{"id":7549,"date":"2020-02-12T21:02:37","date_gmt":"2020-02-13T03:02:37","guid":{"rendered":"http:\/\/planesintheair.com\/?p=7549"},"modified":"2020-02-12T21:02:37","modified_gmt":"2020-02-13T03:02:37","slug":"alstom-to-equip-another-19-ice-high-speed-trains-with-etcs","status":"publish","type":"post","link":"https:\/\/planesintheair.com\/?p=7549","title":{"rendered":"Alstom to Equip Another 19 ICE High-Speed Trains with ETCS"},"content":{"rendered":"\n<p>Alstom has obtained an order by Deutsche Bahn AG (DB) to retrofit 19 additional ICE1 high-speed trains with the newest ETCS\u00a0signalling standard. The retrofitting work, worth more than \u20ac10 million, is scheduled to be completed by September 2021.\u00a0<\/p>\n\n\n\n<p>The project is a follow-up contract for the ICE 1, of which Alstom had already retrofitted 39 trains for the commissioning of the VDE 8 high-speed line connecting Berlin and Munich. Since the opening of the high-speed line passenger numbers have more than doubled.&nbsp;<\/p>\n\n\n\n<p>\u2018We are delighted that Deutsche Bahn has again passed a vote of confidence in Alstom for this complex retrofit. This is a further step towards making Germany fit for digital rail guarantees Deutsche Bahn a uniform and flexibly deployable ICE fleet\u2019, says Dr. Joerg Nikutta, Alstom Managing Director Germany &amp; Austria.<\/p>\n\n\n\n<p>The contract includes development, design and manufacture of the digital signalling system ETCS Level 2 Baseline 3 as well as its installation, connection to existing train control systems and commissioning. The new system will ensure a continuous communication between the vehicle and the track<strong>.&nbsp;<\/strong><\/p>\n\n\n\n<p>The retrofitting work will be implemented in cooperation with several Alstom sites: Berlin, Braunschweig (installation design and project management), Charleroi, Belgium (product development, validation and assembly for ETCS) and Lyon\/Villeurbanne, France (manufacture of components). The conversion and recommissioning of the vehicles will be carried out at the ICE-plant in Hamburg-Eidelstedt.<\/p>\n\n\n\n<p>With 15 years of experience putting into service ERTMS Level 2 digital signalling solutions, Alstom is a global pioneer in its development and implementation. With projects in 30 countries, Alstom has installed nearly 40% of the Trackside ERTMS Level 2 equipment in service in Europe and equipped over 8,000 trains of 200 different types with its Atlas On-board ERTMS solution. Atlas is a scalable solution that can be adapted to all types of traffic and operational needs: passengers and freight, high-speed or suburban.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"506\" src=\"https:\/\/planesintheair.com\/wp-content\/uploads\/2020\/02\/3-format2020.jpg\" alt=\"\" class=\"wp-image-7550\" srcset=\"https:\/\/planesintheair.com\/wp-content\/uploads\/2020\/02\/3-format2020.jpg 900w, https:\/\/planesintheair.com\/wp-content\/uploads\/2020\/02\/3-format2020-300x169.jpg 300w, https:\/\/planesintheair.com\/wp-content\/uploads\/2020\/02\/3-format2020-768x432.jpg 768w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Alstom has obtained an order by Deutsche Bahn AG (DB) to retrofit 19 additional ICE1 high-speed trains with the newest ETCS signalling standard. The retrofitting work, worth more than <\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5637,8222,5992,2303,5878,7929,2203,4957,10194,4059,5676,10169,1210,10176,1397,4017,10195,10171,868,10182,1103],"tags":[3974,420,3342,10383,3239,160,6643,1927,2424,10386,1156,7317,3898,5701,5497,2908,10261,1350,1943,2020,2907,10388,6694,6822,1767,207,3170,571,9700,2957,3388,6791,6421,1795,10387,3607,1811,412,10384,995,1685,2902,10004,5433,3805,4804,5560,1149,2718,2347,1691,1658,10385,6542,1471],"class_list":["post-7549","post","type-post","status-publish","format-standard","hentry","category-business-news","category-consumer-news","category-economic-news","category-electric-vehicle-news","category-environmental-news","category-european-news","category-finance-news","category-global-politics","category-green","category-green-energy-news","category-international-news","category-news","category-railroad-news","category-stock-news-2","category-stock-news","category-train-news","category-transport","category-transportation","category-transportation-news","category-travel","category-travel-news","tag-additional","tag-airline","tag-alstom","tag-another","tag-austria","tag-aviation","tag-bahn","tag-belgium","tag-berlin","tag-braunschweig","tag-charleroi","tag-commissioning","tag-confidence","tag-connecting","tag-connection","tag-control","tag-deployable","tag-design","tag-deutsche","tag-development","tag-digital","tag-eidelstedt","tag-equip","tag-etcs","tag-europe","tag-france","tag-freight","tag-germany","tag-guarantees","tag-hamburg","tag-high","tag-ice","tag-installation","tag-line","tag-lyon","tag-manufacture","tag-munich","tag-news","tag-obtained","tag-order","tag-passenger","tag-rail","tag-retrofit","tag-signalling","tag-speed","tag-standard","tag-suburban","tag-systems","tag-train","tag-trains","tag-transport","tag-transportation","tag-vde","tag-villeurbanne","tag-vote"],"_links":{"self":[{"href":"https:\/\/planesintheair.com\/index.php?rest_route=\/wp\/v2\/posts\/7549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/planesintheair.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/planesintheair.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/planesintheair.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/planesintheair.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7549"}],"version-history":[{"count":1,"href":"https:\/\/planesintheair.com\/index.php?rest_route=\/wp\/v2\/posts\/7549\/revisions"}],"predecessor-version":[{"id":7551,"href":"https:\/\/planesintheair.com\/index.php?rest_route=\/wp\/v2\/posts\/7549\/revisions\/7551"}],"wp:attachment":[{"href":"https:\/\/planesintheair.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/planesintheair.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/planesintheair.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}