TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: proposals

Air New Zealand Outlines Requirements for Low Emissions Turboprop Aircraft

By Jamie Freed – Reuters news…

(Reuters) – Air New Zealand Ltd said on Tuesday it had outlined requirements to suppliers as part of plans to replace its fleet of De Havilland Canada Dash 8 Q300 turboprops with lower-emissions technology by around 2030.

“The ideal candidate aircraft will be a drop in replacement for the Q300 for seamless integration into the existing Air New Zealand turboprop network, which may include retrofit of the existing aircraft,” the airline said.

Click the link below to read the full story!

https://finance.yahoo.com/news/air-zealand-outlineshttps://finance.yahoo.com/news/air-zealand-outlines-requirements-low-221729362.html

DB and SBB to Increase Rail Service Between Germany and Switzerland

Demand for international rail services between Germany and Switzerland has increased rapidly in recent years. At the Basel border crossing alone the number of passengers has increased by over 25 per cent in the past five years. Given the increasing importance of climate protection, the increase in travel by rail, an environmentally friendly mode of transport, is a trend which is expected to continue. Despite the current challenges presented by the COVID-19 crisis, the two rail companies DB and SBB firmly believe there is tremendous growth potential in rail services between Germany and Switzerland over the medium and long term. As a result, DB and SBB are planning a significant increase in services. Both rail companies today signed a memorandum of understanding on the proposals.

The planned increase in services will be made possible thanks to the opening of Stuttgart 21 and the completion of the Karlsruhe–Offenburg and Müllheim–Basel stages of improvements by 2026. The increase in services involves switching operation of all ICE services between Switzerland and Germany to ICE 4s, this being DB’s most modern train, and the use of SBB Giruno compositions in Germany.

The key features of the service increase planned from the 2026 timetable are:

– The number of direct services between Switzerland and Germany will rise from 26 at present to 35 connections a day.

– Two new direct services a day from Hamburg via Basel to Lugano will improve the services on the north-south axis via the Gotthard route. The use of the Giruno on this line means that further direct connections from Germany to Milan could be added in future.

– The new plan also involves running new direct services from Germany via Bern to Valais.

– The deployment of the ICE 4 on the Dortmund–Cologne–Basel line makes it possible to provide new direct services from North Rhine-Westphalia, Germany’s most populous federal state, to Switzerland.

– The half-hourly frequency in future on the Zurich to Chur route will allow additional direct connections from Germany to Chur to be provided.

– The journey time between Frankfurt and Zurich will be reduced by 20 minutes to 3 hours and 40 minutes.

In conjunction with the joint increase in services, SBB Giruno trains will also now be used on routes between Switzerland and Germany. SBB also plans to procure additional Giruno compositions from manufacturer Stadler Rail using existing options available. Vincent Ducrot, CEO of SBB, believes this increase in services is another major step which underlines SBB’s strong commitment to significantly improving international passenger services: “We want to make rail travel in Europe easier for our customers. Rail offers major advantages in terms of travel time and comfort and has gained further impetus from the climate debate. This is why we are focusing on the further development of international services. It is important to look at sustainable and efficient mobility at European level. Infrastructure projects, such as the Ceneri Base Tunnel and Stuttgart 21, are pioneering in this respect.” Richard Lutz, CEO of Deutsche Bahn, said: “2021 is the European Year of Rail. Projects such as the revival of the Trans Europ Express for cross-border services and the development of our cooperation with SBB demonstrate this. These are wonderful indications that rail travel is growing across the entire continent, and first and foremost, that people and economic activity in Europe are coming closer together.”

Der neue Fernverkehrszug der SBB “FV Dosto”, ein Doppelstockzug, fotografiert wahrend der Typentestfahrt in Interlaken, am Donnerstag, 11. Mai 2017. (KEYSTONE/Anthony Anex)……..

Boeing’s New CEO Orders Rethink on Key Jetliner Project

LONDON/CHICAGO (Reuters) – Boeing Co’s new chief executive has sent the aerospace giant back to the drawing board on proposals for a new mid-market aircraft, effectively shelving in their current form plans worth $15 billion-$20 billion that had been overtaken by the 737 MAX crisis.

A decision on whether to launch a New Midsize Airplane (NMA) seating 220-270 passengers, which seemed imminent barely a year ago, had already been postponed as Boeing gave all its attention to the grounding of the smaller 737 MAX after two fatal crashes.

But days after taking the helm with a mandate to lift Boeing out of its 10-month-old reputational crisis, Chief Executive Dave Calhoun said the competitive playing field had changed.

“Since the first clean sheet of paper was taken to it, things have changed a bit … the competitive playing field is a little different,” he told journalists on a conference call on Wednesday.

“We’re going to start with a clean sheet of paper again; I’m looking forward to that,” Calhoun said.

He also spoke of a fresh approach to the market.

A Boeing spokesman said Calhoun had ordered up a new study on what kind of aircraft was needed. New aircraft typically take 6-7 years or more to bring to market once a decision is made, though Boeing aims to shorten that in part through digital technology and new business models designed around the NMA.

Calhoun “has asked the team to do an assessment of the future market and what kind of airplane is needed to meet the future market,” spokesman Gordon Johndroe said.

Noting that the original assessments on the NMA were made about two and a half years ago, he said the new study would “build upon what has been learned … in design and production.”

In further evidence of a change of pace, people familiar with the matter said a meeting between Boeing and a major potential supplier, originally scheduled for next week, had been abruptly cancelled with no new date set.

That contrasts with the approach just weeks ago when Boeing was still presenting new details of the NMA to some airlines, including a working logo – “theNMA” – and details of an “advanced composite” structure, according to a slide seen by Reuters.

The NMA had been designed to address a slender gap between single-aisle workhorse jets like the 737 MAX and long-haul wide-body jets like the 787.

But most of the effort revolved around a new production system designed not only to support the NMA but to lay the groundwork for the next single-aisle aircraft after the 737 MAX.

Calhoun said he expected the MAX, whose return to service was delayed again earlier this week, to resume its previous place in the market and remain in service for a generation.

Traditionally toe-to toe-with Europe’s Airbus SE, Boeing has fallen behind in sales for the largest category of single-aisle planes, such as the 200-240-seat Airbus A321neo, which overlaps with the niche being targeted by the NMA.

By delaying a decision on the NMA, Boeing already risked losing the sweetest part of the market, especially after Airbus seized contracts with two major U.S. airlines, analysts said.

Analysts have also questioned whether Boeing, facing costs equivalent to a new programme to repair the MAX crisis, as well as delays on its large new 777X jet whose maiden flight is set for Thursday, would have appetite for such a costly project now.

(Reporting by Tracy Rucinski in Chicago and Tim Hepher in London; Editing by Matthew Lewis)

Boeing Out of Minuteman Missile Replacement Competition

The Boeing logo is displayed on a screen, at the NYSE in New York

WASHINGTON (Reuters) – Boeing Co <BA> has decided not to compete as a prime contractor to replace the Pentagon’s aging U.S.-based Minuteman III missile system, paving the way for Northrop Grumman Corp <NOC> to win a contract worth tens of billions of dollars.

Friday marked the deadline to submit proposals to continue work on the replacement of the nearly half-century-old intercontinental ballistic missile (ICBM) system as the military embarks on a costly modernization of its aging atomic weapons.

Boeing said in a statement that it was disappointed it was unable to submit a bid. Northrop said it had submitted its proposal. No other bidders were expected.

Boeing’s decision not to enter a bid as a prime contractor had been foreshadowed this summer in a letter from the chief executive of Boeing Defense Space and Security, Leanne Caret, to Air Force leadership, saying Northrop’s 2018 purchase of solid rocket motor maker Orbital ATK might make it difficult for Boeing to compete on cost.

Orbital is the top producer of the solid fuel rocket motors generally used in Minuteman III and similar missiles.

Upgrading the U.S. nuclear force was expected to cost more than $350 billion over the next decade as the United States works to replace its bombs, nuclear bombers, missiles and submarines. Some analysts estimated the cost of modernization at $1 trillion over 30 years.

The Pentagon’s Cost Assessment and Program Evaluation office has said the total cost to replace Minuteman III could top U.S. $85 billion.

In 2017, the Air Force awarded https://www.reuters.com/article/us-boeing-pentagon-gbsd/u-s-air-force-awards-contracts-to-boeing-northrop-for-icbm-replacement-idUSKCN1B12H3 Boeing and Northrop Grumman separate contracts for the early engineering phase of the program.

(Reporting by Mike Stone; editing by Jonathan Oatis, Rosalba O’Brien and Richard Chang)