TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: Pan Am

Amtrak Downeaster Resumes Limited Service June 15

PORTLAND, MAINE – The Northern New England Passenger Rail Authority (NNEPRA) announced yesterday that the Amtrak Downeaster will begin Phase 1 of Service Restoration beginning June 15, 2020.   Service will resume with one round trip on weekdays only between Brunswick, ME and Boston, MA:  southbound Train 680 and northbound Train 685.  Downeaster service has been suspended since April 13, 2020.

A number of protocols and procedures have been implemented to protect the health and safety of passengers and crews. 

Highlights of Phase 1 Service Restoration Plan:

  • Amtrak has implemented new cleaning and disinfecting protocols nationwide, and train equipment used in Downeaster service will undergo enhanced cleaning before and after each trip.
  • Crews and passengers will be required to wear face covering while boarding and moving about the train
  • The number of passengers per train will be limited to no more than 50% of available seating capacity so riders are able to adhere to physical distancing guidelines. 
  • Advance reservations are required and cash sales will not be accepted.
  • Station facilities will not be open; passengers should go directly to the outdoor platform to wait for their train.
  • Café service will not be available, however complimentary water will be available upon request. 
  • Stations are being updated with signage and other enhancements to promote public health and physical distancing.

While NNEPRA expects Downeaster increase service throughout the summer months, no date has been set for subsequent phases.  The NNEPRA Board of Directors plans to meet later this month to evaluate the potential for adding more daily trips.

Pan Am Railways has expedited a series of track improvement and maintenance projects along the Downeaster corridor to take place this spring to avoid construction-related service interruptions later in the year.  The schedule for Train 680 has been modified slightly to adjust for construction-related delays.  Passengers on travelling on Train 685 to stations north of Haverhill should expect delays of approximately 15 minutes.  

Complete information about the steps Amtrak is taking to protect the health and safety of their passengers and crews is available at Amtrak.com

For additional Amtrak Downeaster information visit: AmtrakDowneaster.com

Amtrak Downeaster, Boston, MA, BON, Amtrak Conductor The Downeaster is a 145-mile regional passenger train service, managed by the Northern New England Passenger Rail Authority, and operated by Amtrak.

The Boeing 747SP

I came across a great story about the Boeing 747SP earlier today. The Boeing 747SP was a modified version of the Boeing 747-200 jet airliner designed for ultra-long-range thin routes. The SP stands for “Special Performance”.

Click the link below to read the full story!

Boeing 747SP

La Guardia Airport turns 78 years old

La Guardia Airport has turned 78 years old today, December 2, 2017. The airport opened as New York Municipal Airport on December 2, 1939, and is one of the three primary commercial air terminals serving the New York City area. The airport occupies 680 acres of the New York Borough of Queens, and is located just a fews minutes from downtown Manhattan. It serves a general population of approximately 19 million people. The Port Authority of New York and New Jersey took over the operation of LGA in 1947. The facility has four passenger terminals and two main runways.

Originally regarded as a $40 million boondoggle, public fascination with air travel led to thousands of people visiting the airport to watch the airliners take off and land. Two years later, the airport was generating $935,000 a year, and quickly became a financial success. The new airport received the commitment of the five largest airlines currently operating in the United States to serve the facility. These carriers were American Airlines, Eastern Air Lines, Pan American World Airways, Transcontinental & Western, and United Airlines. Pan Am would also move it’s transatlantic flying boat service to La Guardia Airport in 1940.

LGA is currently undergoing an extensive redevelopment program in an effort to provide updated facilities for both passengers and airlines. The Port Authority will undertake the construction of a new 1.3 million square foot, 35 gate terminal building, the demolition of Hangars 2 and 4, and the construction of a new East Parking Garage. A consortium called La Guardia Gateway Partners will design, build, manage, and maintain the new terminal B under a 35-year lease agreement. Delta Air Lines will also develop, construct, operate, and maintain a brand new terminal to replace the existing terminals C and D under a new lease agreement. The lease agreements are with the Port Authority of New York and New Jersey, and will run through 2050.