TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: delay (Page 1 of 2)

Cathay Pacific Posts Record $1.27 Billion First Half Loss

Cathay Pacific aircraft are seen parked on the tarmac at the airport, following the outbreak of the new coronavirus, in Hong Kong

SYDNEY (Reuters) – Hong Kong’s Cathay Pacific Airways Ltd reported a record HK$9.87 billion ($1.27 billion) first-half loss and said it did not expect a meaningful recovery in passenger demand for some time due to the coronavirus pandemic.

The figure was in line with the HK$9.9 billion forecast it had flagged last month and included HK$2.47 billion of impairment charges.

Revenue plunged 48.3% to HK$27.7 billion in the six months ended June 30 as it slashed passenger flying to a barebones schedule due to lower demand and border restrictions, though it added more cargo-only flights as freight yields rose 44.1%.

The airline, which received a $5 billion rescue package led by the Hong Kong government, has so far refrained from large-scale job cuts but has warned it is reviewing all aspects of its business model with an update expected by the fourth quarter.

“Inevitably this will involve rationalisation of future planned capacity compared to pre-crisis plans, taking into account the market outlook and cost structure at that time,” Chairman Patrick Healy said in a statement on Wednesday.

It has rearranged its aircraft order book with Airbus SE to delay deliveries, is in advanced talks with Boeing Co to do the same and has begun sending one-third of its fleet outside Hong Kong for storage in less humid conditions.

The airline said last month that it had reduced its monthly cash burn to about HK$1.5 billion from between HK$2.5 billion and HK$3 billion while maintaining a minimal flying schedule.

Cathay is expected to report a full-year loss of around HK$13.6 billion, according to the average of 13 analysts polled by Refinitiv before it released its half-year results.

The airline’s shares had surged 9.3% on Wednesday ahead of the earnings announcement, which was made while trading was suspended for the market’s lunch break.

“It is laggard buying on some traditional economy stocks,” Steven Leung, a sales director at UOB Kay Hian, said of the rise.

($1 = 7.7506 Hong Kong dollars)

(Reporting by Jamie Freed; additional reporting by Donny Kwok in Hong Kong; Editing by Himani Sarkar)

Nikki Haley Resigns from Boeing Board over Request for Government Financial Assistance

(Reuters) – Former U.N. ambassador Nikki Haley has resigned from Boeing Co’s board after opposing its bid for government financial assistance due to the crisis caused by the coronavirus outbreak.

“I cannot support a move to lean on the federal government for a stimulus or bailout that prioritizes our company over others and relies on taxpayers to guarantee our financial position,” Haley said in a letter to the company’s management released by Boeing on Thursday.

“I have long held strong convictions that this is not the role of government.”

Haley, a former South Carolina governor, has often been mentioned as a future presidential candidate. “The board and executive team are going in a direction I cannot support,” she wrote.

When asked to respond to Haley’s concerns, Boeing said only the company appreciated her service on the board and wished her well.

Boeing this week said it was seeking on behalf of itself and the aviation manufacturing industry at least $60 billion in government loan guarantees and other assistance. The sector faces huge losses from the coronavirus pandemic as airlines halt flights and some delay orders.

A Senate Republican proposal introduced Thursday would allow aviation manufacturing firms like Boeing to seek collateralized loans and loan guarantees from a $150 billion fund but not provide any cash. The final decision on eligibility would be up to the U.S. Treasury.

“We are not bailing out the airlines or other industries – period,” said Senator Richard Shelby, a Republican who chairs the Appropriations Committee.

To ensure the government is compensated for risks in making loans, the U.S. Treasury could seek equity, warrants stock or other instruments to ensure the government participates in any gains.

Haley’s resignation letter was dated Monday, the same day Boeing confirmed it was in talks to seek short-term assistance from the U.S. government.

Boeing has racked up nearly $19 billion in costs tied to its 737 MAX aircraft, which has been grounded for the past year after two fatal crashes in five months. The company has been working to win approval for the plane to return to service.

(Reporting by Ankit Ajmera in Bengaluru and David Shepardson in Washington and Michelle Nichols in New York; Editing by Arun Koyyur and Tom Brown)

Due to the COVID-19 Outbreak, Icelandair Posts Travel Update

Due to the COVID-19 outbreak, many countries have implemented travel restrictions. Here we have collected information on various travel restrictions to destinations that we fly to. Please be advised that the following is subject to change on short notice. We will attempt to update you as promptly as possible.

If you do not have a flight in the next 72 hours we kindly ask you to consider contacting us in a few days. Due to high volumes for incoming calls and requests, we apologize for the delay in our responses. We will do our best to post any updates on our website and social media as soon as the latest information is available.

If you have a ticket with Icelandair and are affected by these restrictions, please read our FAQ.

You are able to change your ticket yourself here.

Ryanair Tries to Delay Operations Chief’s Flight to easyJet

FILE PHOTO: Chief Operating Officer Bellew of Ryanair attends a news conference in Frankfurt

DUBLIN (Reuters) – Ryanair <RYAAY> heads to court on Tuesday to try to prevent operations chief Peter Bellew from joining arch-rival easyJet <ESYJY> until 2021.

Europe’s biggest budget airline said in July that the former Malaysia Airlines boss would step down at the end of the year.

But after easyJet announced Bellew’s appointment as its new chief operations officer a week later, Ryanair launched legal proceedings in Ireland’s High Court.

Ryanair argues that all its senior executives commit to non-compete clauses barring them from joining a competitor for 12 months after leaving the Irish airline.

Ryanair boss Michael O’Leary told reporters in September that the only issue was whether Bellew, who is currently working out his notice, can join easyJet on Jan. 1, 2020, or Jan. 1, 2021, a full 18 months after easyJet announced his appointment.

An easyJet spokeswoman declined to comment on the case. Bellew has not commented on the case since Ryanair initiated proceedings.

O’Leary has said the timing of Bellew’s switch is sensitive because of the problems Ryanair is currently having with Boeing’s <BA> grounded 737 MAX jet, which have slowed down its growth plans.

Ryanair is one of Boeing’s biggest customers for the MAX 737, with 210 on order, and the airline said last month it expected a further delay to deliveries that could leave it without the new jets next summer.

Bellew left his role as CEO of Malaysia Airlines two years ago to return to Ryanair where he was director of flight operations before leaving for Kuala Lumpur in 2014.

Tasked with tackling a pilot revolt that resulted in Ryanair’s first ever strikes, Bellew has helped patch up relations with staff and agree deals on pay and conditions with trade unions that have quelled the unrest.

An Irish national, Bellew described his return to Ryanair in 2017 as “a form of national service” to help what he described as Ireland’s greatest company. Some observers had seen Bellew as a possible future Ryanair chief executive.

(Reporting by Padraic Halpin; Editing by Mark Potter)

Arms Firms Fret Delays in Franco-German Fighter Project

PARIS, Oct 7 (Reuters) – France’s Dassault Aviation and Europe’s Airbus have stepped up pressure on France and Germany to agree on the next stage of a planned fighter project, warning Europe’s arms industry and long-term security could suffer from delays.

The two companies are the leading industrial partners in a project to build a futuristic swarm of manned and unmanned warplanes, announced by the leaders of France and Germany two years ago and expanded earlier this year to include Spain.

Dassault and Airbus won a 65-million-euro contract in January to develop the concept for the Future Combat Air System (FCAS) but await a new contract to build demonstrators for interlinked fighters, drones and an “air combat cloud” by 2026.

Dassault Aviation Chief Executive Eric Trappier told a conference of policymakers last month that the demonstrator contract should have been launched in September but this was now slipping towards end-year. He called it “indispensable” to avoid any further delays in order to maintain the 2026 deadline.

No reason has been given for the delays.

On Monday evening, Dassault and Airbus amplified those warnings with a joint statement.

“If Europe does not move forward — and move forward quickly — on this programme, it will be impossible to maintain the development and production capabilities needed for a sovereign defence industry,” the companies said.

The warplane system is expected to be operational from 2040, with a view to replacing Dassault’s Rafale and the four-nation Eurofighter, in which Airbus represents both Germany and Spain.

The new project faces competition from Britain and its plans for a new combat jet dubbed “Tempest”.

The fighter developments have split the current Eurofighter consortium and led to a shake-up of industrial alliances as Italy joins Eurofighter partner Britain on Tempest, turning its back on Germany and Spain, while Sweden has opened the door to abandoning its independent stance by co-operating on Tempest.

The FCAS is also overshadowed by differences between France and Germany over export policy after Germany imposed a ban on arms exports to Saudi Arabia over the death of killing of journalist Jamal Khashoggi a year ago by Saudi operatives.

The ban, recently extended to March, has raised questions over a long-delayed Saudi border systems contract run by Airbus.

Airbus Defence and Space Chief Executive Dirk Hoke called in a magazine interview last week for the export ban to be relaxed. German Chancellor Angela Merkel’s government has said there is no reason for the moratorium to be lifted.

France and Germany are expected to discuss the issue at ministerial meetings this week.

AIRBUS SETBACK IN SPAIN

Airbus meanwhile faces a battle to shore up its position as a top defence contractor in Spain after losing its place as the representative of Spain’s interests on the upcoming fighter project to local defence electronics firm Indra Sistemas.

Spain last month named Indra as contractor for the Spanish share of the Franco-German-led FCAS project, displacing Airbus from the Spanish coordinator role it had held on Eurofighter.

Airbus officials have pledged to try to overturn the move but a Spanish defence source told Reuters there was no change in the decision.

Indra declined to comment.

Publicly, Airbus has said it was surprised by the decision but has pledged to continue to defend Spain’s best interests.

Dassault will meanwhile mark a long-awaited milestone on Tuesday when it delivers the first of 36 Rafales to India, the culmination of a fighter procurement process that lasted almost 20 years and involved the cancellation of a much larger deal.

La Tribune reported on Monday that France and India were discussing a possible repeat order for 36 more Rafales.

(Additional reporting by Emma Pinedo Gonzalez in Madrid, Tassilo Hummel in Berlin, Editing by Deepa Babington)

Alitalia Rescuers to Ask for Another Delay

MILAN, Sept 5 (Reuters) – Companies hoping to rescue Italian carrier Alitalia will ask for a deadline for presenting their plan to be extended as they are still negotiating key aspects, two sources familiar with the matter said.

Italian railway group Ferrovie dello Stato, which is leading an effort to take control of Alitalia, is expected to ask administrators running the carrier for a “substantial” delay to the Sept. 15 deadline, one of the sources said.

It would be the sixth delay since Ferrovie expressed its interest in investing in the carrier at the end of last year.

Ferrovie, infrastructure group Atlantia and U.S. carrier Delta Air Lines have been discussing a joint plan for Alitalia for nearly two months, but they are at odds over highly-profitable North American routes, three sources familiar with the matter said.

The Italian partners in the consortium want Alitalia to have more freedom to expand its North American routes compared to what Delta is currently offering under a new cooperation agreement dubbed Blue Skies that it has set up with Air France KLM and Britain’s Virgin Atlantic.

How Alitalia would share the revenue coming from North American routes with Delta and other partners in the Blue Skies alliance is also under negotiation.

“The role of Alitalia in the Blue Skies alliance is a point of contention,” one of the sources said.

Long-haul flights to the United States and Canada account for more than one third of Alitalia’s revenue and are considered key to reviving the Italian carrier, which was put under special administration in 2017 after workers rejected the latest in a long line of rescue plans.

Administrators appointed by Italy’s government have cut costs and renegotiated plane leasing contracts to make Alitalia more efficient, but the carrier still burns cash and had been kept afloat thanks to a 900 million-euro bridging loan granted by Italy’s treasury.

Alitalia had only 410 million euro left in its coffers in July and would need fresh funds by the end of the year when it is expected to post a loss, according to another source.

Delta and Ferrovie declined to comment. (Additional reporting by Tracy Rucinski in Chicago Editing by Alexandra Hudson)

BOC Aviation Expects Delivery Delay of up to 30 Jets

SINGAPORE (Reuters) – Aircraft lessor BOC Aviation Ltd said on Tuesday it expected up to 30 Boeing Co <BA> and Airbus SE <EADSY> jets that had been scheduled to arrive this year could be delayed, primarily due to the Boeing 737 MAX grounding.

BOC said 18 jets that had been due in the first half had been delayed, including 12 A320neo’s due primarily to industrial constraints and 6 737 MAX’s as a result of the grounding.

For the full year, up to 7 A320neo’s and 23 737 MAX’s could be delayed, including three for which an airline customer has the right to acquire upon delivery, Asia’s second-biggest aircraft lessor said in a statement.

BOC said it was working with Boeing on a revised delivery timeframe.

Boeing last week estimated a return to service for the jet would begin early in the fourth quarter, but it did not rule out further reducing or temporarily shutting down production of the plane if that forecast needed to be revised.

U.S. carrier Southwest Airlines Co <LUV> last week removed the 737 MAX from its schedules until Jan. 5, 2020, saying it would need one to two months following regulatory approval to train pilots and prepare the jets for fresh commercial service.

(Reporting by Jamie Freed; Editing by Stephen Coates)

Boeing to Buy Aerospace Interiors Company EnCore Group

June 14 (Reuters) – Boeing Co on Friday said it would buy aerospace interiors company EnCore Group, the planemaker’s second foray into aircraft seats after it partnered with auto seats maker Adient last year.

The deal could help cut delays in the supply chain and improve profit margins for the planemaker, and is expected to close by the end of the second quarter of 2019.

California-based EnCore designs, certifies and produces airplane galleys and seats for airlines, and also supplies components to Boeing.

Last year, the planemaker moved into making aircraft seats with a joint venture with car seating leader Adient to reduce costly delays to deliveries.

Traditionally, aircraft seat makers sell seats to airlines, a process that can involve multiple customized designs and regulatory approvals and in turn lead to industrial delays.

(Reporting by Sanjana Shivdas in Bengaluru; Editing by Shinjini Ganguli)

Turkey Says No Delays in Delivery of Russian S-400’s

ANKARA, May 31 (Reuters) – The delivery schedule for Russia’s S-400 missile defence systems to Turkey is continuing as planned, Turkish Foreign Ministry Spokesman Hami Aksoy said on Friday, dismissing reports of delay.

The U.S. and Turkey have been at odds over Ankara’s decision to purchase the S-400’s, which Washington says are not compatible with NATO systems and poses a threat to the F-35 stealth fighter jets. Ankara has proposed to form a working group to assess the U.S. concerns, but has not received a response yet.

On Monday, broadcaster Haberturk quoted Turkish Defence Minister Hulusi Akar as saying that the delivery of the S-400’s may not happen in June, when Turkey previously said the missiles were due to arrive, but added the agreement was a done deal.

“Reports in some media outlets about Turkey evaluating delaying the S-400 procurement upon the request of the United States do not reflect the truth,” Aksoy said in a statement, adding that Ankara’s offer for a joint working group with Washington was still valid.

(Reporting by Tuvan Gumrukcu and Ece Toksabay)

U.S. Air Force F-35A

Air Canada Delays Launch of Seasonal Routes

(Reuters) – Air Canada said on Tuesday it would delay the launch of certain seasonal flights this spring, as the carrier wrestles with the challenge of servicing routes previously flown by its grounded Boeing 737 MAX aircraft.

Canada’s largest carrier said it would put off the launch of at least five seasonal routes, including delaying its Vancouver to Boston service to June 16 from June 1.

Montreal-based Air Canada said a previously-announced halting of flights from two Eastern Canadian cities to London’s Heathrow airport would now remain suspended until May 31.

Air Canada, which previously suspended its 2019 financial forecasts, has removed 24 MAX jets from its flight schedule until July 1, following grounding of the Boeing jets after two recent crashes involving the model.

The global grounding, following the crash of an Ethiopian Airlines flight in March, has left U.S. and Canadian airlines with the logistical challenge of replacing the popular roughly 175-seat MAX on certain routes, at a time of rising passenger demand.

The Canadian carrier has been flying alternative planes or consolidating flights into larger jets that were previous flown more frequently on smaller aircraft.

Air Canada has also said it is speeding up the integration of four Airbus A321 aircraft it acquired in late December from Iceland’s cash-strapped WOW air.

Air Canada is “accommodating as best as they can,” said AltaCorp analyst Chris Murray. “At the same time, there is still some uncertainty about when the MAX grounding notice is going to be lifted.”

On Monday, Boeing said it planned to submit a proposed software enhancement package for the grounded 737 MAX in “the coming weeks” after the company had previously said it planned to deliver the fix for government approval by last week.

Anglo-German tour operator TUI said last week that its profit would fall by at least 200 million euros ($223.96 million) this year due to the cost of substituting for the MAX planes, along with loss of business and lower fuel efficiency from the replacement aircraft.

(Reporting by Sanjana Shivdas in Bengaluru; Editing by Shinjini Ganguli and Bill Berkrot)

« Older posts