TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: Peixoto

Embraer Delivers First Modernized E-99 Jet to Brazilian Air Force

From Embraer press release

In a ceremony held today at the Embraer facility in Gavião Peixoto (São Paulo, Brazil), Embraer delivered the first modernized EMB 145 AEW&C (Airborne Early Warning and Control), designated E-99, to the Brazilian Air Force (FAB). Four additional E-99 aircraft will be modernized as part of the contract.

The mission systems and related subsystems, including electronic warfare, command and control, electronic countermeasures, and aerial surveillance radar were updated as part of the modernization process, expanding FAB’s capacity to carry out Flight Control and Alarm missions and Electronic Reconnaissance, among others.

The E-99M project is conducted by COPAC with support from Embraer and various international suppliers, such as SAAB, Aeroelectronica International (AELI), and Rohde & Schwarz. In addition to modernization, the project entails technology transfer agreements that will enable technological advancements for the Brazilian defense industry.

Atech, an Embraer Defense and Security company, participates in the development of the command and control system. Six mission planning and analysis stations were also acquired, which will be used for the training and improvement of crews.

Built on the successful ERJ 145 regional jet platform, with more than 1,200 units delivered and 30 million flight hours, the FAB E-99 aircraft can detect, track, and identify targets in their patrol area and transmit this information to allied forces. The aircraft can also perform airspace management, fighter positioning and interception control, signals intelligence, and surveillance missions.

Embraer & EDP Announce Joint Effort in Electric Aircraft Research

Embraer and EDP, a company that operates in all segments of the Brazilian energy sector, have signed a partnership for electric aircraft research. Through its EDP Smart division, the Portuguese-based multinational announced a financial contribution for the acquisition of energy storage and battery charging technologies for Embraer’s all-electric demonstrator aircraft project, utilizing the EMB-203 Ipanema as its test bed. The prototype, which is already in development, is scheduled to complete its inaugural flight in 2021.

The investment is part of the cooperation agreement signed by both companies to advance their shared knowledge of energy storage and battery charging technologies for aviation – one of the main challenges of the project. The partnership aims to investigate the applicability of high voltage batteries for the electric propulsion systems of small aircraft, in addition to evaluating the main operating characteristics, such as weight, efficiency and power quality, thermal control and management, cycling loading and unloading, and operational safety.

EDP Headquarters in Portugal

Technological Cooperation

This proposal for the technological development of aeronautical electrification was initially created as a cooperation between Embraer and WEG, in May 2019. The project was developed as an effective and efficient instrument for training and for the maturation of technologies prior to their application in future products.

The scope of the partnership with EDP is to develop shared research in the storage of high voltage energy, complementing Embraer’s ongoing research. These research and development initiatives seek to accelerate the combined knowledge of the technologies necessary for the use and integration of batteries and electric motors in order to increase the energy efficiency of the propulsion systems of aircraft.

For the evaluations, a small single-engine aircraft is being used as the test bed to perform a primary assessment of electrification technologies. Ground tests have taken place at Embraer’s facilities in Botucatu, in the interior of São Paulo, in preparation for the first flight, which will take place at Embraer’s Gavião Peixoto unit.

Electrification is just one project in a series of initiatives being developed by Embraer and the entire aeronautical industry aimed at ensuring a commitment to environmental sustainability, as already exemplified by biofuel developments to reduce carbon emissions.

EDP has a global commitment to electrify 100% of its fleet by 2030, as well as to develop new offers and commercial solutions that promote the energy transition. Last year, during Aneel’s Public Call on the topic of Efficient Electric Mobility, the Company approved an investment of about R$ 50 million in projects, via a Research and Development Fund consisting of both corporate and partner resources.

The First Brazilian Gripen Flies in Brazil

The first Brazilian Gripen E, designated by Brazilian Air Force (FAB) as F-39 Gripen, concluded its first flight in Brazil. The aircraft flew from the airport in Navegantes to Embraer’s facility in Gavião Peixoto. The official presentation of the aircraft is scheduled to take place during the Aviator’s Day and the Brazilian Air Force Day ceremony in Brasilia, celebrated on the 23rd of October.

The President and CEO of Embraer Defense & Security, Jackson Schneider, highlighted the scope of this partnership: “Embraer will play a leading role in the execution of the Gripen programme in Brazil and will be responsible for systems development, integration, flight testing, final assembly, and delivery of the aircraft in support of Brazilian Air Force operations. In terms of technology transfer, the Gripen programme is a great opportunity to increase our knowledge in the development and manufacturing of advanced combat aircraft.”

The Brazilian Minister of Defence, Fernando Azevedo e Silva also highlighted the importance of sharing experiences arising from cooperation between Brazil and Sweden: “Gripen increases the operational capacity of the Brazilian Air Force and promotes a partnership that fosters research and industrial development in both countries,” the Minister of Defence declared.

For the Air Force Commander, Lt. Brig. Antonio Carlos Moretti Bermudez, the arrival of the first F-39 Gripen aircraft is a major milestone for the project: “It is an immense satisfaction for the Brazilian Air Force to see this aircraft flying on national territory. The F-39 Gripen, the new Brazilian Air Force multi-mission aircraft, will be the backbone of Fighter Aviation and it reaffirms the FAB’s commitment to maintaining the country’s sovereignty and to defend the twenty-two million square kilometres under its responsibility”, Lt. Brig. Antonio Carlos Moretti Bermudez points out.

The flight test programme will be expanded to include the Gripen Flight Test Center at Embraer in Gavião Peixoto, which will be fully integrated with the test programme already running at full phase at Saab in Linköping since 2017. Activities in Brazil will include testing of flight control system, environmental control system as well as tests in the aircraft in tropical climate conditions. In addition to the testing that is common for the Gripen E Programme, unique features of the Brazilian aircraft, such as weapons integration as well as the Link BR2 communication system – which provides encrypted data and voice communication between the aircraft – will be tested in Brazil.

The production aircraft will be delivered to the Brazilian Air Force, at Wing 2 in Anápolis (Goiás State), by the end of 2021.