TOMORROWS TRANSPORTATION NEWS TODAY!

Tag: Office (Page 1 of 4)

Boeing Business Jets unveils premium cabin options for VIP jets

Las Vegas, Nevada, October 16, 2023, PRNewswire – Boeing Company (NYSE: BA) Business Jets (BBJ) customers have a new way to customize cabin interiors for the BBJ 737-7, reducing costs and accelerating delivery of new VIP jets, the company announced today. With BBJ Select, Boeing is offering a wide range of pre-designed cabin layouts and configurations to expedite installation, while lowering the total purchase price of the airplane. The company shared its new BBJ Select premium interiors at the National Business Aviation Association & Business Aviation Convention & Exhibition (NBAA-BACE) in Las Vegas.

From guest rooms and private offices to family rooms and VIP passenger seating configurations, customers select modules for each section of the airplane. In all, BBJ Select offers 144 unique modular cabin combinations in three different color palettes, covering the spectrum of personal, business and head-of-state airplane requirements.

Designed in collaboration with award-winning business jet completion centers Aloft AeroArchitects and Greenpoint Technologies, BBJ Select layouts eliminate costs for one-time engineering and related work for the installation of a clean sheet cabin design. To simplify the purchase experience, customers sign one contract with Boeing and the company oversees the design, build and delivery of the fully outfitted VIP aircraft.

BBJ Select cabins are exclusively available for the BBJ 737-7, the newest member of the BBJ 737 MAX family. With an unmatched combination of globe-spanning range, superior cabin space and best-in-class operating economics, the BBJ 737-7 can fly passengers over 15 hours non-stop while reducing fuel use and emissions compared to previous generation business jets. Built for daily flights, BBJs provide far higher reliability and retain more residual value compared to competitors.

 

 

 

Overland Airways of Nigeria receives its first E175

Abuja, Nigeria, 14 September 2023 – Overland Airways of Nigeria has received the first of three new Embraer (NYSE: ERJ) E175 E-Jets. The aircraft was delivered to the airline last week. The twenty-year old West African carrier, an affiliate of the Landover Aviation Services Company, also holds options for three additional aircraft.

Concurrent with the arrival of its new E175s, Overland is aggressively ramping up its presence in Nigeria. It has built a new corporate office and hangar facilities in Lagos. The airline is an Approved Maintenance Organization under the certification of the Nigerian Civil Aviation Authority.

Overland’s partner, Landover Aviation Services, runs one of IATA’s top ten aviation training institutions in Africa. The Landover Aviation Business School specializes in airline technical and operations, aviation management, and travel and tourism.

 

 

 

 

Stadler Sets Guinness Book of Records with FLIRT Akku Battery Only Train Journey

The three unit FLIRT Akku used for the record journey has been developed by Stadler since 2016 as a local CO2 neutral mobility solution for the climate-friendly operation of unelectrified railway routes. The vehicle was approved by the German Federal Railway Office and introduced to the public for the very first time in 2018. Ever since when the FLIRT Akku test carrier has travelled around 15,000 kilometers in battery only operation, before setting the world record for a regional train journey in battery-only mode without additional charge now.

Climate friendly bestseller FLIRT

The first Fast Light Intercity and Regional Train was developed in 2002 at the request of the Swiss Federal Railways SBB for the Zug city railway. Ever since the unit was put into service, the FLIRT has turned into an international bestseller with over 2,000 vehicles sold. These vehicles are being operated in 20 countries in virtually all climate zones, from the equator to the polar circle, with 528 of them operating in Germany alone. The single-decker regional and intercity multiple unit convinces with its flexibility in the process. The trains are configured for normal and broad gauge tracks, with top speeds of 160 to 200 km/h. Thus, the FLIRT can be customized to any individual client requirements in terms of its drive technology, number of seats, passenger flow and interior design. The lightweight aluminum construction and common components help to keep the operating, energy and maintenance costs low. Besides electric, diesel or bi-modal drives, the FLIRT is also available with climate-friendly battery and hydrogen propulsion.

With the FLIRT Akku train sets, Stadler has developed a so called BEMU (battery-electric multiple unit) that will run as both a classic EMU (electric multiple unit) under overhead contact cable or battery-operated on un-electrified routes. This makes it optimal for partly electrified routes that currently still need to be served with diesel trains. Stadler had already won the first green technology tender in Germany and sold 55 FLIRT Akkus to NAH.SH, the Schleswig-Holstein Local Transport Association in 2019. In November 2021, another order for 44 vehicles followed from Deutsche Bahn Regio. In addition Stadler is also building the first hydrogen-powered FLIRT for the San Bernardino County Transportation Authority (SBCTA) in the USA.

Image from gosbcta.com

Pentagon and Lockheed Martin Agree To F-35 Sustainment Contracts

FORT WORTH, Texas, Sept. 13, 2021 /PRNewswire/ — The F-35 Joint Program Office awarded the Lockheed Martin (NYSE: LMT) industry team annualized contracts covering fiscal years 2021-2023 to support operations and sustainment of the global F-35 fleet, supporting mission readiness and further reducing costs.

The annual contracts fund critical sustainment activities for aircraft currently in the fleet and build enterprise capacity to support the future fleet of more than 3,000 F-35 aircraft. This includes industry sustainment experts supporting base and depot maintenance, pilot and maintainer training, and sustaining engineering for the U.S. and our allies across the globe. It also covers fleet-wide data analytics and supply chain management for part repair and replenishment to enhance overall supply availability for the fleet.

The FY2021-2023 contracts represent a planned next step in further reducing overall operations and support costs for the F-35 program, which are shared between government and industry. Lockheed Martin has reduced our cost per flight hour by 44% in the past five years, with a forecasted reduction of an additional 40% in the next five years. The cost savings in the FY21-23 annualized sustainment contracts support Lockheed Martin’s efforts to realize these goals. The savings will be achieved through improved cost and velocity in our supply chain, continued reliability improvements, and greater manpower efficiencies to provide product support solutions across the growing, global fleet.  We remain committed to partnering with our customers and teammates to drive F-35 sustainment costs down.

The contracts also pave the way for a longer-term, Performance Based Logistics (PBL) agreement for the F-35 program. PBLs are an industry best practice, facilitating agile sustainment solutions for the fleet and incentivizing even further affordability and performance results. 

The F-35 Joint Program Office, together with each U.S. service, international operators and the F-35 industry team, leads F-35 sustainment and the Global Support Solution. The 2021 annualized sustainment contract will cover industry sustainment activities through Dec. 31, 2021.

Embraer Opens an Office in Hungary

Embraer announced today the opening of an office in Budapest, the capital of Hungary. The main objective is to foster cooperation in Hungary, which could result in future developments under new partnerships. The office also creates an administrative hub for projects development in Central and Eastern Europe.

This initiative is part of Embraer’s strategy to establish new partnerships in select markets. Some of the key aspects of this future cooperation are the collaborative efforts with new partners, long-term projects, and investment in reliable dual-use technology.

The office will employ Hungarian personnel, administrative and engineering staff that will work in close cooperation with Embraer’s teams in Brazil.

Tesla to set up electric car manufacturing unit in southern India

From Reuters News by By Bhargav Acharya and Aakriti Bhalla…

BENGALURU, India, February 14 (Reuters) – Billionaire Elon Musk’s Tesla, Inc. (Nasdaq: TSLA) will set up an electric-car manufacturing unit in the southern Indian state of Karnataka, according to a government document seen by Reuters on Saturday.

“The U.S. firm Tesla will be opening an electric car manufacturing unit in Karnataka,” the state government said in a brief statement.

The statement was part of a broader document outlining the highlights of India’s budget to its people in the local language of Kannada.

Click on the link below to read the full story!

https://finance.yahoo.com/news/1-tesla-set-electric-car-190327441.html

Alstom to Supply Taipei Integrated Metro Line 7 Extension

The Alstom-led consortium with Taiwanese engineering and contracting services company CTCI reached contractual close on 23 June 2020 for the Phase Two extension of Taipei Metro Line 7. The contract is valued at close to €424 million, with an Alstom share of approximately €248 million. 

Phase One, which was awarded by Systemwide E&M Project Office Department of Rapid Transit Systems of Taipei City Government (SEMPO) in 2018, has been extended to deliver a seamless customer experience on the new metro line, spanning an additional 13.3km with 13 stations as part of Phase Two. When fully completed around late 2028, the 22.8-kilometre medium-capacity metro line, also known as Wanda Zhonghe Shulin Line, will connect Taipei City to New Taipei City more seamlessly. In addition, passengers can look forward to more convenience travelling between the various districts within New Taipei City such as Chong-he, Shu-lin, Tu-chen, Xin-zhuang.  

Under the contract, Alstom will be responsible for the design, supply, manufacturing, testing and commissioning of 16 additional fully automated, four-car Metropolis trains, Urbalis 400 Communication Based Train Control (CBTC) signalling system, Supervisory Control and Data Acquisition (SCADA) system, as well as platform screen doors. The trains will be manufactured in Alstom’s Taubaté factory in Brazil, while the signalling system will be delivered by its Saint-Ouen site in France and Bangalore site in India. Alstom and CTCI will also jointly carry out project management and system integration. CTCI will provide the track work, power supply, depot equipment, Telecommunication and Ticketing systems.  

“Taipei Metro Line 7, which interchanges with five other lines, will be a game changer for the travelling public of Taipei, and Alstom is delighted to continue to be a part of this iconic project. The success of this project extension with SEMPO positions us as a reliable and trusted partner, established for the long term in Taiwan and well beyond our 40 years of active presence,” said Ling Fang, Senior Vice President of Alstom Asia-Pacific.

Alstom’s metros are world-leading, proven, safe and reliable trains that serve many of the world’s great cities, including Amsterdam, Barcelona, London, Paris and Singapore. Alstom has more than 65 years’ experience in the production of metros, having sold over 17,000 metro cars that operate in 55 cities around the world and carry 30 million passengers every day.

In Taiwan, Alstom provides signalling systems to all but one of Taipei’s metro lines and is currently supplying a driverless signalling system for Taichung Green metro line. In 2017, Alstom won its first tramway project in Taiwan, supplying its latest Citadis tram to Kaohsiung tramway line phase two.

Tesla Negotiating for Possible Texas Vehicle Assembly Plant

(Reuters) – Electric carmaker Tesla Inc is negotiating possible incentives with a Texas county that could bring a new auto assembly plant to the area near Austin, the state capital, the Austin American-Statesman reported on Monday.

Travis County Commissioners Court is scheduled to discuss terms of the deal on Tuesday, the paper reported, citing people with knowledge of the situation. A vote is expected in the coming weeks.

The paper said it was unclear whether negotiations with Travis County show that Tesla has picked the Austin region as the site for the plant, which would build the company’s electric pickup truck and Model Y SUV and employ thousands of people, or if the company is also negotiating with officials in Tulsa, Oklahoma.

Tesla officials could not immediately be reached to comment. The company’s chief executive, Elon Musk, has tweeted previously about the possibility of bringing a plant to Texas. Oklahoma also has been mentioned as a possible site.

Travis County officials declined to comment, and a spokesman for the Texas governor’s office did not immediately comment.

Last month, Texas Governor Greg Abbott said he had spoken with Musk about a potential plant.

Abbott’s comments came three days after Musk had threatened to move Tesla’s headquarters and future operations to Texas or Nevada after officials in California’s Alameda County, where Tesla’s only U.S. vehicle assembly plant is located, said the plant could not yet reopen because of coronavirus lockdown measures. The plant has since reopened.

Officials with the United Auto Workers union, which represents hourly workers at General Motors Co’s assembly plant in Arlington, Texas, said they believe a Tuesday county meeting will include talks about the possible deal. The union, which has unsuccessfully tried organizing Tesla’s Fremont, California, plant, called on Texas officials to obtain assurances from Tesla about any potential jobs.

(Reporting by Ben Klayman in Detroit and Brad Brooks in Austin, Texas; Editing by Leslie Adler and Jonathan Oatis)

Panasonic to Resume New York Tesla Production Wednesday

Panasonic Corporation (OTC: PCRFY) is looking to restart production at Tesla Inc.’s (NASDAQ: TSLA) New York manufacturing plant on Wednesday, the Verge reported Tuesday.

What Happened

The Japanese electronics giant will spend the first two days performing equipment checks, and standard manufacturing will start Friday, Panasonic North America Solar Energy Division President Mark Shima said in an internal email accessed by the Verge.

Shima told the employees that the company has “completed preparations under close collaboration with Tesla, such as preparation of masks, sanitizers and wipes, set new protocol for entrance, new rules in cafeteria and production floor, new seat assignment in the office area in order to keep 6′ to the next person.”

It isn’t immediately clear if Tesla is also restarting production at the solar panel manufacturing facility.

Why It Matters

A majority of manufacturing at the New York gigafactory has…

 Click the link below to view the full story!

https://finance.yahoo.com/news/panasonic-resume-production-teslas-york-040946178.html

Boeing X-37B Launches in Second Mission for U.S. Space Force

The Boeing [NYSE: BA]-built X-37B autonomous spaceplane today launched on top of a uniquely configured United Launch Alliance Atlas V rocket.

Boeing is the prime contractor for the X-37B spaceplane and facilitates the integration of all experiments into the vehicle ensuring they receive the correct power, thermal and data services required. Boeing also works to identify future reusable platform experiment opportunities on each mission.

The X-37B’s sixth mission is the first to use a service module with additional payload capability to support a variety of experiments for multiple government partners. The mission will deploy FalconSAT-8, a small satellite developed by the U.S. Air Force Academy and sponsored by the Air Force Research Laboratory, to conduct experiments on orbit. Further, two NASA experiments will study the impact of radiation and other space effects on certain materials and seeds used to grow food. Another experiment by the Naval Research Laboratory will transform solar power into radio frequency microwave energy which could then be transmitted to the ground. In addition, the mission will test reusable space vehicle technologies.

The X-37B first launched in April 2010. Originally designed for missions of 270 days duration, the X-37B has set endurance records during each of its five previous flights. Most recently, X-37B spent 780 days on orbit before returning to Earth in October 2019.

“The X-37B has shifted the paradigm and redefined efficiency in space development, said Jim Chilton, Boeing Space and Launch senior vice president. “The rapid technology advancements enabled by the program will benefit the entire space community and influence the next generation of spacecraft design.”

The X-37B program is a partnership between the Department of the Air Force Rapid Capabilities Office and the United States Space Force. Boeing program management, engineering, test and mission support functions for the Orbital Test Vehicle (OTV) program are conducted at Boeing sites in Southern California and Florida.

« Older posts