TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: mobility (Page 7 of 10)

Inauguration of Dubai Route 2020 Metro

Alstom-led consortium delivers extension of Dubai Metro Red Line

  • A full turnkey integrated system
  • 15km-long
  • 50 Metropolis trainsets
  • Total value of the project is €2.6 billion

Alstom congratulates Dubai’s Roads and Transport Authority (RTA), on the inauguration of the Dubai Route 2020 Metro. This iconic project was ceremonially inaugurated by H. H. Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the United Arab Emirates, and Ruler of the Emirate of Dubai on 7 July 2020, and was also attended by Henri Poupart-Lafarge, Alstom’s CEO and Chairman of the Board as well as the top management of the ExpoLink Consortium via video conference technology.  

The new line project, commenced in July 2016 and carried out by the Alstom-led ExpoLink consortium, also composed of ACCIONA and Gülermak, consists of a 15km-long line, of which 11.8km is above ground and 3.2km underground, and an interchange on the Red Line. The extension of the metro has seven stations including Jabel Ali Station and the flagship metro station at the Expo exhibition site. The project is worth a total of €2.6 billion. 

As part of the Consortium, Alstom was responsible for the integration of the entire metro system including 50 Metropolis trainsets produced in Alstom’s site in Katowice, Poland, power supply, communication, signalling, automatic ticket control, track works, platform screen doors and a three-year warranty on the whole system, as well as the enhancement of the existing metro line by upgrading power supply, signalling systems, miscellaneous communication and track works. The trainsets are 85.5 meters long and composed of five cars per trainset, and they will be able to carry up to 696 passengers each.

The train offers an excellent level of passenger experience, thanks to wide gangways, large doors and windows, three specific areas for Silver, Family and Gold Classes. Eco-friendly, the train is equipped with a full electrical braking system, LED lighting and other innovations to reduce energy consumption.

Alstom is a dedicated and long-standing partner of Dubai’s transportation and mobility development. Alstom delivered the Dubai tramway, the first fully integrated tramway system in the Middle East and the world’s first 100% catenary-free line, which was opened in November 2014. Alstom is also in charge of the maintenance of the Dubai Tram for a period of 13 years.

The Gardens Station on Dubai Metro Route 2020

Agreement Between Alstom & Snam for Development of Hydrogen Trains in Italy

Alstom, a global leader in integrated solutions for sustainable mobility, and Snam, one of the world’s leading energy infrastructure companies, have signed a five-year agreement to develop hydrogen trains in Italy.

The agreement, after the conclusion of the first phase dedicated to feasibility studies planned in Autumn, aims to develop, already at the beginning of 2021, railway mobility projects including both hydrogen-powered trains and the related technological infrastructure, as well as management and maintenance services.

As part of the agreement, Alstom will manufacture and maintain newly built or converted hydrogen trains, while Snam will develop the infrastructures for production, transport and refuelling.

This co-operation stems from the joint commitment of the two companies on hydrogen: Alstom has launched the Coradia iLint, the first fuel cell train in the world, which has successfully been in service for one year and half on a regional route in Germany, while Snam has been one of the first companies in the world to experiment a 10% hydrogen injection into the natural gas transportation network.

New Zealand to Buy Five New Super Hercules Aircraft

WELLINGTON, June 5 (Reuters) – New Zealand said on Friday that it will purchase five C-130J-30 Super Hercules transport aircraft from Lockheed Martin to replace its existing fleet.

“Along with the new fleet, the $1.521 billion project will deliver a full mission flight simulator and other supporting infrastructure,” Defence Minister Ron Mark said in a statement.

The first of the new Hercules will be delivered in 2024, with the full fleet operating from 2025, he said.

New Zealand will also start work in 2021 on upgrading its air mobility capability, when options will be considered for replacing the two Boeing 757 aircraft operated by the Royal New Zealand Air Force.

(Reporting by Praveen Menon Editing by Shri Navaratnam)

Boeing Terminates Joint Venture Agreement With Embraer

Boeing (NYSE: BA) announced today that it has terminated its Master Transaction Agreement (MTA) with Embraer, under which the two companies sought to establish a new level of strategic partnership. The parties had planned to create a joint venture comprising Embraer’s commercial aviation business and a second joint venture to develop new markets for the C-390 Millennium medium airlift and air mobility aircraft.

Under the MTA, April 24, 2020, was the initial termination date, subject to extension by either party if certain conditions were met. Boeing exercised its rights to terminate after Embraer did not satisfy the necessary conditions.

“Boeing has worked diligently over more than two years to finalize its transaction with Embraer. Over the past several months, we had productive but ultimately unsuccessful negotiations about unsatisfied MTA conditions. We all aimed to resolve those by the initial termination date, but it didn’t happen,” said Marc Allen, president of Embraer Partnership & Group Operations. “It is deeply disappointing. But we have reached a point where continued negotiation within the framework of the MTA is not going to resolve the outstanding issues.” 

The planned partnership between Boeing and Embraer had received unconditional approval from all necessary regulatory authorities, with the exception of the European Commission. 

Boeing and Embraer will maintain their existing Master Teaming Agreement, originally signed in 2012 and expanded in 2016, to jointly market and support the C-390 Millennium military aircraft.

Siemens Mobility Receives First Battery Powered Train Order

  • 20 Mireo Plus B battery-powered trains for Baden-Württemberg
  • Maintenance contract for 29.5 years
  • Delivery of trains by June 2023

Landesanstalt Schienenfahrzeuge Baden-Württemberg (SFBW) has ordered 20 Mireo Plus B trains from Siemens Mobility. The two-car electric trainsets with 120 seats can operate on rail routes with or without overhead power lines thanks to their battery hybrid drive, and are scheduled to operate in Network 8 of the Ortenau regional system. The contract also includes maintenance of the trains by Siemens Mobility for a period of just under 30 years. State Minister for Transport Winfried Hermann said: “This marks the first time battery-powered trains will be used in the state. With this innovative technology, the electrification of rail routes without continuous overhead power lines will also be possible.”

Delivery of the trains is scheduled to be completed by December 2023. The trains will be built at the Siemens Mobility factory in Krefeld, Germany. The KfW IPEX Bank is financing the trains for Nahverkehrsgesellschaft Baden-Württemberg (NVBW). The financing of €77 million has a term of 28 years.

“With this order, the state of Baden-Württemberg is investing in the future of mobility. Our battery-powered train Mireo Plus B makes climate-friendly, locally emission-free passenger transport possible, thus offering a sustainable alternative to the use of diesel-powered trains on non-electrified rail routes. We will guarantee the availability of the fleet with our maintenance of the trains over their entire lifecycle,” said Sabrina Soussan, CEO of Siemens Mobility.

“In the interest of sustainability, we’ve deliberately opted for a “lifecycle model’,” said Winfried Hermann, Minister for Transport in Baden-Württemberg. “We’re breaking new ground in converting to climate-friendly propulsion systems in local transport by introducing this new technology and want to commit the company to this technology through contractual arrangements. Siemens is also responsible for energy consumption and energy costs over the entire contract period of 29.5 years. In this respect, we are entering new territory regarding public transport tenders in the state of Baden-Württemberg.”

The Mireo Plus B has a range of around 80 kilometers in battery operation under real conditions. The batteries can be charged via the overhead line while operating along electrified sections and by recuperating the train’s braking energy. The battery system is mounted underfloor and is installed in two battery containers. Lithium-ion batteries with a long service life are used in the system.

The Network 8 Ortenau comprises the routes:

  • Offenburg –Freudenstadt/Hornberg
  • Offenburg – Bad Griesbach
  • Offenburg – Achern
  • Achern – Ottenhöfen and
  • Biberach (Baden) – Oberharmersbach-Riersbach

Alstom to Supply 17 Additional Citadis Trams to Strasbourg

Alstom will supply 17 additional Citadis trams to the Strasbourg Transport Company (CTS) and the Eurometropole of Strasbourg for the sum of €52 million. This order will complete the fleet of 63 trams delivered by Alstom between 2003 and 2019, and confirms a partnership of almost 20 years between Alstom and CTS. The last option exercise, signed in March 2016, was for 10 Citadis trams for the extensions of lines A and D. 

These 17 new trams will reinforce the existing lines, including line D, which serves the city centre of Kehl in Germany. The Citadis tramway is the first to cross a border in France and is approved according to the BOStrab, the German federal decree on the construction and operation of trams in Germany.

“With this new order, CTS is the French customer that will own one of the largest Citadis tram fleets with a total of 80 trainsets ordered. We are very proud to be continuing this partnership initiated in 2003, proving that the Citadis range meets the evolving needs of our customers,” says Jean-Baptiste Eyméoud, Managing Director of Alstom in France. 

The Citadis trams for Strasbourg are 45 metres long and have a capacity of 288 passengers. They are fitted with LED lighting and all-glass doors to enhance comfort and safety for passengers. Complying with the latest standards, the trams are equipped with double doors accessible to PRMs (People with Reduced Mobility), wider seats and areas reserved for wheelchair and stroller users. 

These trams will be designed and manufactured mainly in France: La Rochelle (design and assembly of the trainsets), Le Creusot (bogies for the intermediate modules), Tarbes (components of the traction chain), Villeurbanne (electronic equipment) and Saint-Ouen (design). The bogies situated under the driver cabins will be manufactured at Alstom’s site in Salzgitter, Germany. 

In total, more than 2,600 Citadis trams have been sold to more than 50 cities in 20 countries.

Embraer Delivers 198 Total Jets in 2019

Embraer (ERJ) delivered a total of 198 jets in 2019, of which 89 were commercial aircraft and 109 were executive jets (62 light and 47 large), which represents an increase of 9% compared to 2018, when the Company delivered a total of 181 jets. The deliveries were within the outlook ranges for 2019 of 85 to 95 for the commercial aviation market and of 90 to 110 for the business aviation market. In the fourth quarter of 2019, Embraer delivered 81 jets, being 35 commercial aircraft and 46 executive jets (20 light and 26 large). As of December 31, the firm order backlog totaled USD 16.8 billion. See details below:

Deliveries by Segment4Q192019
Commercial Aviation3589
EMBRAER 175 (E175)2267
EMBRAER 190 (E190)25
EMBRAER 195 (E195)13
EMBRAER 190-E2 (E190-E2)47
EMBRAER 195-E2 (E195-E2)67
Executive Aviation46109
Phenom 100411
Phenom 3001651
Light Jets2062
Legacy 65035
Legacy 4501015
Legacy 500511
Praetor 50033
Praetor 600513
Large Jets2647
TOTAL81198

In the fourth quarter of 2019, Embraer delivered the first Praetor 500 business jet to Flexjet, a global leader in private jet travel, just over one year after its announcement at the 2018 National Business Aviation Association’s Business Aviation Convention and Exhibition (NBAA-BACE).

Embraer also announced the expansion of its Executive Jets Service Center at Fort Lauderdale-Hollywood International Airport (KFLL), expanding its service capacity through a lease agreement with Jetscape Services for a dedicated hangar. Embraer’s presence in Florida is strategic for its Executive Jets customers throughout the Southern United States, the Caribbean and Central America as well as for those whose travel frequently brings them through South Florida.

In the same period, Embraer delivered the second KC-390 Millennium to the Brazilian Air Force and the contract with the Portuguese Government for a firm order for five KC-390 airlifters was included in Embraer’s backlog in the fourth quarter of 2019.

At the Dubai Air Show, Embraer announced the name and designation of its multi-mission medium aircraft, the Embraer C-390 Millennium. The new designation reflects increased flexibility and value for operators that look for a transport/cargo aircraft to perform airlift and air mobility missions, among others. In addition, Embraer and Boeing announced that the joint venture to promote and develop new markets for the C-390 Millennium multi-mission airlift and air mobility aircraft will be called Boeing Embraer – Defense. The organization will only be operational after the companies’ joint venture receives regulatory approvals and meets closing conditions.

Also during the event in Dubai, Embraer announced two contracts for commercial aircraft: a contract with Air Peace for three additional E195-E2s, confirming purchase rights from the original contract and a firm order for three E190 jets with CIAF Leasing.

Embraer welcomed three new E2 operators. Helvetic Airways, from Switzerland, and Air Kiribati, national airline of the Republic of Kiribati, received its first E190-E2 jets, while Binter, of Spain, received its first E195-E2. Embraer also signed firm orders with SkyWest, for 20 E175 that will be operated by American Airlines, and with Congo Airways for two E175 aircraft, with purchase rights for a further two.

Acquisition of Bombardier Transportation: Accelerating Alstom’s Strategic Roadmap

  • A step-change acquisition to address the ever-increasing demand for sustainable mobility
  • Excellent strategic rationale bringing to Alstom:
    – Strong commercial and product complementarities
    – Strengthened product lines and strategic industrial capacity
    – Leading portfolio offering and R&D capabilities
  • Acquisition price from €5.8bn to €6.2bn
  • CDPQ to become the largest shareholder of Alstom with c.18% of the capital

Alstom announces today that it has signed a Memorandum of Understanding with Bombardier Inc. and Caisse de dépôt et placement du Québec (“CDPQ”) in view of the acquisition of Bombardier Transportation. Post-transaction, Alstom will have a backlog of around €75bn and revenues around €15.5bn. The price for the acquisition of 100% of Bombardier Transportation shares will be €5.8bn to €6.2bn which will be paid via a mix of cash and new Alstom shares. CDPQ will reinvest c.€2bn corresponding to 100% of cash proceeds to be received from the sale of its stake in Bombardier Transportation and further invest €0.7bn in Alstom, outlining its strong belief in the strategic rationale and value creation potential of the combination. 

“I’m very proud to announce the acquisition of Bombardier Transportation, which is a unique opportunity to strengthen our global position on the booming mobility market. This acquisition will improve our global reach and our ability to respond to the ever-increasing need for sustainable mobility. Bombardier Transportation will bring to Alstom complementary geographical presence and industrial footprint in growing markets, as well as additional technological platforms. It will significantly increase our innovation capabilities to lead smart and green innovation. We will be thrilled to welcome all the talent and energy of Bombardier Transportation employees. We are deeply committed to step up the turnaround of Bombardier Transportation activities and deliver significant value to all stakeholders, particularly our customers. We will also further develop Bombardier Transportation’s historical presence in Québec, drawing on Québec’s well-established strengths in innovation and sustainable mobility. We are pleased to welcome CDPQ as a new long-term shareholder. CDPQ is fully supportive of the transaction and Alstom’s strategy.” said Henri Poupart-Lafarge, Chairman and CEO of Alstom.

A step-change acquisition

Alstom and Bombardier operate in a very positive market environment with passenger traffic expected to grow between 3% to 5% annually over the 2015-2025 period and global rail OEM market expected to achieve a +3.0% CAGR between 2021-2023. The dynamic is driven by urbanisation trend and a strong push for decarbonation of mobility. In Europe, the European Commission has set very ambitious targets in terms of CO2 reduction and several countries have announced large investments in rail. 

Alstom is a preeminent rail equipment player with an industry-record backlog of €40bn and €8.1bn of annual sales as of 31-Mar-2019. Over the period 2016-2019, Alstom delivered strong sales development with an average annual growth of 5.5% outperforming the market, and significantly improved profitability (up to 7.5% adjusted EBIT margin).

Bombardier Transportation is a reference player in global rail transportation with a €32bn backlog and €7.4bn sales as of December 2019. With a track record of market leadership and a strong expertise, Bombardier Transportation offers a broad product portfolio across all market segments and has a well-balanced industrial footprint between best-cost and high-tech countries.

Click the link for the full press release! https://www.alstom.com/press-releases-news/2020/2/acquisition-bombardier-transportation-accelerating-alstoms-strategic

Alstom Signs First Contract for Battery-Electric Regional Trains in Germany

Alstom will manufacture, deliver and maintain until 2032 eleven Coradia Continental battery-electric trains for regional traffic on the Leipzig-Chemnitz route on behalf of VMS (Verkehrsverbund Mittelsachsen) and with the support of ZVNL (Zweckverband für den Nahverkehrsraum Leipzig), the two authorities responsible for this line. The contract is worth approximately €100 million. Following this order, Alstom offers all types of traction systems on the market as well as the full range of emission-free drives, from efficient electric motors to hydrogen fuel cells and advanced battery traction. 

In 2014, Alstom had previously signed a contract with VMS for the delivery of 29 Coradia Continental electric regional trains (EMU). In order to bridge the 80 kilometres of non-electrified line between the cities of Chemnitz and Leipzig, the authority requested a battery-electric version (BEMU). The new trains will enter service in 2023. They will be built at Alstom’s German site of Salzgitter, in Lower Saxony. The battery traction sub-system is designed and supplied by Alstom’s traction centre of excellence in Tarbes.

“We are immensely proud to be providing the responsible authorities with a sustainable and perfectly-suited solution. Today, Alstom stands apart in being able to offer any form of emission-free traction currently on the market built into a proven solution. As a responsible company, Alstom has an intense focus on sustainable mobility, offering the best-fitting solutions that make it not only possible, but also cost-effective and attractive,” says Gian Luca Erbacci, Senior Vice President of Alstom Europe. 

The Coradia Continental BEMU trains will be similar to those already in service on the Dresden, Riesa and Zwickau routes. The main difference: they will also have high-performance batteries on the roof. The train, based on the proven Coradia Continental, builds on Alstom’s long experience in battery traction, gained with the Coradia iLint, Citadis trams and the Prima H3 locomotive. 

The Coradia Continental BEMU has a range of up to 120 kilometres and can be operated under catenary as well as on non-electrified sections. The three-car-trains will be 56 metres long and equipped with 150 seats. They will have a top speed of 160 km/h in battery mode. The capacity of the batteries (high-power lithium-ion) is calculated to ensure catenary-free operation of the line Chemnitz-Leipzig without any sacrifice in performance or comfort. 

Alstom’s Coradia range allows operators and transport authorities to offer their passengers regional trains that meet their needs and expectations, while demonstrating exemplary reliability and cost-effectiveness. Alstom has tailored the Coradia range to operate with all available emission-free power systems, from electric to battery-electric and hydrogen fuel cells. The latter, the Coradia iLint, powered by fuel cells and offering performance comparable to a diesel train while emitting nothing but water, has been in passenger service in Germany for over a year.

Amtrak Downeaster Achieves Record Ridership In 2019

PORTLAND, MAINE – The Northern New England Passenger Rail Authority (NNEPRA) announced today that the Amtrak Downeaster achieved record breaking ridership of 574,404 passengers in calendar year 2019, a 7.8% increase from 2018. The previous ridership record of 546,056 passengers was set in 2017.

The Amtrak Downeaster experienced record ridership growth in 9 out of 12 months, according to NNEPRA Marketing Director, Natalie Bogart, who reported that August 2019 was the highest ridership month in Downeaster history. “August ridership of 60,944 was an all-time record and the first time that Downeaster ridership surpassed 60,000 passengers in a month.”  

NNEPRA attributes the ridership surge to increased frequency to Freeport and Brunswick, improved reliability, as well as repeat riders. Amtrak Customer Satisfaction score of 91% suggests that people are not only riding the Downeaster, but are finding it to be enjoyable as well. When compared to Amtrak services throughout the country, passengers rank the Downeaster among the top services for friendliness, overall satisfaction, and quality of on-board food service. 

“These results are particularly impressive,” stated NNEPRA Chairman, John Melrose. “We are committed to the continued growth of the Downeaster service and are working hard in 2020 to improve/ expand transportation alternatives to further enhance mobility to our citizens and support economic growth for Maine Businesses.”

For additional Amtrak Downeaster information or to purchase tickets visit: AmtrakDowneaster.com

Amtrak Downeaster, POR, 2016, 15th Anniversary of the Downeaster, Portland Intermodal Station, Chuck Gomez WASHINGTON, WAS
« Older posts Newer posts »