashire.

Court Rules in Favor of SBB for 286 Regional Service Units

In October of 2021, Stadler was awarded the contract for 286 single-deck multiple units. The Federal Administrative Court confirms the award of the contract to Stadler, and has dismissed Alstom’s appeal.

Together with its subsidiaries Thurbo and RegionAlps, SBB is procuring 286 single-deck multiple-unit trains for regional transport. Stadler was awarded the contract for this order. The unsuccessful bidder, Alstom, appealed against this decision to the Federal Administrative Court. The court has now dismissed the appeal. This court decision confirms that SBB complied with the requirements of procurement law and the equal treatment of bidders during the tendering procedure. After signing the contract, Stadler can start building the 286 multiple units for regional transport. 

The legal proceedings initiated by Alstom have an impact on the delivery of the vehicles. The first trains will now not enter service until 2026 instead of December 2025 as originally planned. The new trains will gradually replace the following rolling stock until 2034:

  • at SBB: Domino, Flirt (first generation)
  • at Thurbo: articulated railcars
  • at RegionAlps: Domino and Nina

The newly procured vehicles will help all three railway companies to implement their planned improvements to services as well as the service expansion projects planned by the Confederation and the Cantons.

Serbian Air Force and Air Defense Become New C295 Operator

Getafe, Spain, February 23, 2022 – The Serbian Ministry of Defence has ordered two Airbus (OTC: EADSY) C295s and therefore the Serbian Air Force and Air Defense joins the family of C295 becoming the 36th operator worldwide.

The contract was signed in Madrid in the presence of senior government members of the Republic of Serbia and Spain. This contract will be accompanied by a Government-to-Government supervision agreement between the Ministries of Defence of Spain and the Republic of Serbia, which aims to study the development of future defence programmes between both nations. Airbus is committed to maintain and foster its close collaboration with the Republic of Serbia, which already operates Airbus military solutions. 

The two aircraft, in transport configuration, will be equipped with the modern avionics suite Collins Aerospace Pro Line Fusion and will contribute to enhance the air transport capabilities of the Republic of Serbia.  

Deliveries are expected to commence in late 2023.

With this order 33 countries have already relied on the Airbus C295. With a total of 281 orders worldwide and more than half a million flight hours in operation, this aircraft is the undisputed leader in its segment.

Alstom China Joint Venture Wins Maintenance Contract for Shanghai Metro Line 12

February 18, 2022 – Alstom (OTC: ALSMY) Chinese joint venture, Shentong Bombardier (Shanghai) Rail Transit Vehicle Maintenance Co., Ltd., has been awarded a contract from Shanghai Shentong Metro Group Co., Ltd. (Shanghai Metro) to provide whole lifecycle maintenance service for 204 Movia metro cars (34 trains) on Shanghai’s Line 12 phase 2 and phase 3 project. The total contract is valued at approximately €43.6 million (330 million CNY excl. VAT).  

Under the contract, SHBRT will adopt the condition-based maintenance regime by deploying the advanced maintenance tools, including Alstom’s Orbita advanced train monitoring system, Automatic Vehicle Inspection System, etc., to improve the safety, reliability, availability and efficiency of Shanghai’s Line 12 fleet. The scope of the contract includes preventive maintenance, corrective maintenance, balanced overhauls, safety inspections, train cleaning and train escort services for 204 metro cars. The project is expected to be completed in November 2027.

American Airlines to Expand Embraer Fleet

São José dos Campos, Brazil, February 15, 2022 – American Airlines has signed a firm order with Embraer (NYSE: ERJ) for three new E175s. The aircraft will be operated by American’s wholly owned subsidiary, Envoy Air. With deliveries to be completed this year, Envoy’s fleet of E175s will grow to over 100 aircraft by the end of 2022. The contract value is USD 160.2 million at current list prices and will be included in Embraer’s 2021 fourth quarter backlog.

“Reaching the century mark of 100 E175s with American Airlines and Envoy is truly a moment to savor. We thank American Airlines and Envoy for their sustained partnership with Embraer, which began back in 1998,” said Mark Neely, Vice President Sales and Marketing for The Americas, Embraer Commercial Aviation. “It’s hard to exaggerate the impact this hardworking aircraft has every day, delivering essential connectivity across the US market. The E175 is the backbone of the US regional network, with over 600 aircraft sold, and 86% market share since 2013.”

“Our incredible journey with Embraer began almost 25 years ago with the ERJ 145. Our partnership continues to grow today with the E175s, the core of our fleet. Not only are our customers happy with the aircraft, but the jet’s outstanding performance has allowed us to continue to provide excellent service to American Airlines,” said Pedro Fábregas, President & CEO of Envoy. “We look forward to receiving these three new aircraft later this year as we continue to expand our growing network.”

Air Force Awards Boeing 5-year Contract for Continued Aircraft Guidance and Navigation Repair

HEATH, Ohio, Feb. 8, 2021 — Boeing (NYSE: BA) will continue to provide the U.S. Air Force with guidance and navigation repair work on a variety of aircraft under a 5-year, $91 million sole-source contract.

The company has serviced components for aircraft including the B-2 Spirit, B-52 Stratofortress, E-3 Sentry and F-15 Eagle at the Boeing Guidance Repair Center in Heath, Ohio, since 1996.

The Boeing Guidance Repair Center is responsible for maintaining the readiness and modernization of guidance and navigation systems for U.S. nuclear-capable platforms, as well as non-nuclear capable guidance and control systems, electronics and radio frequency systems, and platform processors. In addition, the center is home to assembly, integration and test activities for several Boeing production programs, including the KC-46 tanker, T-7A Red Hawk and the MQ-25 unmanned aircraft system.

Stadler to Deliver up to 504 Tram Trains to German Austrian Project Consortium

Stadler has been awarded the largest contract in the company’s history with a total volume of up to four billion euros: it has won an international tender held jointly by six transport companies from Germany and Austria for up to 504 vehicles as part of the VDV Tram-Train project. In addition to vehicle production, the framework agreement also includes a maintenance contract lasting up to 32 years. Part of the framework agreement is a fixed order quantity of 246 CITYLINK vehicles representing a volume of around 1.7 billion euros. There is also an option to order up to 258 more vehicles.

The award of the contract marks the beginning of a long-standing partnership between Stadler and the project consortium, consisting of Verkehrsbetriebe Karlsruhe (VBK), Albtal-Verkehrs-Gesellschaft (AVG), Saarbahn Netz, Schiene Oberösterreich, the State of Salzburg and Zweckverband Regional-Stadtbahn Neckar-Alb. Over the next ten years, Stadler will produce 246 CITYLINK vehicles for the six operators. The first four vehicles will be delivered to the Saarbahn in 2024.

All vehicles will be supplied in a three-part design. The length of the vehicles, the number of doors, the boarding and coupling height as well as the configuration of the CITYLINK versions will vary depending on the delivery location and the customer. All the vehicles will have certain features in common: they will be fitted with an HVAC system for the passenger compartments and driver’s cab, and have spacious multi-purpose areas with two wheelchair spaces that can be flexibly configured. The tram-trains will be individually equipped to suit the place of use. For example, the vehicles for the Albtal-Verkehrs-Gesellschaft will have a toilet as well as facilities for cycle racks, while Schiene Oberösterreich has opted for luggage racks as an extra feature.

Providing one type of vehicle for six operators is unusual. “On the project team, we spent hours developing a common set of specifications. We defined a standard with up to five further versions to meet the operator- specific requirements such as boarding height, coating and place of use,” explains the overall project manager Thorsten Erlenkötter from Verkehrsbetriebe Karlsruhe.

U.S. Department of Defense Exercises Options for 36 TH-73A Helicopters

Leonardo welcomed the announcement by the U.S. Department of Defense to award AgustaWestland Philadelphia Corp. a $159.4 million USD firm-fixed price modification to the previously awarded contract for the U.S. Navy’s Advanced Helicopter Training System. This modification exercises options for the production and delivery of 36 TH-73A helicopters Lot III and initial spares.

In January 2020 Leonardo, through AgustaWestland Philadelphia Corp., was awarded a firm-fixed-price contract valued at $176 million for the production and delivery of an initial 32 TH-73A helicopters, along with spares, support, dedicated equipment, and specific pilot and maintenance training services.

In November 2020, the second lot of aircraft were ordered through a $171 million contract modification, an additional 36. The lot III brings the total number of aircraft on order to 104. The total requirement is for 130 aircraft. The TH-73A will be used to train the next generation of student aviators from the U.S. Navy, Marine Corps and Coast Guard and is only made at Leonardo’s FAA-certified Part 21 Production Line in Philadelphia, PA.

Click the link below to watch the video!

https://leonardo.canto.global/s/KA76E?viewIndex=0&column=video&id=9r87ussssd53td82qke7v2t90d

« Older posts Newer posts »