TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: Bucharest

Alstom signs contract to supply 16 electric locomotives in Romania

January 29, 2024 – Alstom, global leader in smart and sustainable mobility, and the Romanian Railway Reform Authority (ARF) have signed a contract for the delivery of 16 Traxx 3 MS electric locomotives and 20 years of associated maintenance services. The contract, totalling around €150 million, extends Alstom’s collaboration with ARF within the rolling stock sector. The 20-year maintenance and repair period can be extended by a further 20 years by concluding an additional agreement.

The Traxx locomotives offer a flexible design based on a robust, modular platform approach compatible with many applications (single or multi-country freight and passenger transport) and available in various configurations (AC, DC and multi-system). This product delivers increased operational performance and reliability with higher energy efficiency and extended maintenance intervals to improve its availability.

Alstom has been active in Romania for almost 30 years and is a market leader in railway electrification and signalling solutions. The company is responsible for implementing signalling or electrification solutions on the Rhine-Danube railway corridor as well as in the Cluj area, where the company is also part of the consortium building the second metro system in the country, in the city of Cluj Napoca. The first CBTC urban signalling solution in the country is under implementation by Alstom on Bucharest’s metro Line 5. The company has also been the provider of maintenance services for the Bucharest metro fleet for nearly 20  years, with an ongoing contract valid until 2036.

Copy Translate
Copy Translate

Alstom to Provide Digital Train Control, Traffic Management and Electrification Infrastructure for the Rhine-Danube Rail Corridor

Alstom project value: 70 million EUR

Travel time reduced to one hour on Sighisoara-Brasov section thanks to modernised infrastructure

Alstom working on 75% of the 450 km currently in rehabilitation on the Romanian section of the European rail corridor

Alstom will provide digital train control, traffic management and electrification infrastructure as part of the rehabilitation and modernisation of Lot 2 (Apata-Cata) on the Sighisoara-Brasov section of the European Rhine-Danube rail corridor in Romania. Alstom’s share of the contract amounts to approximately €70 million. The Asocierea RailWorks consortium, of which Alstom is part, has signed the contract, with the project execution expected to last four years.  

This project completes the previous one for Lots 1 and 3 of the same section, which was awarded to Asocierea RailWorks in March 2020. In total, Alstom will provide signalling and electrification works on the double line covering the railway distance of 128 kilometres – totalling more than 250 kilometres of modernized railway infrastructure – between Sighisoara and Brasov, two important touristic destinations in Romania. 

The new project, totalling 28 kilometres of double railway line, includes the optimisation of the existing route by building tunnels to reduce travel time, as well as the modernisation of most of the old line, for passenger trains operating at up to 160 km/h. Alstom is directly responsible for the traffic management system, digital interlocking and ERTMS Level 2 deployment (ETCS Level 2 + GSM-R telecommunications system), passenger information systems as well as catenary upgrades and electric traction substations. 

The most complex part in this project is the construction of two double tunnels (four tunnels in total, two per each direction) totalling almost 13 kilometres of double lines. In these tunnels, Alstom is responsible for an electro-ventilation system to compensate the lack of natural ventilation, along with a fire-proof system to ensure full traffic safety.

As with Lots 1 and 3 of the Sighisoara-Brasov section, for the upgrade of the catenary systems, Alstom will supply its OCS3 catenary solution for main lines. 

Trains have been running between Brașov and Sighișoara since 1873. After completed rehabilitation, the train journey should take under one hour for the fastest trains, compared to 160 to 250 minutes at present. 

Alstom has been active in ongoing rehabilitation works on the Romanian part of the Rhine-Danube Corridor since 2012 and now has five ongoing and two completed signalling and infrastructure projects on this section, covering over 75% of the distance of the 450 km currently in rehabilitation on the Romanian section of the European corridor. 

The pan-European Rhine-Danube Corridor links the cities of Nuremberg-Prague-Vienna-Budapest-Curtici-Simeria-Brasov-Bucharest-Constanta. Through the rehabilitation programmes currently in implementation on the sections located on the Northern branch of the Romanian part of this Corridor, the traffic speed will increase to 160 km/h for passenger trains and to 120 km/h for freight trains. 

Alstom is a global pioneer in the development and implementation of on-board digital train control equipment. ATLAS 200 is the Alstom’s ERTMS level 2 solution allowing trains to increase speed in perfectly safe conditions.

Emirates and Flydubai Reactivate Partnership for Seamless Travel

Emirates and flydubai have announced that customers of both airlines can once again access a wider range of travel options around the world, connecting seamlessly and safely through Dubai.

Following the progressive resumption of passenger flights to global destinations, the two Dubai-based airlines have revived their successful and strategic partnership to offer customers increased connectivity, convenience and travel flexibility. Emirates customers can now travel on codeshare flights to over 30 destinations on flydubai, while flydubai customers have over 70 destinations they can travel to on Emirates. Some of the favourite flydubai destinations for Emirates passengers include: Belgrade, Bucharest, Kyiv, Sofia and Zanzibar.

Commenting on the renewal of the partnership, Adnan Kazim, Emirates’ Chief Commercial Officer said: “We are delighted to announce that our customers can once again take advantage of the complementary strengths of Emirates and flydubai to access an enhanced network of cities on a single ticket and integrated loyalty programme, enjoy a safe, smooth and stress-free transfer experience through Dubai and have their baggage checked through to their final destination.

Hamad Obaidalla, Chief Commercial Officer at flydubai said: “We are confident that the demand for travel will continue to increase as more countries gradually start to lift restrictions on international travel. flydubai has restarted operations to 32 points around the network since June and we expect the number to steadily grow over the next few months. Dubai has put strong health and safety protocols in place which has encouraged well informed passengers to travel, whether for business, leisure or to reunite with their loved ones.

Emirates and flydubai will offer travel experiences reflecting their individual brands while keeping the health and safety of customers and employees on the ground and in air as their top priority. The two airlines have each implemented extensive safety measures to combat COVID-19 at every step of the customer’s journey including enhanced sanitisation of all touchpoints and advanced HEPA filters fitted in aircraft cabins to eliminate dust, allergens and germs from the cabin air.

Customers transiting through Dubai go through thermal screening at the airport. Transfer desks at Dubai airport have been fitted with protective anti-microbial screens and airport staff dressed in personal protective equipment (PPE) are available to provide additional assistance. Several of flydubai’s flights to destinations in Africa, Central Asia and Europe operate from Terminal 3 of Dubai International Airport, facilitating seamless connections to passengers travelling on Emirates’ flights to and from Dubai.

Blue Air to Decide on Boeing 737 MAX Order After Investigation

BUCHAREST, March 14 (Reuters) – Romania’s Blue Air will make a decision on its order for 12 Boeing 737 MAX 8 jets only after an investigation into a fatal crash of one of the planes in Ethiopia at the weekend, CEO Marius Puiu told Reuters.

Puiu said his company was “monitoring the situation very carefully.”

“We trust the world-wide precautionary suspension of flights, a decision that puts civil aviation transport safety first,” said Puiu, adding the first 737 MAX 8 plane was planned to arrive in Romania this summer.

“We are in permanent contact with the manufacturer, with EASA (the European Union’s aviation safety regulator) and the Romanian civil aeronautical authority,” he said.

Currently, Blue Air operates 25 Boeing 737 series aircraft – 737-300, 737-400, 737-500, 737-700 and 737-800, with capacities ranging from 120 to 189 seats.

(Reporting by Radu Marinas; Editing by Mark Potter)