TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: Hennigsdorf

Alstom to Provide Additional 64 Commuter Trains to Hamburg, Germany

Alstom and S-Bahn Hamburg GmbH have signed a contract for the delivery of an additional 64 Class 490 S-Bahn trains. The order is an option from a framework contract signed in 2013 and is valued at around 500 million euro. 

As with the previous trains, passengers will enjoy the proven amenities of these three-car electric multiple units, but with the addition of some new improvements to better meet the needs of Hamburg’s passengers. For example, the new S-Bahn train’s middle cars will feature a multipurpose area with room for bicycles, luggage, and dedicated spaces to accommodate passengers with limited mobility.

However, the train’s most significant innovation will be invisible to passengers. For the first time in Germany, S-Bahn trains will be equipped with the European Train Control System (ETCS) Baseline 3 Release 2 and automated train operation (ATO) technology. Together, these technologies will ensure denser and more frequent service and enable Hamburg to provide more fluid transport while increasing the overall number of train journeys. In addition, the flexibility of Hamburg’s new S-Bahn trains means that they will couple with the 82 Class 490 S-Bahn trains already in service.

Photo of main Hamberg train station from author’s visit in 2016.

This order marks Germany’s first implementation of ATO in automation level 2 (GoA 2) for new S-Bahn vehicles. In addition, S-Bahn Hamburg GmbH will receive vehicles that already comply with the latest state-of-the-art signalling technology. The trains will be delivered with Alstom’s intelligent onboard technology for ETCS, with integrated ATO software that meets the high demands of future digital rail operations in terms of performance, availability, and automation.

Initially, Alstom will manufacture three vehicles that will undergo extensive testing and inspection, in particular for approval of their ETCS and ATO functionalities. Vehicle deliveries to Hamburg are scheduled for 2025 and 2026. 

Among others, Alstom’s sites in Hennigsdorf, Bautzen (production), Berlin (signalling), Braunschweig, Siegen and Mannheim, Germany, will be involved in the production of the new S-Bahn trains. This is in addition to sites in Charleroi, Belgium (ETCS), Wroclaw, Poland, Västeras, Sweden and Vadodara, India, which will also participate in production.

In Germany, Alstom offers innovative solutions for sustainable mobility and is one of the leading suppliers of railway technology with metros, suburban trains, trams, regional trains, locomotives and signalling solutions. Our trains travel from Schleswig-Holstein to Bavaria. More than 70% of high-speed trains running in Germany are equipped with Alstom’s ETCS signalling solutions. In Lower Saxony, Alstom is building the world’s first fuel cell-powered, completely emission-free Cordia iLint regional train in series production. Alstom is Germany’s only manufacturer of infrastructure, signalling and digital mobility solutions to provide maintenance, service and modernisation of all mass transit trains for all manufacturers’ series, as well as information systems.

Alstom Leads Way for Automated Train Operation in Stuttgart Network

Alstom (OTC: ALSMY) has signed a contract with Germany’s Baden-Wuerttemberg State Institute for Rail Vehicles (SFBW) to retrofit 118 regional trains with the European Train Control System (ETCS) Automatic Train Operation (ATO) digital signalling technology. Part of the Stuttgart Digital Node lighthouse project, the contract is valued at approximately 130 million euro1 and includes an innovation cooperation agreement software maintenance contract and a contract for further maintenance.

In addition to the recently announced S-Bahn project, the new retrofit project covers 118 trains that SFBW operates on the high-traffic Stuttgart network. The trains come from several different suppliers and will be upgraded with the European Train Control System (ETCS) Level 2 and 3 as well as Automatic Train Operation (ATO) level 2 (GoA2) technology. The initial upgrade project will be completed by 2024 and the subsequent upgrade, according to the European Technical Specifications for Interoperability 2022, will be completed by 2027. 

While ATO technology has already been implemented in metros and urban rail lines in cities like Paris, the highly automated operation (GoA 2) is now being used for the first time in Germany on the basis of ETCS Level 2 in the Stuttgart Digital Node.  When completed in 2024, the new signalling technology will increase capacity and frequency on the Stuttgart network while also making the trains performance more sustainable.

As part of the agreed innovation cooperation, Alstom and SFBW will also define the requirements for Train Integrity Monitoring (TIM), Future Railway Mobile Communication System upgrade capability, Train Capability and for Open CCS On-board Reference Architecture (OCORA). The implementation of the developed requirements by Alstom is part of the contract, as is the software maintenance of the regional trains.

The project is being carried out by the Alstom signalling site in Berlin, Germany, in close cooperation with the ETCS competence center in Charleroi, Belgium. Other locations involved in the various project phases are Braunschweig, Salzgitter, Mannheim and Hennigsdorf in Germany as well as Bangalore, India, Bucharest, Romania and Lyon-Villeurbanne, France. The series installation will take place close to Stuttgart or in Hennigsdorf.

European Commission Clears Alstom’s acquisition of Bombardier Transportation

Alstom and Bombardier welcome the European Commission’s (EC) decision for conditional clearance of the proposed acquisition of Bombardier Transportation by Alstom.

The Commission’s approval for the transaction is conditional on the proposed engagements that consist of:

  • A transfer of Bombardier Transportation’s contribution to the V300 ZEFIRO very high-speed train and an offer of IP licence to Hitachi for the train co-developed by Hitachi and Bombardier Transportation for use in future very high-speed tenders in the UK
  • The divestment of the Alstom Coradia Polyvalent and the Reichshoffen production site in France
  • The divestment of the Bombardier TALENT 3 platform and dedicated production facilities located within the Hennigsdorf site in Germany
  • Providing access to certain interfaces and products for some of Bombardier Transportation’s Signalling On-Board Units and Train Control Management Systems (TCMS)

The divestitures will comply with all applicable social processes and consultations with employee representatives’ bodies.

The transaction remains subject to further regulatory approvals in several other jurisdictions and customary closing conditions. 

Closing of the acquisition is expected for the first half of 2021.