TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: suspension (Page 1 of 2)

Boeing Resumes 737 MAX Production

  • Production system enhanced through factory initiatives

Boeing [NYSE: BA] has resumed production of the 737 MAX at the company’s Renton, Washington factory. The 737 program began building airplanes at a low rate as it implements more than a dozen initiatives focused on enhancing workplace safety and product quality.

“We’ve been on a continuous journey to evolve our production system and make it even stronger,” said Walt Odisho, vice president and general manager of the 737 program. “These initiatives are the next step in creating the optimal build environment for the 737 MAX.”

During the temporary suspension of production that began in January, mechanics and engineers collaborated to refine and standardize work packages in each position of the factory. New kitting processes will also ensure that employees have everything they need at their fingertips to build the airplane.

“The steps we’ve taken in the factory will help drive our goal of 100 percent quality for our customers while supporting our ongoing commitment to workplace safety,” said Scott Stocker, vice president of 737 Manufacturing.

The 737 program will gradually ramp up production this year.

Boeing Suppliers Hexcel & Woodward Scrap Merger Plan

(Reuters) – Boeing Co suppliers Hexcel Corp and Woodward Inc on Monday called off their planned all-stock merger as widespread travel bans to curb the coronavirus pummels demand in the aerospace sector.

The companies, which make and supply aircraft parts, had agreed to a merger in January in a $6.4 billion deal.

“Although we are disappointed with this outcome, we are confident this is the right decision for our customers, our shareholders, and our employees,” the companies said in a joint statement.

The market rout triggered by the coronavirus pandemic and the resulting economic downturn has thrown a wrench into corporate deal making. Last month U.S. printer maker Xerox Holdings Corp walked away from its $35 billion hostile cash-and-stock bid for HP Inc.

Boeing, which halted the production of its grounded 737 MAX aircraft in January, said on Sunday it would extend the suspension of production at its Washington state facilities until further notice.

Boeing is Hexcel’s second-biggest customer, accounting for a quarter of the company’s annual sales. Hexcel also supplies Airbus SE.

Woodward gets about 15% of its annual sales from Boeing, its biggest customer.

(Reporting by Ankit Ajmera in Bengaluru; Editing by Shounak Dasgupta and Devika Syamnath)

Boeing Extends Suspension of Puget Sound Production Ops

Boeing is extending the temporary suspension of production operations at all Puget Sound area and Moses Lake sites until further notice. These actions are being taken in light of the company’s continuing focus on the health and safety of employees, current assessment of the spread of COVID-19 in Washington state, the reliability of the supply chain and additional recommendations from government health authorities.

During the suspension, the company will continue to implement additional health and safety measures at its facilities to protect employees. These measures include new visual cues to encourage physical distancing, more frequent and thorough cleaning of work and common areas and staggering shift times to reduce the flow of employees arriving and departing work, among many other improvements.

“The health and safety of our employees, their families and our communities is our shared priority,” said Boeing Commercial Airplanes President and CEO Stan Deal. “We will take this time to continue to listen to our incredible team and assess applicable government direction, the spread of the coronavirus in the community and the reliability of our suppliers to ensure we are ready for a safe and orderly return to operations.”

The volunteers who have been supporting essential site and services work should continue to report to their assigned shifts. Puget Sound area and Moses Lake employees who can work from home should continue to do so.

As the suspension of operations continues, Boeing will monitor government guidance and actions on COVID-19 and associated impact on all company operations. Boeing sites that remain open are being monitored and assessed on a daily basis.

Volaris Announces Temporary Capacity Reduction

PRNewswire/ — Volaris (NYSE: VLRS), the ultra-low-cost airline serving Mexico, the United States and Central America, announces that pursuant to a decree published in the Official Gazette of the Federation, the Government of the United Mexican States, acting through the General Health Council (Consejo de Salubridad General (“GHC”)) declared a health emergency due to force majeure, as a result of the disease epidemic caused by the virus SARS-CoV-2 (COVID-19), known as Coronavirus, which will be in effect until April 30, 2002 (the “Declaration of Emergency”)

The Declaration of Emergency and the health security measures announced by the GHC, such as the suspension of non-essential activities in the public, private and social sector, as well as the call to the population to comply with stay at home, will impact the demand for passenger air transportation whilst the Declaration of Emergency is in effect.

As a result, from the date hereof, Volaris will make an additional capacity reduction to that which was advised on March 24, 2020.  Capacity measured by available seat miles (ASMs) for the month of April, 2020 will reduce to approximately 80% of total operation versus the schedule originally published.

Volaris will continue to provide relevant market updates should further capacity, governmental travel restrictions or other liquidity preserving measures need to be implemented.

Volkswagen Extends Mexico Coronavirus Production Halt

An employee leaves the Volkswagen (VW) plant as the company will temporarily close its factories in Mexico amid growing worries over the spread of the coronavirus disease (COVID-19), in Puebla

MEXICO CITY (Reuters) – German automaker Volkswagen said on Wednesday it would extend until April 30 a suspension of activities at two production plants in central Mexico after the government declared a health emergency because of coronavirus.

Volkswagen <VOW.DE> is among manufacturers worldwide who are responding to a fall in demand, as well as supply chain challenges following measures taken to rein in the pandemic.

In a statement the company said the halt was extended from April 12 to comply with government orders for a suspension of all non-essential activities.

Volkswagen said it would continue to pay employees during the suspension. Mexico reported 37 deaths, up from 29 a day earlier, and 1,378 infections, up from 1,215, because of the virus.

(Reporting by Sharay Angulo; Writing by Stefanie Eschenbacher; Editing by Clarence Fernandez)

Tesla to Slash Headcount at Nevada Gigafactory by 75%

BEIJING/TOKYO (Reuters) – U.S. electric carmaker Tesla Inc <TSLA> plans to slash on-site staff at its Nevada battery plant by around 75% due to the coronavirus pandemic, the local county manager said on Thursday.

The move comes after its Japanese battery partner Panasonic Corp <6752.T> said it would scale down operations at the Nevada factory this week before closing it for 14 days.

The factory produces electric motors and battery packs for Tesla’s popular Model 3 sedans.

“Tesla has informed us that the Gigafactory in Storey County is reducing on-site staff by roughly 75% in the coming days,” Austin Osborne said in a post on the county’s website.

No further details were available and it was not clear how many employees work in the factory. Tesla did not immediately respond to a Reuters request for comment.

The Reno Gazette Journal, which earlier reported the planned suspension, said Panasonic has about 3,500 employees at the Nevada plant.

Tesla said last week it would temporarily suspend production at its vehicle factory in San Francisco Bay Area from end of March 23, as well as at its New York solar roof tile factory.

However, Tesla CEO Elon Musk said the company will reopen the New York plant “as soon as humanly possible” to manufacture ventilators for coronavirus patients.

Two employees of Tesla have tested positive for coronavirus but have been working from home for the past two weeks and had not been symptomatic at work, Tesla said in an email to employees on Thursday. It did not disclose which unit or at what location the employees work.

(Reporting by Yilei Sun and Makiko Yamazaki; Editing by Miyoung Kim and Himani Sarkar)

American Airlines Announces Additional Schedule Changes in Response to COVID-19

American Airlines Group Inc. (NASDAQ: AAL) will implement a phased suspension of additional long-haul international flights from the U.S. starting on March 16. This suspension will last through May 6. This change is in response to decreased demand and changes to U.S. government travel restrictions due to coronavirus (COVID-19). The airline will:

  • Reduce international capacity by 75% year over year — from March 16 to May 6
  • Continue to operate one flight daily from Dallas-Fort Worth (DFW) to London (LHR), one flight daily from Miami (MIA) to LHR and three flights per week from DFW to Tokyo (NRT)
  • Continue short-haul international flying, which includes flights to Canada, Mexico, Caribbean, Central America and certain markets in the northern part of South America, as scheduled

In addition to the international changes, the airline anticipates its domestic capacity in April will be reduced by 20% compared to last year and May’s domestic capacity will be reduced by 30% on a year over year basis.

International Route Changes

By region, the new schedule changes include the following: 

Asia, effective March 16 

  • American will suspend all remaining flights to Asia, except for three flights per week from DFW to NRT 

Australia and New Zealand, effective March 16

  • Suspending service from Los Angeles (LAX) to Auckland (AKL) effective March 16, which was slated to end seasonal flying on March 28
  • Suspending service from LAX to Sydney (SYD) effective March 16

Europe, phased suspension 

  • American will continue to operate one flight daily from DFW to LHR and MIA to LHR
  • Suspending flights from New York (JFK), Boston (BOS), Chicago (ORD), and LAX to LHR gradually over the next seven days to reaccommodate passengers and crew
  • LHR, Dublin (DUB) and Manchester (MAN) flights from Charlotte (CLT), Philadelphia (PHL) and Phoenix (PHX) will be suspended faster, as these airports are not approved gateways by the U.S. Department of Homeland Security. Final eastbound flights from CLT, PHL and PHX will be on March 15; final westbound flights returning from LHR, DUB and MAN will depart March 16
  • Continued suspensions in other parts of Europe, as previously announced, including the delayed start of some seasonal routes as well as flights to and from Amsterdam (AMS), Barcelona (BCN), Frankfurt (FRA), Madrid (MAD) and Munich (MUC) Paris (CDG) and Zurich (ZRH) through early May, or later, based on guidance from the U.S. government and customer demand 

South America, effective March 16 

  • Suspending service from JFK and MIA to Rio de Janeiro (GIG) and Georgetown, Guyana (GEO)
  • Suspending service from DFW, JFK and MIA to São Paulo (GRU)
  • Suspending service from DFW and MIA to:
    • Chile: Santiago (SCL)
    • Colombia: Bogota (BOG)
    • Ecuador: Guayaquil (GYE) and Quito (UIO)
    • Peru: Lima (LIM)
  • Suspending service from MIA to:
    • Brazil: Brasilia (BSB) and Manaus (MAO)
    • Colombia: Barranquilla (BAQ), Cartagena (CTG), Cali (CLO), Medellin (MDE) and Pereira (PEI)

These capacity reductions assume no slot waivers are in place other than those previously granted. At airports where demand exceeds airfield and/or terminal capacity, access is governed by slots that grant airlines permission to take off and land at specific times. Given the decrease in demand related to COVID-19, American has requested temporary relief from this usage requirement — otherwise known as requesting a slot waiver — to better align capacity with demand without the risk of losing valuable takeoff and landing slots for the future. American will continue to review its network and make adjustments as needed if waivers are granted.

Ryanair Suspends All Italian Flights Until Wednesday April 8

– Government extends restrictions to all of Italy

Ryanair today (Tues 10 Mar) announced the suspension of its full flight schedule to/from and within Italy, following the decision of the Italian Government to “lock down” the entire country to contain the spread of the Covid-19 virus.

These additional cuts will be implemented as follows:

  1. From 24:00hrs Weds 11 Mar until 24:00hrs Wed 8 Apr, Ryanair will suspend all Italian domestic flights.
  2. From 24:00hrs Fri 13 Mar until 24:00hrs Wed 8 Apr, Ryanair will suspend all Italian international flights.

All affected passengers have received email notices today informing them of these flight cancellations. Passengers looking for repatriation can obtain a free move to an earlier Ryanair flight operating up until midnight Fri 13  Mar. Affected passengers will be able to choose between a full refund or a travel credit that can be redeemed on Ryanair flights in the next 12 months.

Ryanair continues to comply fully with WHO and national Government guidance and travel bans. The situation is changing on a daily basis, and all passengers on flights affected by travel bans or cancellations, are receiving emails and are being offered flight transfers, full refunds or travel credits.

Ryanair apologises sincerely to all customers for these schedule disruptions, which are caused by national Government restrictions and the latest decision of the Italian Government to lock down the entire country to combat the Covid-19 virus.

Air New Zealand Suspends 2020 Earnings Guidance

Due to increased uncertainty surrounding the duration and scale of the Covid-19 outbreak, Air New Zealand has today announced that it will be withdrawing the full year 2020 earnings guidance it issued to the market on 24 February 2020 and reconfirmed at its interim results announcement on 27 February 2020.

Air New Zealand has taken numerous steps to mitigate the impact of reduced demand resulting from Covid-19, including reducing capacity on its Asia, Tasman and Domestic networks, redeploying its fuel efficient 787 Dreamliner fleet to drive operational efficiencies and using tactical pricing to stimulate demand on the impacted sectors. However, the airline now believes that the financial impact is likely to be more significant than previously estimated and with the situation evolving at such a rapid pace, the airline is not in a position to provide an earnings outlook to the market at this time. An update on earnings expectations will be provided when appropriate.

Over the course of the past week the airline has seen additional softness in demand with a decline in bookings across its network. The further spread of Covid-19 to countries outside of China, including New Zealand, has driven a downward shift in demand.

Chief Executive Officer Greg Foran says that it is increasingly clear that Covid-19 has created an unprecedented situation and it is difficult to predict future demand patterns.

“We have been continuously monitoring bookings and in recent days have seen a further decline which coincides with media coverage of the spread of Covid-19 to most countries on our network as well as here in New Zealand,” says Mr Foran.

In response the airline has implemented further capacity reductions to its network, which include extending the suspension of its Shanghai service through to the end of April, and additional consolidation of services across the Tasman, Pacific Islands and Domestic network in March and April.

As a result of these actions, Air New Zealand has reduced total capacity into Asia by 26 percent, and total overall network capacity by approximately 10 percent since the outbreak of Covid-19 started.

Like the vast majority of its industry peers, the airline is also pursuing a range of mitigations in response to the swift decline of demand. These include the deferral of non-urgent capital spend and non-critical business activity across operational and corporate functions.

Chief Executive Officer Greg Foran has voluntarily offered to reduce his base pay of $1.65 million by approximately 15% ($250,000) with the support of the Board, and Air New Zealand’s Executive team will extend their salary freeze that has been in place since May 2019. On top of this, the airline has implemented a hiring freeze for all roles that are non-critical and will offer operational staff the option to take unpaid leave in addition to managing annual leave balances.

“Air New Zealand is a strong and resilient business operated by a world-class team with deep experience having navigated prior shocks to our business and industry. While we have already made swift adjustments to our operations, we are prepared to take further actions to address the ongoing demand impact of Covid-19,” says Mr Foran.

Summary of Air New Zealand’s response since the Covid-19 outbreak

  • Overall capacity reductions of approximately 10% across the network, including:
    – Asia capacity reduction of 26% through June, including extension of Shanghai route suspension through April 
    – Tasman capacity reductions of 7% through June 
    – Pacific Islands capacity reductions of 6% through June 
    – Reductions across the Domestic network of approximately 4%, with a 10% to 15% reduction in March and April
  • Various labour initiatives including a voluntary reduction in CEO pay, a hiring freeze for all non-critical roles and voluntary unpaid leave for operational staff
  • Deferral of non-urgent capital spend and any non-critical business activity

Alstom at ElekBu 2020

Alstom presents its improved Aptis e-bus at ElekBu

28 January 2020 – Alstom will present its Aptis electric bus at ElekBu 2020, being held in Berlin from 4 to 5 February. After extensive testing in many French and European cities for the past two years, the serial design of Alstom’s innovative 100% electric mobility solution incorporates feedback from passengers and transport operators. Following test drives in major German cities such as Berlin, Hamburg and Munich, the serial 12 meters Aptis e-bus is to be shown at a roadshow in Germany this year.

The serial vehicles are based on an optimized global architecture requiring fewer spare parts references and considerably facilitating maintenance operations. Thanks to a wheel steering angle of more than 40°, its ease of insertion increases significantly. The 15% reduction in the total weight of the vehicle, combined with the use of new, more efficient and state of the art batteries, substantially increases range. Aptis now accommodates more passengers, with a capacity of 100 persons, while still offering them more fluidity thanks to large sliding doors. 

In addition to the technical improvements, Aptis can also boast significant improvements to passenger comfort. A new air-conditioning system that (fully electrical heat-pump) maximises thermal comfort and the panoramic rear lounge has been enhanced to give a feeling of increased space. The new hydraulic suspension allows superior comfort and sound insulation, making Aptis one of the quietest and most innovative buses on the market. The high level of comfort is also reflected in the many very positive passenger surveys.

“Alstom is pleased to present the Aptis at ElekBu, which is so important for the German market. In the last two years, we have gained important experiences in trial operation. This 100% electric mobility solution offers a new experience to passengers and drivers while meeting the new mobility challenges of urban areas,” underlines Guillaume Legoupil, Sales Director Aptis.

Aptis is particularly popular in France, where it is also built. It has already been chosen by Paris in the context of Europe’s largest call for tender for electric buses, as well as by the cities of Strasbourg, Grenoble, La Rochelle and Toulon. From February, the first series buses will be in regular service in Strasbourg.

« Older posts