TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: Adirondack

Amtrak Airo Trainsets Ordered to Meet Surging Demand

Washington, D.C. – Amtrak executed a contract option to order 10 additional Amtrak Airo trainsets as demand for passenger rail travel exceeds expectations. This brings the total contract order to 83 trainsets. The first Amtrak Airo trainset is scheduled to debut in 2026 and these new trains will operate on routes throughout the country. The Amtrak Airo trainsets are being manufactured in California by Siemens (OTC: SIEGY) A.G. of Germany.

Currently in production, the new trains will elevate the customer journey. Features include:

  • 💺 Spacious, Comfortable Seats: Loaded with features and improvements:
    • Dedicated power, USB-C ports, seatback tablet and phone holders, bigger and sturdier tray tables and adjustable cup holders.
    • Contoured seat cushions, enhanced leg room, individual arm rests and adjustable headrests – all with a focus on ergonomics.
  • 🗺 Trip and Train Navigation: Bolder, color-coded signage to identify amenities and differentiate classes of service, both on board and on the platform.
  • 🌍 Greener Impact:
    • More fuel efficient, producing 90% less particulate emissions in diesel operations.
    • Dedicated water stations on each trainset, providing chilled and filtered hydration, while reducing the need for disposable plastic bottles.
  • 🤳 Modern Tech: New 5G Wi-Fi and digital information systems.
  • ♿ Enhanced Accessibility:
    • Spacious and accessible restrooms, vestibules and Café cars with integrated boarding equipment for customers with reduced mobility.
    • Inductive hearing technology to assist with onboard announcements.
  • 🍽 Café Car: Contemporary food service allows for a grab-and-go experience.
  • 🚽 Restrooms: Touchless with spacious, accessible interiors.
  • 💻 Business Class: Increased space between customers, offering double and single seats, wider arm rests, additional outlets, footrests and improved ambiance.
  • 💡 Lighting: Enhanced lighting provides a softer yet functional interior with individual reading lights at each seat.
  • 🧳 Luggage: Access to ample storage space for baggage.

Click the link below to watch the video!

Amtrak’s Infrastructure Renewal at New York Penn Station

NEW YORK – Amtrak will continue its Infrastructure Renewal program at New York Penn Station this summer by performing state of good repair work on JO railroad interlocking which directs Amtrak, Long Island Rail Road and NJ TRANSIT trains heading east and west from the East River Tunnels.

“Amtrak has made record levels of capital investment to improve the reliability of our infrastructure and overall customer experience, and we continue to do so in New York Penn Station for all the users of this important station,” said Amtrak President & CEO Richard Anderson. “We appreciate the continued support and confidence from our commuter partners and patience from our customers as we continue to deliver this important work safely, on time and within budget, improving the commutes for the many users of Penn Station.”

The total cost of the projects is estimated at $30 million, which will keep this important infrastructure in a state of good repair and benefit all users of Penn Station with an upgraded, state-of-the art railroad and more reliable service. The work on JO Interlocking will occur between Friday, June 28, and Monday, Sept. 2, including the renewal of critical infrastructure such as switches and turnouts at North America’s busiest train station.

Amtrak schedule adjustments will include:

• Northeast Regional Train 110 from Washington, D.C. to New York Penn Station will be cancelled.
• Northeast Regional Train 127 from New York Penn Station to Washington, D.C. will be cancelled.
• Northbound Keystone Train 640 will terminate at Newark Penn Station (NWK).
• Southbound Keystone Train 643 will originate at NWK.
• Southbound Keystone Train 653 will departe NYP early.
• Cardinal Train 51 will depart NYP early on weekdays only.
• Maple Leaf Train 63 and Adirondack Train 69 will be combined on the regular time slot for 63 and will split at Albany, N.Y. (ALB).

Customers booked on trains with a modified schedule will be contacted and accommodated on other scheduled services.Additional information and updates will be posted on Amtrak.com and Amtrak.com/NYPrenewal. To be notified of service disruptions on the Northeast Corridor (including Acela Express, Northeast Regional and other corridor services), follow @AmtrakNECAlerts on Twitter.

While Amtrak has maintained and repaired this aging infrastructure, some of which dates back to the 1970’s, full replacement is now required. During the summer of 2017, Amtrak kicked off its Infrastructure Renewal at New York Penn Station, and continued it in early 2018 and during the Summer of 2018. The Infrastructure Renewal program is one element of Amtrak’s overall plan to modernize stations, infrastructure and equipment on the Northeast Corridor.